US5223207A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Expert system for online surveillance of nuclear reactor coolant pumps
Assignee: UNITE STATES OF AMERICA ENERGY, Secretary of, Department of
•
Filing: 1992-01-29
•
Granted: 1993-06-29
•
Expires: 2012-01-29
Abstract
Abstract An expert system for online surveillance of nuclear reactor coolant pumps. This system provides a means for early detection of pump or sensor degradation. Degradation is determined through the use of a statistical analysis technique, sequential probability ratio test, applied to information from several sensors which are responsive to differing physical parameters. The results of sequential testing of the data provide the operator with an early warning of possible sensor or pump failure.
Inventors
- 👤 Kenny C. Gross
- 👤 Ralph M. Singer
- 👤 Keith E. Humenik
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-10-28 09:17
CPC Classifications
G; G21; G21C; G21C17/00; G05; G05B; G05B9/00; G05B9/02; G05B9/03; Y; Y02; Y02E; Y02E30/00; Y02E30/30; Y10; Y10S; Y10S706/00; Y10S706/902; Y10S706/911; Y10S706/914
Claims Analysis
Total Claims: 11
Claim 1
Independent Claim
123 words
An expert system for determining the operability of a specified pump comprising: a set of pumps of which the specified pump is a member; means for measuring physical parameters representative to the operations condition each pump of said set of pumps; means for acquiring data generated by said measuring means; an artificial-intelligence based inference engine coupled to said data acquiring means where said inference engine applies a sequential probability ratio test to statistically evaluate said acquired data to determine a status for the specified pump and its respective measuring means by continually monitoring and comparing changes in a specific operational parameter signal acquired from a plurality of measurement means; means for transferring said status generated by said interference engine to an output system.
Claim 2
Dependent Claim
123 words
An expert system for determining the operability of a specified pump comprising: a set of pumps of which the specified pump is a member; means for measuring physical parameters representative to the operations condition each pump of said set of pumps; means for acquiring data generated by said measuring means; an artificial-intelligence based inference engine coupled to said data acquiring means where said inference engine applies a sequential probability ratio test to statistically evaluate said acquired data to determine a status for the specified pump and its respective measuring means by continually monitoring and comparing changes in a specific operational parameter signal acquired from a plurality of measurement means; means for transferring said status generated by said interference engine to an output system.
Claim 3
Dependent Claim
24 words
The system of claim 1 wherein said measuring means employs at least two sensors to measure a specific physical parameter associated with each pump.
Claim 4
Dependent Claim
16 words
The system of claim 2 in which said measuring means measures a plurality of physical parameters.
Claim 5
Dependent Claim
35 words
The system of claim 3 in which said inference engine employs said sequential probability ratio test in an ordered preference for each physical parameter to determine if the specified pump or a sensor is degraded.
Claim 6
Dependent Claim
28 words
The system of claim 4 in which an audible alarm is sounded when said sensor or said specified pump is determined to be degraded by said inference engine.
Claim 7
Independent Claim
91 words
A method for early determination of pump or pump sensor degradation comprising the steps of: monitoring physical parameters representative of the operating condition of said pump through the use of a plurality of sensors; transmitting said data to a data acquisition system and subsequently to an artificial-intelligence inference engine; statistically analyzing on said data arriving at said inference engine through the use of a sequential probability ratio test; using said sequential probability ratio test to establish a status for said sensors and said pump; transmitting said status to an output device.
Claim 8
Independent Claim
91 words
A method for early determination of pump or pump sensor degradation comprising the steps of: monitoring physical parameters representative of the operating condition of said pump through the use of a plurality of sensors; transmitting said data to a data acquisition system and subsequently to an artificial-intelligence inference engine; statistically analyzing on said data arriving at said inference engine through the use of a sequential probability ratio test; using said sequential probability ratio test to establish a status for said sensors and said pump; transmitting said status to an output device.
Claim 9
Dependent Claim
65 words
The method of claim 6 which said sequential probability ratio test is conducted in a series of sequential if-then steps where each sensor is evaluated sequentially to determine if it is degraded and if said sensor is degraded passing said status to an audible alarm system as well as to an output display and if said sensor is not degraded proceeding to the next sensor.
Claim 10
Dependent Claim
44 words
The method of claim 7 where if said probability ratio test indicates that the system is degraded and if none of said sensors are degraded then determining that the pump is degraded and transmitting this information to an output device and an audible alarm.
Claim 11
Dependent Claim
23 words
The system of claim 1 where said physical parameters include: pump revolutions per minute, pump vibration measurements, pump power, and pump discharge pressure.
References Cited (Backward Citations)
USRE33162E
Cited
US4816208A
Cited
US4803040A
Cited
US4965743A
Cited
US4961898A
Cited
US5009833A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1996-06-28 | 1996-12-28 | 1997-06-29 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 2000-06-28 | 2000-12-28 | 2001-06-29 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 2004-06-28 | 2004-12-28 | 2005-06-29 | $7700.00 | Window Closed / Lapsed |