Abstract
Abstract A method is provided, based on assigned drilling variables, for predicting the area of open region above a bed of cuttings resulting from drilling a high-angle well. The area of the bit used in drilling is compared with the area of the open region and drill pipe to determine a Hole-Cleaning Ratio. Occurrences of sticking of drill pipe or other drilling problems in prior-drilled wells are correlated with Hole Cleaning Ratio in those wells to determine a relationship for predicting risk of drilling problems in wells of interest. Risk factors so determined are used to modify conditions or equipment during drilling or to plan future wells.
Inventors
- 👤 Marco Rasi
- 👤 Eugene A. Sikirica
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-01 02:30
CPC Classifications
E; E21; E21B; E21B44/00; E21B7/00; E21B7/04
Claims Analysis
Total Claims: 16
Claim 1
Independent Claim
210 words
A method of calculating the equilibrium distance, H, across an open region above a bed of solids in a high-angle wellbore comprising: selecting values of drilling variables, the drilling variables comprising drilling fluid rheology, drilling fluid density, flow rate of drilling fluid, size of cuttings and density of cuttings; assuming a value of the dimension, H; calculating a hydraulic radius and relative roughness of the bed surface; calculating a generalized Reynolds number for flow in the open region above the bed to determine flow regime; determining a friction factor dependent on the generalized Reynolds number and flow regime; using the friction factor to calculate the shear stress at the surface of the bed; calculating a particle Reynolds Number for a shear velocity corresponding to the shear stress at the surface of the bed; determining a critical shear stress for erosion of the bed corresponding to the calculated particle Reynolds Number and comparing the shear stress at the surface of the bed to the critical shear stress; and iterating on the value of H until the shear stress at the surface of the bed and the critical shear stress for erosion are within a selected differential value to determine the equilibrium distance across the open region above the bed of solids.
Claim 2
Independent Claim
210 words
A method of calculating the equilibrium distance, H, across an open region above a bed of solids in a high-angle wellbore comprising: selecting values of drilling variables, the drilling variables comprising drilling fluid rheology, drilling fluid density, flow rate of drilling fluid, size of cuttings and density of cuttings; assuming a value of the dimension, H; calculating a hydraulic radius and relative roughness of the bed surface; calculating a generalized Reynolds number for flow in the open region above the bed to determine flow regime; determining a friction factor dependent on the generalized Reynolds number and flow regime; using the friction factor to calculate the shear stress at the surface of the bed; calculating a particle Reynolds Number for a shear velocity corresponding to the shear stress at the surface of the bed; determining a critical shear stress for erosion of the bed corresponding to the calculated particle Reynolds Number and comparing the shear stress at the surface of the bed to the critical shear stress; and iterating on the value of H until the shear stress at the surface of the bed and the critical shear stress for erosion are within a selected differential value to determine the equilibrium distance across the open region above the bed of solids.
Claim 3
Dependent Claim
31 words
The method of claim 1 further comprising the step of changing the value of a drilling variable to modify the equilibrium distance of the open region above the bed of solids.
Claim 4
Independent Claim
114 words
A method for decreasing the probability of sticking a drill string having a bit when drilling a hole at an angle to vertical of more than about 50 degrees comprising: using the size and design of the bit, determining the solid cross-sectional area of the bit; calculating the area of open region of the hole above a bed of cuttings in the hole; selecting drilling variables such that the calculated cross-sectional area of the open region of the hole above the bed of solids plus the cross-sectional area of the drill pipe is greater than about 0.9 times the solid cross-sectional area of the bit; and drilling the hole utilizing the selected drilling variables.
Claim 5
Independent Claim
114 words
A method for decreasing the probability of sticking a drill string having a bit when drilling a hole at an angle to vertical of more than about 50 degrees comprising: using the size and design of the bit, determining the solid cross-sectional area of the bit; calculating the area of open region of the hole above a bed of cuttings in the hole; selecting drilling variables such that the calculated cross-sectional area of the open region of the hole above the bed of solids plus the cross-sectional area of the drill pipe is greater than about 0.9 times the solid cross-sectional area of the bit; and drilling the hole utilizing the selected drilling variables.
Claim 6
Dependent Claim
48 words
The method of claim 3 further comprising the step of selecting the bit to have a solid cross-sectional area less than the calculated cross-sectional area of the open region in the hole with selected drilling variables plus the cross-sectional area of the drill pipe before drilling the hole.
Claim 7
Dependent Claim
22 words
The method of claim 3 wherein the calculations are performed and the drilling variables are adjusted during the drilling of the well.
Claim 8
Dependent Claim
202 words
The method of claim 3 wherein the calculation of the area of open region above the bed of cuttings comprises: assuming a value of the distance across the open region, H; calculating a hydraulic radius and relative roughness of the bed surface; calculating a generalized Reynolds number for flow in the open region above the bed to determine flow regime; looking up a friction factor dependent on the generalized Reynolds Number and flow regime determined; using the friction factor to calculate shear stress at the surface of the bed; calculating a particle Reynolds Number for the shear velocity corresponding to the shear stress at the surface of the bed; determining a critical shear stress for erosion of the bed corresponding to the calculated particle Reynolds Number and comparing the shear stress at the surface of the bed to the critical shear stress; iterating on the value of H until the shear stress at the surface of the bed and the critical shear stress for erosion are within a selected differential value to determine the equilibrium distance across the open region above the bed of solids; and calculating the cross-sectional area of the open region using the equilibrium distance and the hole diameter.
Claim 9
Independent Claim
99 words
A method for predicting a drilling problem in a high-angle well drilled with a drill pipe and a drill bit comprising: using data on drilling variables and drilling conditions in the well, calculating the cross-sectional area of an open region above a bed of cuttings in the well; determining the solid cross-sectional area of the drill pipe and drill bit used in the well; calculating the ratio of the sum of the cross-sectional areas of the open region plus the drill pipe to the cross-sectional area of the drill bit; and comparing the ratio to a pre- determined number.
Claim 10
Independent Claim
99 words
A method for predicting a drilling problem in a high-angle well drilled with a drill pipe and a drill bit comprising: using data on drilling variables and drilling conditions in the well, calculating the cross-sectional area of an open region above a bed of cuttings in the well; determining the solid cross-sectional area of the drill pipe and drill bit used in the well; calculating the ratio of the sum of the cross-sectional areas of the open region plus the drill pipe to the cross-sectional area of the drill bit; and comparing the ratio to a pre- determined number.
Claim 11
Dependent Claim
25 words
The method of claim 7 wherein the pre-determined number is modified by the ratio of the cross-sectional areas of the drill collars and the hole.
Claim 12
Independent Claim
199 words
A method for predicting the probability of a drilling problem in a high-angle well of interest comprising: calculating the area of an open region above a bed of solids which existed at a time prior to the occurrence of the drilling problem in a prior-drilled well or wells; determining the cross-sectional area of bits and drill pipe used in drilling the prior-drilled well or wells and calculating the ratios of cross-sectional areas of the bit and the open region plus the drill pipe at a plurality of times during drilling of the prior-drilled well or wells to determine a Hole-Cleaning Ratio at the times; determining the frequency of occurrence of the drilling problem within a pre-determined time after the time for which the Hole-Cleaning Ratio is determined in the prior-drilled well or wells; determining a relationship between the Hole-Cleaning Ratio and the frequency of occurrences of the drilling problem within a pre-determined time after the time for which the Hole-Cleaning Ratios are determined in the prior-drilled well or wells; determining the Hole-Cleaning Ratio in the well of interest; and applying the relationship to predict probability of the drilling problem occurring in the well of interest within the predetermined time.
Claim 13
Independent Claim
199 words
A method for predicting the probability of a drilling problem in a high-angle well of interest comprising: calculating the area of an open region above a bed of solids which existed at a time prior to the occurrence of the drilling problem in a prior-drilled well or wells; determining the cross-sectional area of bits and drill pipe used in drilling the prior-drilled well or wells and calculating the ratios of cross-sectional areas of the bit and the open region plus the drill pipe at a plurality of times during drilling of the prior-drilled well or wells to determine a Hole-Cleaning Ratio at the times; determining the frequency of occurrence of the drilling problem within a pre-determined time after the time for which the Hole-Cleaning Ratio is determined in the prior-drilled well or wells; determining a relationship between the Hole-Cleaning Ratio and the frequency of occurrences of the drilling problem within a pre-determined time after the time for which the Hole-Cleaning Ratios are determined in the prior-drilled well or wells; determining the Hole-Cleaning Ratio in the well of interest; and applying the relationship to predict probability of the drilling problem occurring in the well of interest within the predetermined time.
Claim 14
Dependent Claim
13 words
The method of claim 9 wherein the drilling problem is stuck drill string.
Claim 15
Dependent Claim
18 words
The method of claim 9 wherein the drilling problem is high overpull required for moving the drill pipe.
Claim 16
Dependent Claim
17 words
The method of claim 11 wherein the drilling problem is related to running casing in the well.
References Cited (Backward Citations)
US2043504A
Cited
US2252669A
Cited
US3040822A
Cited
US3461980A
Cited
US3762485A
Cited
US4298078A
Cited
US4423791A
Cited
US4491181A
Cited
US4473124A
Cited
US4496012A
Cited
US4643264A
Cited
US4646855A
Cited
US4791998A
Cited
US4890682A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1997-07-11 | 1998-01-10 | 1998-07-12 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 2001-07-11 | 2002-01-10 | 2002-07-12 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 2005-07-11 | 2006-01-10 | 2006-07-12 | $7700.00 | Window Closed / Lapsed |