← Back to Patent Explorer
US5301324A Expired / Lapsed US ⏱️ 0.0 years remaining

Method and apparatus for dynamic work reassignment among asymmetric, coupled processors

Assignee: International Business Machines Corp
•
Filing: 1992-11-19
•
Granted: 1994-04-05
•
Expires: 2012-11-19
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A tightly-coupled processor complex comprises two or more processors, the complex being asymmetric in that a feature available on one processor is not available on at least one other processor. A work selection mechanism selects one of a set of one or more ready work units, each capable of execution on one or more of the asymmetric processors. A processor set identification function identifies an "indirect idle" set of processors which can participate as hosts in work reassignment to make use of a previously idle processor, and identifies an "indirect bump" set of processors which can participate as hosts in work reassignment to displace a lowest priority work unit previously executing - any work reassignment being initiated by an assigner means and comprising an optimized number of work reassignment steps reassigning work among one of the processor sets to accomplish a related assignment goal (making use of a previously idle processor, or displacing a lowest priority work unit).

Inventors

  • 👤 Pamela H. Dewey
  • 👤 William J. Glynn
  • 👤 Roger E. Hough
  • 👤 Manohar R. Rao

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-04 02:28
CPC Classifications
G; G06; G06F; G06F9/00; G06F9/06; G06F9/46; G06F9/50; G06F9/5005; G06F9/5027; G06F9/5044; G06F9/48; G06F9/4806; G06F9/4843; G06F9/485; G06F9/4856; G06F9/5055

Claims Analysis

Total Claims: 17
Claim 1
Independent Claim 216 words
An apparatus for dynamic work reassignment comprising: a. a tightly coupled processor complex comprising two or more processors, at least one of said two or more processors having a feature usable by any work unit executing on said at least one processor; b. one or more ready work units, each of said ready work units capable of execution on one or more of said two or more processors; c. a control function means for allocating resources among work units, said control function means comprising assignment means for assigning a chosen one of said one or more ready work units to a target one of said two or more processors, said assignment means comprising: i) processor set identification means for identifying a set of one or more destination processors within said tightly coupled processor complex to which currently running work, displaced directly or indirectly because of said assigning, can be redirected to other one of said two or more processors by one or more work redirection actions; ii) analysis means for analyzing the work redirection actions that result from different choices of said target from among said two or more processors, and, based on said analyzing, selecting said target so that said work redirection actions are projected, by said analyzing, to satisfy a specific processor complex goal.
Claim 2
Independent Claim 216 words
An apparatus for dynamic work reassignment comprising: a. a tightly coupled processor complex comprising two or more processors, at least one of said two or more processors having a feature usable by any work unit executing on said at least one processor; b. one or more ready work units, each of said ready work units capable of execution on one or more of said two or more processors; c. a control function means for allocating resources among work units, said control function means comprising assignment means for assigning a chosen one of said one or more ready work units to a target one of said two or more processors, said assignment means comprising: i) processor set identification means for identifying a set of one or more destination processors within said tightly coupled processor complex to which currently running work, displaced directly or indirectly because of said assigning, can be redirected to other one of said two or more processors by one or more work redirection actions; ii) analysis means for analyzing the work redirection actions that result from different choices of said target from among said two or more processors, and, based on said analyzing, selecting said target so that said work redirection actions are projected, by said analyzing, to satisfy a specific processor complex goal.
Claim 3
Dependent Claim 62 words
The apparatus of claim 1 in which said processor set identification means comprises means for identifying, by an indirect idle mask, a subset of said set of one or more destination processors to accomplish the processor complex goal of redirecting work to a previously idle one of said two or more processors after completion of said one or more work redirection actions.
Claim 4
Dependent Claim 27 words
The apparatus of claim 2 further comprising means for ensuring that said one or more work redirection actions comprises a minimum number of said work redirection actions.
Claim 5
Dependent Claim 75 words
The apparatus of claim 1 in which said processor set identification means comprises means for identifying, by an indirect bump mask, a subset of said set of one or more destination processors to accomplish the processor complex goal of displacing a lowest priority work unit of a set of active work units executing on said subset of said set of one or more destination processors, after completion of said one or more work redirection actions.
Claim 6
Dependent Claim 27 words
The apparatus of claim 3 further comprising means for ensuring that said one or more work redirection actions comprises a minimum number of said work redirection actions.
Claim 7
Dependent Claim 27 words
The apparatus of claim 4 in which said assigner means further comprises means for ensuring that said assigning is not performed unless a specific criterion is satisfied.
Claim 8
Dependent Claim 27 words
The apparatus of claim 6 in which said specific criterion comprises a value, derived using a threshold, representing a maximum acceptable number of said work redirection actions
Claim 9
Independent Claim 444 words
An apparatus for dynamic work reassignment comprising: a. a tightly coupled processor complex comprising two or more processors, at least one of said two or more processors having a feature usable by any work unit executing on said at least one processor; b. one or more ready work units, each of said ready work units capable of execution on one or more of said two or more processors; c. a control function means for allocating resources among work units, said control function means comprising assignment means for assigning a chosen one of said one or more ready work units to a target one of said two or more processors, said assignment means comprising: i) processor set identification means for identifying a set of one or more destination processors within said tightly coupled processor complex to which currently running work, displaced directly or indirectly because of said assigning, can be redirected to other one of said two or more processors by one or more work redirection actions, said processor set identification means comprising means for identifying, by an indirect idle mask, a first subset of said set of one or more destination processors to accomplish a processor complex goal of redirecting work to a previously idle one of said two or more processors after completion of said one or more work redirection actions, said processor set identification means further comprising means for identifying, by an indirect bump mask, a second subset of said set of one or more destination processors to accomplish the processor complex goal of displacing a lowest priority work unit of a set of active work units executing on said second subset of said set of processors, after completion of said one or more work redirection actions; ii) analysis means for analyzing the work redirection actions that result from different choices of said target from among said two or more processors, and, based on said analyzing, selecting said target so that said work redirection actions are projected by said analyzing, to satisfy a specific processor complex goal said first subset of processors being used by said analysis means if said first subset is not empty, said second subset being used by said analysis means if said first subset is empty, said analysis means further comprising means for ensuring that, when said first subset is empty, said assigning is not performed unless a total number of said work redirection actions is less than a threshold derived value, said threshold derived value indicating a maximum acceptable number of said work redirection actions; d. minimization means for ensuring that said one or more work redirection actions comprises a minimum number of said work redirection actions.
Claim 10
Independent Claim 444 words
An apparatus for dynamic work reassignment comprising: a. a tightly coupled processor complex comprising two or more processors, at least one of said two or more processors having a feature usable by any work unit executing on said at least one processor; b. one or more ready work units, each of said ready work units capable of execution on one or more of said two or more processors; c. a control function means for allocating resources among work units, said control function means comprising assignment means for assigning a chosen one of said one or more ready work units to a target one of said two or more processors, said assignment means comprising: i) processor set identification means for identifying a set of one or more destination processors within said tightly coupled processor complex to which currently running work, displaced directly or indirectly because of said assigning, can be redirected to other one of said two or more processors by one or more work redirection actions, said processor set identification means comprising means for identifying, by an indirect idle mask, a first subset of said set of one or more destination processors to accomplish a processor complex goal of redirecting work to a previously idle one of said two or more processors after completion of said one or more work redirection actions, said processor set identification means further comprising means for identifying, by an indirect bump mask, a second subset of said set of one or more destination processors to accomplish the processor complex goal of displacing a lowest priority work unit of a set of active work units executing on said second subset of said set of processors, after completion of said one or more work redirection actions; ii) analysis means for analyzing the work redirection actions that result from different choices of said target from among said two or more processors, and, based on said analyzing, selecting said target so that said work redirection actions are projected by said analyzing, to satisfy a specific processor complex goal said first subset of processors being used by said analysis means if said first subset is not empty, said second subset being used by said analysis means if said first subset is empty, said analysis means further comprising means for ensuring that, when said first subset is empty, said assigning is not performed unless a total number of said work redirection actions is less than a threshold derived value, said threshold derived value indicating a maximum acceptable number of said work redirection actions; d. minimization means for ensuring that said one or more work redirection actions comprises a minimum number of said work redirection actions.
Claim 11
Independent Claim 207 words
A method for dynamic reassignment of work units in a tightly coupled data processing complex comprising two or more processors, at least one of the two or more processors having a feature usable by any work unit executing on said at least one processor, said method comprising the steps of: a. choosing one of a set of one or more ready work units for assignment consideration, each of said one or more ready work units capable of execution on one or more of said two or more processors; b. assigning a chosen one of said one or more ready work units to a target one of said two or more processors by: i) identifying a set of one or more destination processors within said tightly coupled processor complex to which currently running work, displaced directly or indirectly because of said assigning, can be redirected to other one of said two or more processors by one or more work redirection actions; ii) analyzing the work redirection actions that result from different choices of said target from among said two or more processors, and, based on said analyzing, selecting said target so that said work redirection actions are projected, by said analyzing, to satisfy a specific processor complex goal.
Claim 12
Independent Claim 207 words
A method for dynamic reassignment of work units in a tightly coupled data processing complex comprising two or more processors, at least one of the two or more processors having a feature usable by any work unit executing on said at least one processor, said method comprising the steps of: a. choosing one of a set of one or more ready work units for assignment consideration, each of said one or more ready work units capable of execution on one or more of said two or more processors; b. assigning a chosen one of said one or more ready work units to a target one of said two or more processors by: i) identifying a set of one or more destination processors within said tightly coupled processor complex to which currently running work, displaced directly or indirectly because of said assigning, can be redirected to other one of said two or more processors by one or more work redirection actions; ii) analyzing the work redirection actions that result from different choices of said target from among said two or more processors, and, based on said analyzing, selecting said target so that said work redirection actions are projected, by said analyzing, to satisfy a specific processor complex goal.
Claim 13
Dependent Claim 59 words
The method of claim 9 further comprising the step of identifying, by means of an indirect idle mask, a subset of said set of one or more destination processors to accomplish the processor complex goal of redirecting work to a previously idle one of said two or more processors after completion of said one or more work redirection actions.
Claim 14
Dependent Claim 25 words
The method of claim 10 further comprising the step of ensuring that no more than a minimum number of said work redirection actions are performed.
Claim 15
Dependent Claim 72 words
The method of claim 9 further comprising the step of identifying, by means of an indirect bump mask, a subset of said set of one or more destination processors to accomplish the processor complex goal of displacing a lowest priority work unit of a set of active work units executing on said subset of said set of one or more destination processors, after completion of said one or more work redirection actions.
Claim 16
Dependent Claim 25 words
The method of claim 12 further comprising the step of ensuring that no more than a minimum number of said work redirection actions are performed.
Claim 17
Dependent Claim 42 words
The method of claim 12 in which said step of assigning further comprises the step of insuring that said step of assigning is not performed unless no more than a threshold derived number of said work redirection actions are to be performed.

References Cited (Backward Citations)

US4073005A Cited
US4459664A Cited
US4394727A Cited
US4638427A Cited
US4943912A Cited
US5031089A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1997-04-04 1997-10-04 1998-04-05 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 2001-04-04 2001-10-04 2002-04-05 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 2005-04-04 2005-10-04 2006-04-05 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag