Claims Analysis
Total Claims: 24
Claim 1
Independent Claim
120 words
In a process of completing a horizontal well in a hydrocarbon formation comprising the steps of providing a vertical well, drilling a curved well bore from the vertical well, drilling a horizontal well bore into the formation through the curved well bore, positioning a first section of a pipe string in the curved well bore and a second section of the pipe string in the vertical well, and cementing the pipe string in the curved well bore, the improvement comprising comminuting the pipe string in the vertical well and thereby providing a passage between the horizontal well bore section and the vertical well and then producing hydrocarbons from the horizontal well bore section through the passage into the vertical well.
Claim 2
Dependent Claim
120 words
In a process of completing a horizontal well in a hydrocarbon formation comprising the steps of providing a vertical well, drilling a curved well bore from the vertical well, drilling a horizontal well bore into the formation through the curved well bore, positioning a first section of a pipe string in the curved well bore and a second section of the pipe string in the vertical well, and cementing the pipe string in the curved well bore, the improvement comprising comminuting the pipe string in the vertical well and thereby providing a passage between the horizontal well bore section and the vertical well and then producing hydrocarbons from the horizontal well bore section through the passage into the vertical well.
Claim 3
Dependent Claim
40 words
The process of claim 1 wherein the providing step comprises drilling a vertical open hole and then drilling the curved well bore by sidetracking from the vertical open hole at a location above the bottom of the vertical open hole.
Claim 4
Dependent Claim
34 words
The process of claim 1 wherein the providing step comprises providing a vertical cased well and cutting a window through the vertical cased well and then drilling the curved well bore through the window.
Claim 5
Dependent Claim
90 words
The process of claim 1 wherein the step of drilling the curved well bore comprises setting a plug in the vertical well and then drilling the curved well bore at a location starting above the bottom of the plug and further comprising the steps of removing the plug from the vertical well to provide a sump below an intersection of the curved well bore and the vertical well, placing a pump in the sump and the producing step comprises pumping liquid hydrocarbons from the sump upwardly through the vertical well.
Claim 6
Dependent Claim
14 words
The process of claim 4 wherein the plug is a hardened pumpable impermeable material.
Claim 7
Dependent Claim
24 words
The process of claim 4 wherein the plug is a whipstock and the removing step comprises retrieving the whipstock upwardly through the vertical well.
Claim 8
Dependent Claim
20 words
The process of claim 6 wherein the whipstock includes a drillable locator and the retrieving step includes drilling the locator.
Claim 9
Dependent Claim
65 words
The process of claim 6 wherein the whipstock includes a lower assembly including means for anchoring the whipstock to the vertical cased well, a wedge shaped upper assembly, means pivoting the upper assembly on the lower assembly and a drillable shoulder on the upper assembly for standing the upper assembly away from the vertical cased well and the retrieving step includes drilling the drillable shoulder.
Claim 10
Dependent Claim
48 words
The process of claim 1 wherein the vertical well extends substantially into the subterranean formation and further comprising the step of establishing a radial flow pattern from the formation into the vertical well at a location below an intersection of the curved well bore and the vertical well.
Claim 11
Dependent Claim
32 words
The process of claim 9 wherein the vertical well is a vertical cased well and the establishing step comprises perforating the vertical cased well at a vertical elevation corresponding to the formation.
Claim 12
Dependent Claim
85 words
The process of claim 1 wherein the cementing step comprises affixing a plurality of radial metallic elements to the pipe string along a predetermined zone, running the pipe string into the well and positioning the zone at a location below an intersection of the curved well bore and the vertical well, and filling up an annulus between the pipe string and the curved well bore with a hardenable impermeable material and the comminuting step comprises comminuting the pipe string and cement in the vertical well.
Claim 13
Dependent Claim
55 words
The process of claim 1 wherein the vertical well comprises a multiplicity of joints of hard-to-drill metal joints and at least one joint of a drillable material substantially easier to drill than the hard-to-drill metal, and wherein the step of drilling a curved well bore comprises cutting a window through the joint of drillable material.
Claim 14
Dependent Claim
36 words
The process of claim 1 wherein the comminuting step comprises drilling up the pipe string and cement in the vertical well and circulating cuttings of the pipe string and cement upwardly out of the vertical well.
Claim 15
Dependent Claim
42 words
The process of claim 13 wherein the drilling up step comprises cutting an annulus through the pipe string and cement in the vertical well to produce a remnant of pipe string and cement and removing the remnant upwardly through the vertical well.
Claim 16
Dependent Claim
55 words
A process comprising drilling a well bore into the earth, running a casing string into the well bore including a plurality of first joints of hard-to-drill metal pipe and at least one second joint of pipe of a material easier-to-drill than the first joints, and cutting window in the casing string through the second joint.
Claim 17
Dependent Claim
55 words
A process comprising drilling a well bore into the earth, running a casing string into the well bore including a plurality of first joints of hard-to-drill metal pipe and at least one second joint of pipe of a material easier-to-drill than the first joints, and cutting window in the casing string through the second joint.
Claim 18
Dependent Claim
96 words
A well having a first vertical cased section extending into and communicating with a subterranean hydrocarbon bearing formation, a curved well bore section extending away from the first vertical cased section at a location above the bottom of the formation, a horizontal well bore section extending away from the curved well bore section and into the formation, a second vertical cased section extending below the curved well bore section and means for producing a first stream of hydrocarbons from the horizontal well bore section and a second stream of hydrocarbons from the second vertical cased section.
Claim 19
Dependent Claim
96 words
A well having a first vertical cased section extending into and communicating with a subterranean hydrocarbon bearing formation, a curved well bore section extending away from the first vertical cased section at a location above the bottom of the formation, a horizontal well bore section extending away from the curved well bore section and into the formation, a second vertical cased section extending below the curved well bore section and means for producing a first stream of hydrocarbons from the horizontal well bore section and a second stream of hydrocarbons from the second vertical cased section.
Claim 20
Dependent Claim
36 words
The well of claim 16 further comprising means commingling the first and second streams in the vertical cased section at a location above an intersection between the vertical cased well and the curved well bore section.
Claim 21
Dependent Claim
16 words
The well of claim 16 wherein the vertical cased section communicates with the formation through perforations.
Claim 22
Dependent Claim
37 words
The well of claim 16 wherein the formation is in a radial flow pattern with the vertical cased section and is in a second flow pattern with the horizontal well bore different than the radial flow pattern.
Claim 23
Dependent Claim
20 words
The well of claim 19 further comprising a pump in the vertical cased section below the top of the formation.
Claim 24
Dependent Claim
15 words
The well of claim 20 wherein the pump is below the bottom of the formation.