Abstract

Abstract A method for controlling a production apparatus includes steps of providing production information in the form of a specified production time period with respect to a plurality of product types, calculating a production expectation value for each specified production time period, summing the production expectation values for each specified production time period for all the product types and then integer-processing the total number of product portions to be produced each day, providing each day with as many production orders as the integer-processed number of product portions to be produced on that day, and then determining by an average process what product type should be produced in each production order.

Inventors

  • 👤 Kuniya Kaneko
  • 👤 Harumichi Wakiyama
  • 👤 Tadasi Naito

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-27 09:55
CPC Classifications
G; G06; G06Q; G06Q10/00; G06Q10/06

Claims Analysis

Total Claims: 11
Claim 1
Independent Claim 225 words
A method for controlling a production apparatus comprising the steps of: providing production information in the form of a specified production time period and a number of products to be produced in the specified production time period with respect to each of a plurality of product types: calculating a first production expectation value for each specified production time period to be produced a day with respect to each of the product types, by dividing the number of products to be produced in each specified production time period by a number of days included in the respective specified production time period; summing the first production expectation values in each specified production time period for all the product types with respect to each day to calculate a total number of products to be produced each day, and then integer-processing the total number of products to be produced each day; generating a production order sequence providing as many production orders for each day as the integer-processed number of products to be produced on that day, and then average-processing production intervals by summing the production expectation values for each respective product type to determine what product type should be produced in each production order; and controlling a production apparatus to transfer a material to a production line based on the production order sequence generated, and producing the ordered product.
Claim 2
Independent Claim 225 words
A method for controlling a production apparatus comprising the steps of: providing production information in the form of a specified production time period and a number of products to be produced in the specified production time period with respect to each of a plurality of product types: calculating a first production expectation value for each specified production time period to be produced a day with respect to each of the product types, by dividing the number of products to be produced in each specified production time period by a number of days included in the respective specified production time period; summing the first production expectation values in each specified production time period for all the product types with respect to each day to calculate a total number of products to be produced each day, and then integer-processing the total number of products to be produced each day; generating a production order sequence providing as many production orders for each day as the integer-processed number of products to be produced on that day, and then average-processing production intervals by summing the production expectation values for each respective product type to determine what product type should be produced in each production order; and controlling a production apparatus to transfer a material to a production line based on the production order sequence generated, and producing the ordered product.
Claim 3
Dependent Claim 72 words
A method for controlling a production apparatus according to claim 1, wherein the integer-processing is executed by selecting an integer closest to a sum of the total number of product portions to be produced on a given day and a remainder from the previous day which is defined as the difference between the selected integer of the previous day and the number of product portions to be produced on the previous day.
Claim 4
Dependent Claim 169 words
A method for controlling a production apparatus according to claim 1, wherein the averaging process comprises: (a) calculating production expectation values using the following equations: X.sub.i1 =P.sub.i1 X.sub.ij =X.sub.ij-1 +P.sub.ij -D.sub.ij-1 where, X ij is a production expectation value for production of product type i and production order j, P ij is the sum of all production expectation values for each specified production time period with respect to production of product type i in a production day which includes the production of product type in the production order j, and D ij is a variable that is equal to a total number of product portions to be produced on the day that contains the production order j and the production of i-type products and is equal to 0 when there is no production of i-type products; and (b) selecting the largest X ij among the X ij s having the same production order number j to determine the product type i to be produced in the production order j.
Claim 5
Dependent Claim 19 words
A method for controlling a production apparatus according to claim 1, wherein the production order is a packing order.
Claim 6
Dependent Claim 27 words
A method for controlling a production apparatus according to claim 1, wherein the production order is a packing order in a complete knock down engine assembly line.
Claim 7
Dependent Claim 21 words
A method for controlling a production apparatus according to claim 1 wherein production information is input from a production schedule file.
Claim 8
Dependent Claim 24 words
A method for controlling a production apparatus according to claim 1, further comprising the step of inputting the production order to a production file.
Claim 9
Dependent Claim 49 words
A method for controlling a production apparatus according to claim 1, wherein the step of generating a production order sequence includes the step of employing a conversion table to convert the production order sequence to product type information and then transmitting this product type information to the production apparatus.
Claim 10
Independent Claim 366 words
A method for controlling a production apparatus comprising the steps of: providing production information in the form of a specified production time period and a number of products to be produced in the specified production time period with respect to each of a plurality of product types: calculating a first production expectation value for each specified production time period to be produced a day with respect to each of the product types by dividing the number of products to be produced in each specified production time period by a number of days included in the respective specified production time period; summing the first production expectation values in each specified production time period for all the product types with respect to each day to calculate a total number of products to be produced each day, and then integer-processing the total number of products to be produced each day; generating a production order sequence providing as many production orders for each day as the integer-processed number of products to be produced on that day; calculating a second production expectation value for production of each product type and each production order using the following equations: X.sub.i1 =P.sub.i1 X.sub.i1 =X.sub.ij-1 +P.sub.ij -D.sub.ij-1 wherein X ij is a second production expectation value for production of product type i and production order j; wherein P ij is the sum of all first production values for each specified production time period with respect to production of product type i in a day on which product type i is to be produced in production order j, and varies in accordance with the order j; wherein D ij is a variable that is equal to the total number of products to be produced on the day that contains the production order j and the production of product type i, and wherein D ij is equal to zero when there is no production of product type i; determining that a product type which has the largest second production expectation value in each production order should be produced in the production order; and controlling a production apparatus to transfer a material to a production line based on the production order sequence generated, and producing the ordered product.
Claim 11
Independent Claim 366 words
A method for controlling a production apparatus comprising the steps of: providing production information in the form of a specified production time period and a number of products to be produced in the specified production time period with respect to each of a plurality of product types: calculating a first production expectation value for each specified production time period to be produced a day with respect to each of the product types by dividing the number of products to be produced in each specified production time period by a number of days included in the respective specified production time period; summing the first production expectation values in each specified production time period for all the product types with respect to each day to calculate a total number of products to be produced each day, and then integer-processing the total number of products to be produced each day; generating a production order sequence providing as many production orders for each day as the integer-processed number of products to be produced on that day; calculating a second production expectation value for production of each product type and each production order using the following equations: X.sub.i1 =P.sub.i1 X.sub.i1 =X.sub.ij-1 +P.sub.ij -D.sub.ij-1 wherein X ij is a second production expectation value for production of product type i and production order j; wherein P ij is the sum of all first production values for each specified production time period with respect to production of product type i in a day on which product type i is to be produced in production order j, and varies in accordance with the order j; wherein D ij is a variable that is equal to the total number of products to be produced on the day that contains the production order j and the production of product type i, and wherein D ij is equal to zero when there is no production of product type i; determining that a product type which has the largest second production expectation value in each production order should be produced in the production order; and controlling a production apparatus to transfer a material to a production line based on the production order sequence generated, and producing the ordered product.

References Cited (Backward Citations)

US4459663A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1997-07-04 1998-01-03 1998-07-05 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 2001-07-04 2002-01-03 2002-07-05 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 2005-07-04 2006-01-03 2006-07-05 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag