← Back to Patent Explorer
US5351195A Expired / Lapsed US ⏱️ 0.0 years remaining

Method for improving manufacturing processes

Assignee: Accenture Global Services Ltd
•
Filing: 1993-03-12
•
Granted: 1994-09-27
•
Expires: 2013-03-12
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract The batch size of materials required for each process within a workstation based on a given shipment schedule, as well as the values of several other workstation variables that are determinative of workstation and factory performance are determined. With this information, the user of the invention may schedule production for the factory or spot and prioritize workstations requiring the most improvement, and determine the character and quantity of improvement.

Inventors

  • 👤 Mark A. Sherman

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-01 20:55
CPC Classifications
G; G05; G05B; G05B19/00; G05B19/02; G05B19/418; G05B19/41885; G06; G06Q; G06Q10/00; G06Q10/04; G06Q10/06; G05B2219/00; G05B2219/30; G05B2219/31; G05B2219/31385; G05B2219/31386; G05B2219/31388; G05B2219/32; G05B2219/32237; G05B2219/32262; G05B2219/32264; G05B2219/32265; G05B2219/32364; G05B2219/42; G05B2219/42137; Y; Y02; Y02P; Y02P90/00; Y02P90/02

Claims Analysis

Total Claims: 2
Claim 1
Independent Claim 132 words
A method for improving the output capacity level of a factory, the factory having a plurality of workstations performing one or more functions, each function operating on a batch of materials, the method comprising the steps of: inputting an output capacity level for the factory and a selected parameter for improvement; determining whether the maximum possible variation of the selected parameter would achieve the output capacity level; determining an achievable capacity output level when the maximum possible improvement of the parameter does not allow for the desired improved output capacity level; determining the amount of improvement required to achieve the output capacity level when the maximum possible improvement meets or exceeds the output capacity level; and adjusting the processes of one or more workstations of the factory to implement the parameter improvements.
Claim 2
Independent Claim 132 words
A method for improving the output capacity level of a factory, the factory having a plurality of workstations performing one or more functions, each function operating on a batch of materials, the method comprising the steps of: inputting an output capacity level for the factory and a selected parameter for improvement; determining whether the maximum possible variation of the selected parameter would achieve the output capacity level; determining an achievable capacity output level when the maximum possible improvement of the parameter does not allow for the desired improved output capacity level; determining the amount of improvement required to achieve the output capacity level when the maximum possible improvement meets or exceeds the output capacity level; and adjusting the processes of one or more workstations of the factory to implement the parameter improvements.

References Cited (Backward Citations)

US3891836A Cited
US3845286A Cited
US4058711A Cited
SU930320A1 Cited
US4628434A Cited
US4644480A Cited
US4802094A Cited
US4729105A Cited
US4796194A Cited
US4896269A Cited
US5280425A Cited
US5231567A Cited
US5216593A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1997-09-26 1998-03-28 1998-09-27 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 2001-09-26 2002-03-28 2002-09-27 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 2005-09-26 2006-03-28 2006-09-27 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag