← Back to Patent Explorer
US5209104A Expired / Lapsed US ⏱️ 0.0 years remaining

Method for desaturating a porous rock for electrical resistivity measurements

Assignee: Mobil Oil AS
•
Filing: 1992-01-23
•
Granted: 1993-05-11
•
Expires: 2012-01-23
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A porous rock is saturated with a first fluid and electrical resistivity is measured along its length. A second fluid, immiscible with the first fluid, is injected into the porous rock at a first flow rate. This injection continues until displacement of the first fluid from the porous rock ceases and the pressure drop along the porous rock becomes constant, indicating a first residual fluid saturation equilibrium. The foregoing is repeated for a plurality of increasing second fluid injection flow rates to effect electrical resistivity measurements at decreasing residual fluid saturation equilibriums. The method may then be repeated substituting the second fluid for the first and vice versa to perform an imbibition experiment.

Inventors

  • 👤 Samuel H. Collins
  • 👤 Eve S. Sprunt

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-30 16:09
CPC Classifications
G; G01; G01N; G01N33/00; G01N33/24; G01N33/241

Claims Analysis

Total Claims: 26
Claim 1
Independent Claim 223 words
A method for desaturating a porous rock for electrical resistivity measurements, comprising the steps of: a) saturating a porous rock with a first fluid to effect a first fluid saturation throughout said porous rock, b) measuring electrical resistivity along a selected length of said first fluid saturated porous rock, c) injecting a second fluid which is immiscible with and of opposite electrical conductance with said first fluid into said porous rock at a first flow rate to displace a portion of said first fluid from said porous rock and effect a second fluid saturation within said porous rock that is a minimum partial fluid saturation with respect to said first fluid saturation for said first flow rate, d) measuring pressure drop across a selected length of said porous rock, e) terminating the injection of said second fluid at said first flow rate when displacement of said first fluid from said porous rock ceases and the measured pressure drop along the selected length of said porous rock is constant, thereby effecting a first residual fluid saturation equilibrium within said porous rock, f) measuring electrical resistivity along said selected length of porous rock at said first residual fluid saturation equilibrium, and g) repeating steps c) - f) for each of a plurality of increasing second fluid flow rates to effect decreasing residual fluid saturation equilibriums.
Claim 2
Independent Claim 223 words
A method for desaturating a porous rock for electrical resistivity measurements, comprising the steps of: a) saturating a porous rock with a first fluid to effect a first fluid saturation throughout said porous rock, b) measuring electrical resistivity along a selected length of said first fluid saturated porous rock, c) injecting a second fluid which is immiscible with and of opposite electrical conductance with said first fluid into said porous rock at a first flow rate to displace a portion of said first fluid from said porous rock and effect a second fluid saturation within said porous rock that is a minimum partial fluid saturation with respect to said first fluid saturation for said first flow rate, d) measuring pressure drop across a selected length of said porous rock, e) terminating the injection of said second fluid at said first flow rate when displacement of said first fluid from said porous rock ceases and the measured pressure drop along the selected length of said porous rock is constant, thereby effecting a first residual fluid saturation equilibrium within said porous rock, f) measuring electrical resistivity along said selected length of porous rock at said first residual fluid saturation equilibrium, and g) repeating steps c) - f) for each of a plurality of increasing second fluid flow rates to effect decreasing residual fluid saturation equilibriums.
Claim 3
Dependent Claim 72 words
The method of claim 1 wherein said step of saturating said porous rock with said first fluid to effect said first fluid saturation comprises the steps of: a) injecting said first fluid into said porous rock in a first flow direction through said porous rock, and b) injecting said first fluid into said porous rock under back pressure in an opposite flow direction to said first flow direction through said porous rock.
Claim 4
Dependent Claim 23 words
The method of claim 1 further comprising the step of repeating steps c) - g) with progressively increasing viscosities for said second fluid.
Claim 5
Dependent Claim 18 words
The method of claim 1 wherein said first fluid saturation is a complete saturation of said porous rock.
Claim 6
Dependent Claim 50 words
The method of claim 1 further comprising the step of determining the ratio of the measured pressure drop along the selected length of porous rock in step d) to the injected flow rate of said second fluid in step c) as a measure of particle migration through said porous rock.
Claim 7
Dependent Claim 19 words
The method of claim 1 wherein said steps are carried out under a confining pressure on said porous rock.
Claim 8
Dependent Claim 16 words
The method of claim 1 wherein said steps are carried out on a homogeneous porous rock.
Claim 9
Dependent Claim 11 words
The method of claim 1 wherein said first fluid is brine.
Claim 10
Dependent Claim 12 words
The method of claim 1 wherein said second fluid is a hydrocarbon.
Claim 11
Dependent Claim 11 words
The method of claim 9 wherein said second fluid is oil.
Claim 12
Dependent Claim 22 words
The method of claim 10 wherein steps c) - g) of claim 1 are carried out for progressively increasing viscosities of oil.
Claim 13
Dependent Claim 11 words
The method of claim 9 wherein said second fluid is gas.
Claim 14
Dependent Claim 51 words
The method of claim 1 further comprising the step of repeating steps c) - g) with said first fluid being the injecting fluid in place of said second fluid and said second fluid being the displaced fluid in place of said first fluid, thereby effecting an imbibition cycle of fluid displacement.
Claim 15
Independent Claim 220 words
A method for desaturating a porous rock for electrical resistivity measurements, comprising the steps of: a) saturating a porous rock with a first fluid to effect a first fluid saturation throughout said porous rock, b) measuring electrical resistivity along a selected length of said first fluid saturated porous rock, c) injecting a second fluid which is immiscible with and of opposite electrical conductance with said first fluid into said porous rock at a first flow rate to displace a portion of said first fluid from said porous rock and effect a second fluid saturation within said porous rock that is a minimum partial fluid saturation with respect to said first fluid saturation for said first flow rate, d) measuring pressure drop across a selected length of said porous rock, e) terminating the injection of said second fluid at said first flow rate when displacement of said first fluid from said porous rock ceases and the measured pressure drop along the selected length of said porous rock is constant, thereby effecting a first residual fluid saturation equilibrium within said porous rock, f) measuring electrical resistivity along said selected length of porous rock at said first residual fluid saturation equilibrium, and g) repeating steps c) - f) with progressively increasing viscosities for said second fluid to effect decreasing residual fluid saturation equilibriums.
Claim 16
Independent Claim 220 words
A method for desaturating a porous rock for electrical resistivity measurements, comprising the steps of: a) saturating a porous rock with a first fluid to effect a first fluid saturation throughout said porous rock, b) measuring electrical resistivity along a selected length of said first fluid saturated porous rock, c) injecting a second fluid which is immiscible with and of opposite electrical conductance with said first fluid into said porous rock at a first flow rate to displace a portion of said first fluid from said porous rock and effect a second fluid saturation within said porous rock that is a minimum partial fluid saturation with respect to said first fluid saturation for said first flow rate, d) measuring pressure drop across a selected length of said porous rock, e) terminating the injection of said second fluid at said first flow rate when displacement of said first fluid from said porous rock ceases and the measured pressure drop along the selected length of said porous rock is constant, thereby effecting a first residual fluid saturation equilibrium within said porous rock, f) measuring electrical resistivity along said selected length of porous rock at said first residual fluid saturation equilibrium, and g) repeating steps c) - f) with progressively increasing viscosities for said second fluid to effect decreasing residual fluid saturation equilibriums.
Claim 17
Dependent Claim 33 words
The method of claim 14 further comprising the step of repeating steps c) - g) for each of a plurality of increasing second fluid flow rates to effect decreasing residual fluid saturation equilibriums.
Claim 18
Dependent Claim 51 words
The method of claim 14 further comprising the step of repeating steps c) - g) with said first fluid being the injecting fluid in place of said second fluid and said second fluid being the displaced fluid in place of said first fluid, thereby effecting an imbibition cycle of fluid displacement.
Claim 19
Independent Claim 232 words
A method for desaturating a porous rock for electrical resistivity measurements, comprising the steps of: a) injecting a brine into a porous rock in a first direction through said porous rock, b) injecting said brine into said porous rock under back pressure in an opposite flow direction to said first flow direction to effect a brine saturation throughout said porous rock, c) measuring the electrical resistivity along a selected length of said brine-saturated porous rock, d) injecting an oil into said porous rock at a first flow rate to displace a portion of said brine from said porous rock and effect a brine saturation within said porous rock that is a minimum brine saturation with respect to said first oil flow rate, e) monitoring the displacement of brine from said porous rock, f) measuring pressure drop across a selected length of said porous rock, g) terminating the injection of oil at said first flow rate when the displacement of brine from said porous rock ceases and the pressure drop along the selected length of said porous rock is constant, thereby effecting a first residual brine saturation equilibrium within said porous rock, h) measuring electrical resistivity along said selected length of said porous rock at said first residual brine saturation equilibrium, i) repeating steps d) - h) for each of a plurality of increasing oil flow rates to effect decreasing brine saturation equilibriums.
Claim 20
Independent Claim 232 words
A method for desaturating a porous rock for electrical resistivity measurements, comprising the steps of: a) injecting a brine into a porous rock in a first direction through said porous rock, b) injecting said brine into said porous rock under back pressure in an opposite flow direction to said first flow direction to effect a brine saturation throughout said porous rock, c) measuring the electrical resistivity along a selected length of said brine-saturated porous rock, d) injecting an oil into said porous rock at a first flow rate to displace a portion of said brine from said porous rock and effect a brine saturation within said porous rock that is a minimum brine saturation with respect to said first oil flow rate, e) monitoring the displacement of brine from said porous rock, f) measuring pressure drop across a selected length of said porous rock, g) terminating the injection of oil at said first flow rate when the displacement of brine from said porous rock ceases and the pressure drop along the selected length of said porous rock is constant, thereby effecting a first residual brine saturation equilibrium within said porous rock, h) measuring electrical resistivity along said selected length of said porous rock at said first residual brine saturation equilibrium, i) repeating steps d) - h) for each of a plurality of increasing oil flow rates to effect decreasing brine saturation equilibriums.
Claim 21
Dependent Claim 28 words
The method of claim 15 further comprising the step of repeating steps b) - i) with progressively increasing viscosities for said oil to effect decreasing brine saturation equilibriums.
Claim 22
Dependent Claim 51 words
The method of claim 17 further comprising the step of repeating steps c) - g) with said first fluid being the injecting fluid in place of said second fluid and said second fluid being the displaced fluid in place of said first fluid, thereby effecting an imbibition cycle of fluid displacement.
Claim 23
Independent Claim 229 words
A method for desaturating a porous rock for electrical resistivity measurements, comprising the steps of: a) injecting a brine into a porous rock in a first direction through said porous rock, b) injecting said brine into said porous rock under back pressure in an opposite flow direction to said first flow direction to effect a brine saturation throughout said porous rock, c) measuring the electrical resistivity along a selected length of said brine-saturated porous rock, d) injecting an oil into said porous rock at a first flow rate to displace a portion of said brine from said porous rock and effect a brine saturation within said porous rock that is a minimum brine saturation with respect to said first oil flow rate, e) monitoring the displacement of brine from said porous rock, f) measuring pressure drop across a selected length of said porous rock, g) terminating the injection of oil at said first flow rate when the displacement of brine from said porous rock ceases and the pressure drop along the selected length of said porous rock is constant, thereby effecting a first residual brine saturation equilibrium within said porous rock, h) measuring electrical resistivity along said selected length of said porous rock at said first residual brine saturation equilibrium, i) repeating steps d) - h) with progressively increasing viscosities for said oil to effect decreasing brine saturation equilibriums.
Claim 24
Independent Claim 229 words
A method for desaturating a porous rock for electrical resistivity measurements, comprising the steps of: a) injecting a brine into a porous rock in a first direction through said porous rock, b) injecting said brine into said porous rock under back pressure in an opposite flow direction to said first flow direction to effect a brine saturation throughout said porous rock, c) measuring the electrical resistivity along a selected length of said brine-saturated porous rock, d) injecting an oil into said porous rock at a first flow rate to displace a portion of said brine from said porous rock and effect a brine saturation within said porous rock that is a minimum brine saturation with respect to said first oil flow rate, e) monitoring the displacement of brine from said porous rock, f) measuring pressure drop across a selected length of said porous rock, g) terminating the injection of oil at said first flow rate when the displacement of brine from said porous rock ceases and the pressure drop along the selected length of said porous rock is constant, thereby effecting a first residual brine saturation equilibrium within said porous rock, h) measuring electrical resistivity along said selected length of said porous rock at said first residual brine saturation equilibrium, i) repeating steps d) - h) with progressively increasing viscosities for said oil to effect decreasing brine saturation equilibriums.
Claim 25
Dependent Claim 31 words
The method of claim 20 further comprising the step of repeating steps b) - h) for each of a plurality of increasing oil flow rates to effect decreasing brine saturation equilibriums.
Claim 26
Dependent Claim 51 words
The method of claim 20 further comprising the step of repeating steps c) - g) with said first fluid being the injecting fluid in place of said second fluid and said second fluid being the displaced fluid in place of said first fluid, thereby effecting an imbibition cycle of fluid displacement.

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1996-05-10 1996-11-09 1997-05-11 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 2000-05-10 2000-11-09 2001-05-11 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 2004-05-10 2004-11-09 2005-05-11 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag