System for forming automatic production line control data

Assignee: Mitsubishi Electric Corp
•
Filing: 1992-06-15
•
Granted: 1995-03-28
•
Expires: 2012-06-15
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract An automatic production line control data forming system for use in a production design, control and preparation system for a production line comprising: a process planning system for inputting data such as configurations and tolerances which are provided on drawings, and performing a process planning operation with reference to production machine data; a production scheduling system for making day's schedule plans; and an automatic programming system for forming programs for production machines such as NC machine tools and robots. In the automatic production line control data forming system, configuration data and machining features of parts which have been formed during process planning are subjected to formal conversion and transmitted to the automatic programming system, to allow the automatic programming system to form NC programs; or the kinds, the numbers and the delivery dates of parts to be manufactured during a given period which are provided as an article production plan, and data on production machines for machining the parts and machining time therefor which are formed during process planning are subjected to formal conversion and transmitted to the production scheduling system, to allow the production scheduling system to form day's schedule plans.

Inventors

  • 👤 Satoru Fujita
  • 👤 Sadami Ouchi
  • 👤 Masahiro Ohnami

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-02 09:36
CPC Classifications
G; G05; G05B; G05B19/00; G05B19/02; G05B19/418; G05B19/41865; Y; Y02; Y02P; Y02P90/00; Y02P90/02; Y10; Y10S; Y10S706/00; Y10S706/902; Y10S706/903; Y10S706/904

Claims Analysis

Total Claims: 11
Claim 1
Independent Claim 203 words
An automatic production line control dam forming system for use in a production, design, control and preparation system for a production line, said system comprising: a process planning system for inputting an article producing plan and for performing a process planning operation in accordance with said input article producing plan, said process planning system including: a drawing inputting section for processing part drawings provided in said article producing plan to form part models; a solid modeler for forming three-dimensional configuration data; memory means for storing databases concerning production machines and materials; and a process planning expert system, responsive to said part drawings, said configuration data, and said memory means for determining said process plan; a production scheduling system for forming a schedule for a given period of time in accordance with said article producing plan and said process plan; an automatic programming system for forming programs for production machines; and means for converting configuration data and predetermined information provided in said process plan into a format suitable for use by said automatic programming system, and transmitting said converted data to said automatic programming system, wherein said automatic programming system uses said converted data received from said means for converting to form said programs.
Claim 2
Dependent Claim 203 words
An automatic production line control dam forming system for use in a production, design, control and preparation system for a production line, said system comprising: a process planning system for inputting an article producing plan and for performing a process planning operation in accordance with said input article producing plan, said process planning system including: a drawing inputting section for processing part drawings provided in said article producing plan to form part models; a solid modeler for forming three-dimensional configuration data; memory means for storing databases concerning production machines and materials; and a process planning expert system, responsive to said part drawings, said configuration data, and said memory means for determining said process plan; a production scheduling system for forming a schedule for a given period of time in accordance with said article producing plan and said process plan; an automatic programming system for forming programs for production machines; and means for converting configuration data and predetermined information provided in said process plan into a format suitable for use by said automatic programming system, and transmitting said converted data to said automatic programming system, wherein said automatic programming system uses said converted data received from said means for converting to form said programs.
Claim 3
Dependent Claim 17 words
The system according to claim 1, wherein said production machines comprise numerical controlled machine tools and robots.
Claim 4
Dependent Claim 25 words
The system according to claim 1, wherein said article producing plan comprises data representing configurations and tolerances provided on drawings of articles to be produced.
Claim 5
Dependent Claim 136 words
The system according to claim 1, further comprising: means for converting data representing kinds, numbers and delivery dates of parts to be manufactured during a given period which data is part of said article producing plan, and data on production machines for machining said parts and machining time therefor into a format suitable for use by said production scheduling system to allow said production scheduling system to form schedule plans for said given period of time and for transmitting said converted data to said production scheduling system; and means, when an appropriate workload balance on a production line connected upstream from said automatic production line control data forming system has been reached, for converting said data on production machines for machining parts to a format suitable to allow said automatic programming system to form said programs.
Claim 6
Dependent Claim 174 words
An automatic production line control data forming system for use in a production, design, control and preparation system for a production line, said system comprising: a process planning system for inputting an article producing plan including first data representing kinds, numbers and delivery dates of parts to be manufactured during a given period and second data on production machines for machining said parts and machining time therefor and for performing a process planning operation to produce a process plan in accordance with said input article producing plan; a production scheduling system for forming a schedule for a given period of time in accordance with said article producing plan and said process plan; an automatic programming system for forming programs for production machines and for receiving and converting said first data and said second data into a format suitable for use by said production scheduling system and transmitting said convened first and second data to said production scheduling system to allow said production scheduling system to form schedule plans for said given period of time.
Claim 7
Dependent Claim 174 words
An automatic production line control data forming system for use in a production, design, control and preparation system for a production line, said system comprising: a process planning system for inputting an article producing plan including first data representing kinds, numbers and delivery dates of parts to be manufactured during a given period and second data on production machines for machining said parts and machining time therefor and for performing a process planning operation to produce a process plan in accordance with said input article producing plan; a production scheduling system for forming a schedule for a given period of time in accordance with said article producing plan and said process plan; an automatic programming system for forming programs for production machines and for receiving and converting said first data and said second data into a format suitable for use by said production scheduling system and transmitting said convened first and second data to said production scheduling system to allow said production scheduling system to form schedule plans for said given period of time.
Claim 8
Dependent Claim 71 words
The system according to claim 5, wherein said process planning system comprises: a drawing inputting section for processing part drawings provided in said article producing plan to form part models; a solid modeler for forming three-dimensional configuration dam; memory means for storing databases concerning production machines and materials; and a process planning expert system, responsive to said part drawings, said configuration dam, and said memory means for determining said process plan.
Claim 9
Dependent Claim 17 words
The system according to claim 5, wherein said production machines comprise numerical controlled machine tools and robots.
Claim 10
Dependent Claim 25 words
The system according to claim 5, wherein said article producing plan comprises data representing configurations and tolerances provided on drawings of articles to be produced.
Claim 11
Dependent Claim 55 words
The system according to claim 5, further comprising: means, when an appropriate balance on a production line connected upstream from said automatic production line control data forming system has been reached, for converting said data on production machines for machining pans to a format suitable to allow said automatic programming system to form said programs.

References Cited (Backward Citations)

US4736306A Cited
US5033014A Cited
JPH0215949A Cited
US5249135A Cited
US4998206A Cited
US5093794A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1998-03-27 1998-09-26 1999-03-28 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 2002-03-27 2002-09-26 2003-03-28 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 2006-03-27 2006-09-26 2007-03-28 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag