Patent US5339635A successfully refreshed from Google Patents.
← Back to Patent Explorer
US5180102A Expired / Lapsed US ⏱️ 0.0 years remaining

Temperature control system for zoned space

Assignee: Carrier Corp
•
Filing: 1991-08-12
•
Granted: 1993-01-19
•
Expires: 2011-08-12
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A variable air volume control system has a temperature system management device which calculates an air flow setpoint in a temperature zone as a function of a proportional term that accommodates gross temperature-setpoint errors, and integral term that provides heating or cooling load matching, and a derivative term that accommodates rapid fluctuations in the cooling or heating load, and communicates the flow setpoint to a terminal control unit to adjust the air flow to a space. The terminal control unit will implement a flow setpoint as a function of the gross error in temperature in the space and a default temperature comfort setpoint upon failure of the temperature system management device to maintain a temperature in the zone.

Inventors

  • 👤 Jeffrey S. Gilbert
  • 👤 Brett A. Desmarais

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-27 13:09
CPC Classifications
F; F24; F24F; F24F3/00; F24F3/044; F24F11/00; F24F11/70; F24F11/72; F24F11/74; F24F11/76

Claims Analysis

Total Claims: 4
Claim 1
Independent Claim 204 words
A temperature control system for controlling the flow of air into a plurality of temperature zones of a building, each temperature zone having at least one air terminal to adjustably maintain a variable volume of air into the associated temperature zone, comprising: a system management means generating a desired air flow setpoint schedule for the plurality of temperature zones, and a terminal control means for each temperature zone for receiving the generating desired air flow setpoint for varying the air through an associated air terminal to the desired air flow setpoint; wherein said desired air flow setpoint is calculated using the following formula: Flow Setpoint=G.sub.t ×(K.sub.p ×P+K.sub.i ×I+K.sub.d ×D) where: P=Temperature Setpoint-Zone Space Temperature, (for heating), or Zone Space Temeprature-Temperature Setpoint, (for cooling); ##EQU2## where R is the periodic running rate of this process; and I is sum of all I terms from I o to In n K i =0.06, in 1/° F. seconds; If I >100 (K i ×G t ), then I=100/(K i ×G t ), and If I <0, then I=O; D=(P-Previous P)/R, where R is the periodic running rate of this process; K d =1, in seconds/°F.; and G t =Temperature loop Gain Multiplier, having a range from 0.1-10.
Claim 2
Dependent Claim 204 words
A temperature control system for controlling the flow of air into a plurality of temperature zones of a building, each temperature zone having at least one air terminal to adjustably maintain a variable volume of air into the associated temperature zone, comprising: a system management means generating a desired air flow setpoint schedule for the plurality of temperature zones, and a terminal control means for each temperature zone for receiving the generating desired air flow setpoint for varying the air through an associated air terminal to the desired air flow setpoint; wherein said desired air flow setpoint is calculated using the following formula: Flow Setpoint=G.sub.t ×(K.sub.p ×P+K.sub.i ×I+K.sub.d ×D) where: P=Temperature Setpoint-Zone Space Temperature, (for heating), or Zone Space Temeprature-Temperature Setpoint, (for cooling); ##EQU2## where R is the periodic running rate of this process; and I is sum of all I terms from I o to In n K i =0.06, in 1/° F. seconds; If I >100 (K i ×G t ), then I=100/(K i ×G t ), and If I <0, then I=O; D=(P-Previous P)/R, where R is the periodic running rate of this process; K d =1, in seconds/°F.; and G t =Temperature loop Gain Multiplier, having a range from 0.1-10.
Claim 3
Dependent Claim 52 words
A temperature control system as setforth in claim 1 wherein if said terminal control means fails to receive said generated air flow setpoint after a predetermined period then said terminal control means will generate a default flow setpoint to vary the air through an associated air terminal to the default flow setpoint.
Claim 4
Dependent Claim 44 words
A temperature control system as setforth in claim 2 wherein said default flow setpoint is calculated using the following formula: Default setpoint=K.sub.p ×P, where P=desired temperature-Zone Space Temperature (for heating), or Zone Space Temperature-desired temperature (for cooling), and K p =8, in 1/° F.

References Cited (Backward Citations)

US4997029A Cited
US4732318A Cited
US4811897A Cited
US4997030A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1996-01-19 1996-07-20 1997-01-19 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 2000-01-19 2000-07-20 2001-01-19 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 2004-01-19 2004-07-20 2005-01-19 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag