Claims Analysis
Total Claims: 33
Claim 1
Independent Claim
224 words
In a data processing system comprising a central computer, and at least one workstation connected to the central computer through a communication system, a method of installing software files in said workstation comprising the steps of: transmitting a software file from said central computer to said workstation via said communication system; reading, by one or both of said central computer and said workstation, a configuration build file located in said central computer, said configuration build file containing one or more configuration parameters associated with said software file, said configuration parameters controlling configuration of said workstation; detecting, by said one or both of said central computer and said workstation, software files installed in said workstation; reading from said workstation, by said one or both of said central computer and said workstation, at least one configuration build file containing configuration parameters associated with said detected software files; combining, by said one or both of said central computer and said workstation, said configuration parameters contained in said configuration build file associated with said transmitted software file with said configuration parameters contained in said at least one configuration build file associated with said detected software files to generate a composite configuration build file; and reconfiguring said workstation using at least said composite configuration build file to reflect the configuration parameters required by installation of said transmitted software file.
Claim 2
Dependent Claim
224 words
In a data processing system comprising a central computer, and at least one workstation connected to the central computer through a communication system, a method of installing software files in said workstation comprising the steps of: transmitting a software file from said central computer to said workstation via said communication system; reading, by one or both of said central computer and said workstation, a configuration build file located in said central computer, said configuration build file containing one or more configuration parameters associated with said software file, said configuration parameters controlling configuration of said workstation; detecting, by said one or both of said central computer and said workstation, software files installed in said workstation; reading from said workstation, by said one or both of said central computer and said workstation, at least one configuration build file containing configuration parameters associated with said detected software files; combining, by said one or both of said central computer and said workstation, said configuration parameters contained in said configuration build file associated with said transmitted software file with said configuration parameters contained in said at least one configuration build file associated with said detected software files to generate a composite configuration build file; and reconfiguring said workstation using at least said composite configuration build file to reflect the configuration parameters required by installation of said transmitted software file.
Claim 3
Dependent Claim
24 words
A method as claimed in claim 1, further comprising the step of determining values of variables specifying configuration parameters within said configuration build files.
Claim 4
Dependent Claim
31 words
A method as claimed in claim 1, wherein said step of combining includes merging compatible configuration parameter statements to produce a combined configuration parameter statement within said composite configuration build file.
Claim 5
Dependent Claim
76 words
A method as claimed in claim 1, wherein said one or more configuration parameters required by said software file are associated with a priority value required by said software file, and said step of combining further comprises comparing, by said one or both of said central computer and said workstation, priority values between any conflicting configuration parameters and including a high priority configuration parameter in said composite configuration build file resulting from said priority values comparison.
Claim 6
Dependent Claim
24 words
A method as claimed in claim 4, further comprising the step of determining values of variables specifying configuration changes within said configuration build files.
Claim 7
Dependent Claim
24 words
A method as claimed in claim 4, wherein said step of combining includes merging compatible configuration parameter statement within said composite configuration build file.
Claim 8
Dependent Claim
31 words
A method as claimed in claim 2, wherein said step of combining includes merging compatible configuration parameter statements to produce a combined configuration parameter statement within said composite configuration build file.
Claim 9
Dependent Claim
31 words
A method as claimed in claim 5, wherein said step of combining includes merging compatible configuration parameter statements to produce a combined configuration parameter statement within said composite configuration build file.
Claim 10
Dependent Claim
219 words
In a data processing system comprising a central computer, and at least one workstation connected to the central computer through a communication system, a system for installing software files in said workstation comprising: transmitting means for transmitting a software file from said central computer to said workstation via said communication system; first reading means, coupled to said transmitting means, for reading a configuration build file located in said central computer, said configuration build file containing one or more configuration parameters associated with said software file, said configuration parameters controlling configuration of said workstation; detecting means, coupled to said transmitting means, for detecting software files installed in said workstation; second reading means, coupled to said transmitting means, for reading from said workstation at least one configuration build file containing configuration parameters associated with said detected software files; combining means, coupled to said transmitting means, for combining said configuration parameters contained in said configuration build file associated with said transmitted software file with said configuration parameters contained in said at least one configuration build file associated with said detected software files to generate a composite configuration build file; and reconfiguring means, coupled to said transmitting means, for reconfiguring said workstation using at least said composite configuration build file to reflect the configuration parameters required by installation of said transmitted software file.
Claim 11
Dependent Claim
219 words
In a data processing system comprising a central computer, and at least one workstation connected to the central computer through a communication system, a system for installing software files in said workstation comprising: transmitting means for transmitting a software file from said central computer to said workstation via said communication system; first reading means, coupled to said transmitting means, for reading a configuration build file located in said central computer, said configuration build file containing one or more configuration parameters associated with said software file, said configuration parameters controlling configuration of said workstation; detecting means, coupled to said transmitting means, for detecting software files installed in said workstation; second reading means, coupled to said transmitting means, for reading from said workstation at least one configuration build file containing configuration parameters associated with said detected software files; combining means, coupled to said transmitting means, for combining said configuration parameters contained in said configuration build file associated with said transmitted software file with said configuration parameters contained in said at least one configuration build file associated with said detected software files to generate a composite configuration build file; and reconfiguring means, coupled to said transmitting means, for reconfiguring said workstation using at least said composite configuration build file to reflect the configuration parameters required by installation of said transmitted software file.
Claim 12
Dependent Claim
66 words
A system as claimed in claim 9, wherein said one or more configuration changes required by said software file are associated with a priority value required by said software file, and said combining means further comprises comparing means for comparing priority values between any conflicting configuration changes and including a high priority configuration change in said composite configuration build file resulting from said priority values comparison.
Claim 13
Dependent Claim
24 words
A system as claimed in claim 9, further comprising determining means for determining values of variables specifying configuration changes within said configuration build files.
Claim 14
Dependent Claim
24 words
A system as claimed in claim 10, further comprising determining means for determining values of variables specifying configuration changes within said configuration build files.
Claim 15
Dependent Claim
35 words
A system as claimed in claim 9, wherein said combining means further comprises merging means for merging compatible configuration parameter change statements to produce a combined configuration parameter statement within said composite configuration build file.
Claim 16
Dependent Claim
34 words
A system as claimed in claim 10, wherein said combining means further comprises merging means for merging compatible configuration parameter statements to produce a combined configuration parameter statement within said composite configuration build file.
Claim 17
Dependent Claim
34 words
A system as claimed in claim 11, wherein said combining means further comprises merging means for merging compatible configuration parameter statements to produce a combined configuration parameter statement within said composite configuration build file.
Claim 18
Dependent Claim
34 words
A system as claimed in claim 12, wherein said combining means further comprises merging means for merging compatible configuration parameter statements to produce a combined configuration parameter statement within said composite configuration build file.
Claim 19
Dependent Claim
196 words
In a data processing system comprising a central computer, and at least one workstation connected to the central computer through a communication system, a method of installing software files in said workstation comprising the steps transmitting a software file from said central computer to said workstation via said communication system, said software file having first configuration build information containing one or more configuration parameters associated with said transmitted software file; detecting, by one or both of said central computer and said workstation, software files installed in said workstation; reading from said workstation, by said one or both of said central computer and said workstation, second configuration build information containing one or more configuration parameters associated with said detected software files; and combining, by said one of both of said central computer and said workstation, said configuration parameters contained in said first configuration build information associated with said transmitted software file with said configuration parameters contained in said second configuration build information associated with said detected software files to generate a composite configuration build file; and reconfiguring said workstation using at least said composite configuration build file to reflect the configuration required by said transmitted software file.
Claim 20
Dependent Claim
196 words
In a data processing system comprising a central computer, and at least one workstation connected to the central computer through a communication system, a method of installing software files in said workstation comprising the steps transmitting a software file from said central computer to said workstation via said communication system, said software file having first configuration build information containing one or more configuration parameters associated with said transmitted software file; detecting, by one or both of said central computer and said workstation, software files installed in said workstation; reading from said workstation, by said one or both of said central computer and said workstation, second configuration build information containing one or more configuration parameters associated with said detected software files; and combining, by said one of both of said central computer and said workstation, said configuration parameters contained in said first configuration build information associated with said transmitted software file with said configuration parameters contained in said second configuration build information associated with said detected software files to generate a composite configuration build file; and reconfiguring said workstation using at least said composite configuration build file to reflect the configuration required by said transmitted software file.
Claim 21
Dependent Claim
76 words
A method as claimed in claim 17, wherein said one or more configuration parameters required by said software file are associated with a priority value required by said software file, and said step of combining further comprises comparing, by said one or both of said central computer and said workstation, priority values between any conflicting configuration parameters and including a high priority configuration parameter in said composite configuration build file resulting from said priority values comparison.
Claim 22
Dependent Claim
27 words
A method as claimed in claim 17, further comprising the step of determining values of variables specifying configuration parameters within said first and second configuration build information.
Claim 23
Dependent Claim
27 words
A method as claimed in claim 18, further comprising the step of determining values of variables specifying configuration parameters within said first and second configuration build information.
Claim 24
Dependent Claim
31 words
A method as claimed in claim 17, wherein said step of combining includes merging compatible configuration parameter statements to produce a combined configuration parameter statement within said composite configuration build file.
Claim 25
Dependent Claim
31 words
A method as claimed in claim 18, wherein said step of combining includes merging compatible configuration parameter statements to produce a combined configuration parameter statement within said composite configuration build file.
Claim 26
Dependent Claim
31 words
A method as claimed in claim 19, wherein said step of combining includes merging compatible configuring parameter statements to produce a combined configuration parameter statement within said composite configuration build file.
Claim 27
Dependent Claim
31 words
A method as claimed in claim 20, wherein said step of combining includes merging compatible configuration parameter statements to produce a combined configuration parameter statement within said composite configuration build file.
Claim 28
Dependent Claim
205 words
In a data processing system comprising a central computer, and at least one workstation connected to the central computer through a communication system, a system for installing software files in said workstation comprising: transmitting means for transmitting a software file from said central computer to said workstation via said communication system, said software file having first configuration build information containing one or more configuration parameters associated with said transmitted software file; detecting means, coupled to said transmitting means, for detecting software files installed upon said workstation; reading means, coupled to said transmitting means, for reading from said workstation, by said one or both of said central computer and said workstation, second configuration build information containing one or more configuration parameters associated with said detected software files; combining means, coupled to said transmitting means, for combining said configuration parameters contained in said first configuration build information associated with said transmitted software file with said configuration parameters contained in said second configuration build information associated with said detected software files to produce a composite configuration build file; and reconfiguring means, coupled to said transmitting means, for reconfiguring said workstation using at least said composite configuration build file to reflect the configuration required by said transmitted software file.
Claim 29
Dependent Claim
205 words
In a data processing system comprising a central computer, and at least one workstation connected to the central computer through a communication system, a system for installing software files in said workstation comprising: transmitting means for transmitting a software file from said central computer to said workstation via said communication system, said software file having first configuration build information containing one or more configuration parameters associated with said transmitted software file; detecting means, coupled to said transmitting means, for detecting software files installed upon said workstation; reading means, coupled to said transmitting means, for reading from said workstation, by said one or both of said central computer and said workstation, second configuration build information containing one or more configuration parameters associated with said detected software files; combining means, coupled to said transmitting means, for combining said configuration parameters contained in said first configuration build information associated with said transmitted software file with said configuration parameters contained in said second configuration build information associated with said detected software files to produce a composite configuration build file; and reconfiguring means, coupled to said transmitting means, for reconfiguring said workstation using at least said composite configuration build file to reflect the configuration required by said transmitted software file.
Claim 30
Dependent Claim
167 words
In a data processing system comprising a central computer and at least one workstation connected to the central computer through a communication system, said workstation having workstation software files and first configuration build information containing configuration parameters associated with said workstation software files, a method of installing software files comprising the steps of: transmitting, by one or both of said central computer and said workstation, a software file from said central computer to said workstation via said communication system, said transmitted software file having second configuration build information containing configuration parameters associated with said workstation software files; combining, by one or both of said central computer and said workstation, said parameters contained in said first configuration build information with said parameters contained in said second configuration build information to produce a composite configuration build file; and reconfiguring, by said one of said central computer and said workstation, said workstation using at least said composite configuration build file to reflect the configuration required by said transmitted software file.
Claim 31
Dependent Claim
167 words
In a data processing system comprising a central computer and at least one workstation connected to the central computer through a communication system, said workstation having workstation software files and first configuration build information containing configuration parameters associated with said workstation software files, a method of installing software files comprising the steps of: transmitting, by one or both of said central computer and said workstation, a software file from said central computer to said workstation via said communication system, said transmitted software file having second configuration build information containing configuration parameters associated with said workstation software files; combining, by one or both of said central computer and said workstation, said parameters contained in said first configuration build information with said parameters contained in said second configuration build information to produce a composite configuration build file; and reconfiguring, by said one of said central computer and said workstation, said workstation using at least said composite configuration build file to reflect the configuration required by said transmitted software file.
Claim 32
Dependent Claim
175 words
In a data processing system comprising a central computer, and at least one workstation connected to the central computer through a communication system, said workstation having workstation software files and first configuration build information containing configuration parameters associated with said workstation software files, a system for installing software files within said workstation comprising: transmitting means for transmitting, by one or both of said central computer and said workstation, a software file from said central computer to said workstation via said communication system, said transmitted software file having second configuration build information containing configuration parameters associated with said workstation software files; combining means for combining, by said one of said central computer and said workstation, said parameters contained in said first configuration build information with said parameters contained in said second configuration build information to produce a composite configuration build file; and reconfiguring means for reconfiguring, by said one of said central computer and said workstation, said workstation using at least said composite configuration building file to reflect the configuration required by said transmitted software file.
Claim 33
Dependent Claim
175 words
In a data processing system comprising a central computer, and at least one workstation connected to the central computer through a communication system, said workstation having workstation software files and first configuration build information containing configuration parameters associated with said workstation software files, a system for installing software files within said workstation comprising: transmitting means for transmitting, by one or both of said central computer and said workstation, a software file from said central computer to said workstation via said communication system, said transmitted software file having second configuration build information containing configuration parameters associated with said workstation software files; combining means for combining, by said one of said central computer and said workstation, said parameters contained in said first configuration build information with said parameters contained in said second configuration build information to produce a composite configuration build file; and reconfiguring means for reconfiguring, by said one of said central computer and said workstation, said workstation using at least said composite configuration building file to reflect the configuration required by said transmitted software file.