← Back to Patent Explorer
US5325426A Expired / Lapsed US ⏱️ 0.0 years remaining

Method for overload prevention in a switching center of a communications network

Assignee: Siemens AG
•
Filing: 1992-04-06
•
Granted: 1994-06-28
•
Expires: 2012-04-06
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract Method for overload prevention in a switching center of a communication network. For optimizing the overload prevention of a switching center, the operating personnel assign fixed priority levels bundle-by-bundle to the ports of the trunks. Since this allocation is often implemented in an unprofessional manner, the behavior of the switching center is correspondingly unfavorable in case of an overload. In order to avoid this problem, the priority levels for ports of trunks are automatically assigned by the software of the switching center in accordance with the method for overload prevention.

Inventors

  • 👤 Walter Held

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-03 13:47
CPC Classifications
H; H04; H04M; H04M3/00; H04M3/22; H04M3/36; H04M3/365; H04Q; H04Q3/00; H04Q3/42; H04Q3/54; H04Q3/545; H04Q3/54575; H04Q3/54591

Claims Analysis

Total Claims: 15
Claim 1
Independent Claim 232 words
A method for overload prevention in a switching center having ports for subscriber lines and trunks of a communication network, comprising the steps of: (a) calculating a momentary overload level for the switching center from overload indicators for indicating traffic volume of components of the switching center; (b) handling a port of a subscriber line in conjunction with incoming call attempts in accordance with an allocated priority level; (c) cyclically allocating the priority levels to the port of the subscriber line, in that the priority level of the port of the subscriber line is incremented at predetermined time intervals with a lowest priority level following a highest priority level in the cycle; (d) implementing a comparison of the momentary priority level of the port of the subscriber line to the momentary overload level of the switching center for call attempt; (e) rejecting the call attempt of the port of the subscriber line when the comparison indicates that the momentary overload level is higher than the momentary priority level of the port of the subscriber line; (f) also treating a port of a normal trunk for incoming call attempts as a cyclically prioritized port; and (g) elevating the priority level of the cyclically prioritized port of a trunk by at least one priority level on a chronological average in comparison to the priority level of the cyclically prioritized port of a subscriber line.
Claim 2
Independent Claim 232 words
A method for overload prevention in a switching center having ports for subscriber lines and trunks of a communication network, comprising the steps of: (a) calculating a momentary overload level for the switching center from overload indicators for indicating traffic volume of components of the switching center; (b) handling a port of a subscriber line in conjunction with incoming call attempts in accordance with an allocated priority level; (c) cyclically allocating the priority levels to the port of the subscriber line, in that the priority level of the port of the subscriber line is incremented at predetermined time intervals with a lowest priority level following a highest priority level in the cycle; (d) implementing a comparison of the momentary priority level of the port of the subscriber line to the momentary overload level of the switching center for call attempt; (e) rejecting the call attempt of the port of the subscriber line when the comparison indicates that the momentary overload level is higher than the momentary priority level of the port of the subscriber line; (f) also treating a port of a normal trunk for incoming call attempts as a cyclically prioritized port; and (g) elevating the priority level of the cyclically prioritized port of a trunk by at least one priority level on a chronological average in comparison to the priority level of the cyclically prioritized port of a subscriber line.
Claim 3
Dependent Claim 26 words
The method according to claim 1, wherein a small number of the ports of the trunks have fixed-priorities with the highest priority level for special purpose.
Claim 4
Dependent Claim 41 words
The method according to claim 1, wherein the method further comprises treating the port of a trunk for incoming call attempts, that come from an exchange ranking higher in a routing hierarchy, as permanently prioritized ports having a high priority level.
Claim 5
Dependent Claim 18 words
The method according to claim 2, wherein the special purpose is for trunks connected to emergency call equipment.
Claim 6
Dependent Claim 17 words
The method according to claim 2, wherein the special purpose is for transition to military communication networks.
Claim 7
Dependent Claim 235 words
Method for overload prevention in a switching center having ports for subscriber lines and trunks of a communication network, comprising the steps of: (a) providing at least one overload indicator that is indicative of traffic volume of at least one component of the switching center; (b) calculating a momentary overload level for the switching center from the at least one overload indicator; (c) cyclically allocating priority levels to at least some of the ports of the subscriber lines and to at least some of the ports of the trunks such that a priority level of a respective port is incremented at predetermined time intervals to a next higher priority level with a lowest priority level following a highest priority level; (d) elevating the priority level of the at least some of the ports of the trunks by at least one priority level on a chronological average in comparison to the priority level of the at least some of the ports of the subscriber lines; (e) comparing a momentary priority level of a respective port of the at least some of the subscriber lines or of the at least some of the trunks to the momentary overload level of the switching center for call attempt thereof; and (f) rejecting the call attempt of the respective port when the comparison indicates that the momentary overload level is higher than the momentary priority level of the respective port.
Claim 8
Dependent Claim 235 words
Method for overload prevention in a switching center having ports for subscriber lines and trunks of a communication network, comprising the steps of: (a) providing at least one overload indicator that is indicative of traffic volume of at least one component of the switching center; (b) calculating a momentary overload level for the switching center from the at least one overload indicator; (c) cyclically allocating priority levels to at least some of the ports of the subscriber lines and to at least some of the ports of the trunks such that a priority level of a respective port is incremented at predetermined time intervals to a next higher priority level with a lowest priority level following a highest priority level; (d) elevating the priority level of the at least some of the ports of the trunks by at least one priority level on a chronological average in comparison to the priority level of the at least some of the ports of the subscriber lines; (e) comparing a momentary priority level of a respective port of the at least some of the subscriber lines or of the at least some of the trunks to the momentary overload level of the switching center for call attempt thereof; and (f) rejecting the call attempt of the respective port when the comparison indicates that the momentary overload level is higher than the momentary priority level of the respective port.
Claim 9
Dependent Claim 60 words
The method according to claim 6, wherein the at least some of the ports of the subscriber lines are cyclically allocated priority levels in the range of 0 to N, where N is a whole number, and wherein the at least some of the ports of the trunks are cyclically allocated priority levels in the range of 1 to N+1.
Claim 10
Dependent Claim 26 words
The method according to claim 6, wherein a small number of the ports of the trunks are permanently assigned the highest priority level for special purposes.
Claim 11
Dependent Claim 41 words
The method according to claim 6, wherein the method further comprises treating the port of a trunk for incoming call attempts, that come from an exchange ranking higher in a routing hierarchy, as permanently prioritized ports having a high priority level.
Claim 12
Dependent Claim 290 words
Method for overload prevention in a switching center having ports for subscriber lines and trunks of a communication network, comprising the steps of: (a) providing at least one overload indicator that is indicative of traffic volume of at least one component of the switching center; (b) calculating a momentary overload level for the switching center from the at least one overload indicator; (c) cyclically allocating priority levels to at least some of the ports of the subscriber lines and to at least some of the ports of the trunks such that a priority level of a respective port is incremented at predetermined time intervals to a next higher priority level with a lowest priority level following a highest priority level; (d) elevating the priority level of the at least some of the ports of the trunks by at least one priority level on a chronological average in comparison to the priority level of the at least some of the ports of the subscriber lines, such that the at least some of the ports of the subscriber lines being cyclically allocated priority levels in the range of 0 to N, where N is a whole number, and the at least some of the ports of the trunks being cyclically allocated priority levels in the range of 1 to N+1; (e) comparing a momentary priority level of a respective port of the at least some of the subscriber lines or of the at least some of the trunks to the momentary overload level of the switching center for a call attempt thereof; and (f) rejecting the call attempt of the respective port when the comparison indicates that the momentary overload level is higher than the momentary priority level of the respective port.
Claim 13
Dependent Claim 290 words
Method for overload prevention in a switching center having ports for subscriber lines and trunks of a communication network, comprising the steps of: (a) providing at least one overload indicator that is indicative of traffic volume of at least one component of the switching center; (b) calculating a momentary overload level for the switching center from the at least one overload indicator; (c) cyclically allocating priority levels to at least some of the ports of the subscriber lines and to at least some of the ports of the trunks such that a priority level of a respective port is incremented at predetermined time intervals to a next higher priority level with a lowest priority level following a highest priority level; (d) elevating the priority level of the at least some of the ports of the trunks by at least one priority level on a chronological average in comparison to the priority level of the at least some of the ports of the subscriber lines, such that the at least some of the ports of the subscriber lines being cyclically allocated priority levels in the range of 0 to N, where N is a whole number, and the at least some of the ports of the trunks being cyclically allocated priority levels in the range of 1 to N+1; (e) comparing a momentary priority level of a respective port of the at least some of the subscriber lines or of the at least some of the trunks to the momentary overload level of the switching center for a call attempt thereof; and (f) rejecting the call attempt of the respective port when the comparison indicates that the momentary overload level is higher than the momentary priority level of the respective port.
Claim 14
Dependent Claim 26 words
The method according to claim 10, wherein a small number of the ports of the trunks are permanently assigned the highest priority level for special purposes.
Claim 15
Dependent Claim 41 words
The method according to claim 10, wherein the method further comprises treating the port of a trunk for incoming call attempts, that come from an exchange ranking higher in a routing hierarchy, as permanently prioritized ports having a high priority level.

References Cited (Backward Citations)

US3517123A Cited
US3700822A Cited
US4199665A Cited
US4497979A Cited
US4658098A Cited
EP0213408A1 Cited
EP0213382A1 Cited
US4802205A Cited
US4860344A Cited
US5060258A Cited
US4907256A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1997-06-27 1997-12-27 1998-06-28 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 2001-06-27 2001-12-27 2002-06-28 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 2005-06-27 2005-12-27 2006-06-28 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag