Claims Analysis
Total Claims: 13
Claim 1
Independent Claim
161 words
A meter for measuring electrical energy, comprising: means electrically connected to a load for metering a quantity of electrical energy consumed by the load; register means, operatively connected to said electrical energy metering means, for recording and displaying customer billing data based on the quantity of electrical energy consumed by the load; means responsive to user actuation for storing said customer billing data in said register means and for converting said meter from a customer billing data recording and displaying mode of operation to a test mode of operation; means, responsive to said storing and converting means, for computing an elapsed time during which said meter is in said test mode of operation; and means, responsive to said elapsed time computing means for retrieving said customer billing data from storage and for converting said meter from said test mode of operation to said customer billing data recording and displaying mode of operation, when said elapsed time equals a predetermined elapsed time.
Claim 2
Dependent Claim
161 words
A meter for measuring electrical energy, comprising: means electrically connected to a load for metering a quantity of electrical energy consumed by the load; register means, operatively connected to said electrical energy metering means, for recording and displaying customer billing data based on the quantity of electrical energy consumed by the load; means responsive to user actuation for storing said customer billing data in said register means and for converting said meter from a customer billing data recording and displaying mode of operation to a test mode of operation; means, responsive to said storing and converting means, for computing an elapsed time during which said meter is in said test mode of operation; and means, responsive to said elapsed time computing means for retrieving said customer billing data from storage and for converting said meter from said test mode of operation to said customer billing data recording and displaying mode of operation, when said elapsed time equals a predetermined elapsed time.
Claim 3
Dependent Claim
35 words
The meter of claim 1, wherein said register means comprises a solid-state microcontroller and liquid crystal register display electrically connected thereto, and wherein said storing and converting means comprises a switch on said register display.
Claim 4
Dependent Claim
36 words
The meter of claim 1, wherein said register means comprises a solid-state microcontroller and liquid crystal register display electrically connected thereto, and wherein said display comprises an optical port for accessing said storing and converting means.
Claim 5
Dependent Claim
47 words
The meter of claim 1, further comprising means responsive to user actuation for retrieving said customer billing data from storage and for converting said meter from said test mode of operation to said customer billing data recording and displaying mode of operation, irrespective of said elapsed time.
Claim 6
Dependent Claim
35 words
The meter of claim 4, wherein said register means comprises a solid-state microcontroller and liquid crystal register display electrically connected thereto, and wherein said storing and converting means comprises a switch on said register display.
Claim 7
Dependent Claim
36 words
The meter of claim 4, wherein said register means comprises a solid-state microcontroller and liquid crystal register display electrically connected thereto, and wherein said display comprises an optical port for accessing said storing and converting means.
Claim 8
Dependent Claim
22 words
The meter of claim 4, further comprising means responsive to user actuation for programming said predetermined elapsed time in said register means.
Claim 9
Dependent Claim
143 words
In a meter for measuring electrical energy, including means electrically connected to a load for metering a quantity of electrical energy consumed by the load and register means, for recording and displaying customer billing data based on the quantity of electrical energy consumed by the load, a method for automatically returning said register means for a test mode of operation comprising the steps of: storing said customer billing data in said register means in response to user actuation; converting said meter from a customer billing data recording and displaying mode of operation to a test mode of operation in response to user actuation; computing an elapsed time, beginning at the commencement of said meter converting step; and automatically retrieving said customer billing data from said register means and terminating said test mode of operation when said elapsed time equals a predetermined elapsed time.
Claim 10
Dependent Claim
143 words
In a meter for measuring electrical energy, including means electrically connected to a load for metering a quantity of electrical energy consumed by the load and register means, for recording and displaying customer billing data based on the quantity of electrical energy consumed by the load, a method for automatically returning said register means for a test mode of operation comprising the steps of: storing said customer billing data in said register means in response to user actuation; converting said meter from a customer billing data recording and displaying mode of operation to a test mode of operation in response to user actuation; computing an elapsed time, beginning at the commencement of said meter converting step; and automatically retrieving said customer billing data from said register means and terminating said test mode of operation when said elapsed time equals a predetermined elapsed time.
Claim 11
Dependent Claim
60 words
The method of claim 8, wherein said computing step is preceded by the step of programming a predetermined elapsed time into said register means and wherein said automatically retrieving step comprises the step of automatically retrieving said customer billing data from said register means and terminating said test mode of operation when said elapsed time equals said predetermined elapsed time.
Claim 12
Dependent Claim
22 words
The method of claim 9, wherein said storing step is preceded by the step of accessing an optical port on said meter.
Claim 13
Dependent Claim
39 words
The method of claim 9, wherein said automatically retrieving and terminating state terminates said test mode of operation when said elapsed time equals a predetermined elapsed time, notwithstanding that tests performed during said test mode of operation are incomplete.