Claims Analysis
Total Claims: 12
Claim 1
Independent Claim
408 words
A field measuring instrument disposed in a field location in an industrial plant and connected to a communication device at a central location in the industrial plant via a communication line, wherein the field measuring instrument transmits data to the communication device via the communication line, and wherein the communication device modifies an operational parameter of the field measuring instrument via the communication line, the field measuring instrument comprising: a sensor for measuring a parameter to be measured and for outputting a detection signal representing the measured parameter; a processing unit for receiving the detection signal from the sensor and processing the received detection signal, and for executing a self-diagnosis program for detecting an abnormality in the field measuring instrument, the processing unit outputting an abnormality flag when an abnormality is detected; a counter for counting a predetermined interval of time and for outputting an interruption signal to the processing unit each time the predetermined interval of time is counted; a work memory connected to the processing unit for temporarily storing a total number of interruption signals output by the counter; and an EEPROM connected to the processing unit for permanently storing the total number of interruption signals output by the counter, and the abnormality flag output by the processing unit together with the total number of interruption signals output by the counter at the time the abnormality is detected by the processing unit, the EEPROM being initialized by the processing unit before being used for the first time; wherein the processing unit sets the total number of interruption signals stored in the work memory and the total number of interruption signals stored in the EEPROM to zero when power is applied to the field measuring instrument and the EEPROM has not yet been initialized, and copies the total number of interruption signals stored in the EEPROM into the work memory when power is applied to the field measuring instrument and the EEPROM has already been initialized; wherein the processing unit increments the total number of interruption signals stored in the work memory and stores the incremented total number of interruption signals in the EEPROM each time the counter outputs an interruption signal to the processing unit; and wherein the processing unit stores the abnormality flag output by the processing unit in the EEPROM together with the total number of interruption signals stored in the work memory at the time the abnormality is detected by the processing unit.
Claim 2
Dependent Claim
408 words
A field measuring instrument disposed in a field location in an industrial plant and connected to a communication device at a central location in the industrial plant via a communication line, wherein the field measuring instrument transmits data to the communication device via the communication line, and wherein the communication device modifies an operational parameter of the field measuring instrument via the communication line, the field measuring instrument comprising: a sensor for measuring a parameter to be measured and for outputting a detection signal representing the measured parameter; a processing unit for receiving the detection signal from the sensor and processing the received detection signal, and for executing a self-diagnosis program for detecting an abnormality in the field measuring instrument, the processing unit outputting an abnormality flag when an abnormality is detected; a counter for counting a predetermined interval of time and for outputting an interruption signal to the processing unit each time the predetermined interval of time is counted; a work memory connected to the processing unit for temporarily storing a total number of interruption signals output by the counter; and an EEPROM connected to the processing unit for permanently storing the total number of interruption signals output by the counter, and the abnormality flag output by the processing unit together with the total number of interruption signals output by the counter at the time the abnormality is detected by the processing unit, the EEPROM being initialized by the processing unit before being used for the first time; wherein the processing unit sets the total number of interruption signals stored in the work memory and the total number of interruption signals stored in the EEPROM to zero when power is applied to the field measuring instrument and the EEPROM has not yet been initialized, and copies the total number of interruption signals stored in the EEPROM into the work memory when power is applied to the field measuring instrument and the EEPROM has already been initialized; wherein the processing unit increments the total number of interruption signals stored in the work memory and stores the incremented total number of interruption signals in the EEPROM each time the counter outputs an interruption signal to the processing unit; and wherein the processing unit stores the abnormality flag output by the processing unit in the EEPROM together with the total number of interruption signals stored in the work memory at the time the abnormality is detected by the processing unit.
Claim 3
Dependent Claim
48 words
A field measuring instrument according to claim 1, wherein the field measuring instrument is one of a differential pressure/pressure transmitter, an electromagnetic flow meter, and a temperature transmitter, and the operational parameter is one of a measuring range and a damping time constant of the field measuring instrument.
Claim 4
Dependent Claim
73 words
A field measuring instrument according to claim 1, wherein the EEPROM includes a total operating time management area in which the total number of interruption signals output by the counter is stored, and a self-diagnosis management area in which the abnormality flag output by the processing unit is stored together with the total number of interruption signals stored in the work memory at the time the abnormality is detected by the processing unit.
Claim 5
Dependent Claim
202 words
A field measuring instrument according to claim 3, wherein the work memory includes a time recording area for storing a total operating time, the total operating time being incremented by the processing unit each time the counter outputs an interruption signal to the processing unit, and being reset to zero by the processing unit when the total operating time stored in the time recording area becomes equal to a predetermined value, and wherein the work memory further includes a page recording area for storing a page number indicating a number of times the total operating time has been reset to zero by the processing unit; and wherein the total operating time management area of the EEPROM includes a page management area and a plurality of pages, and wherein the processing unit copies the page number stored in the page recording area of the work memory into the page management area of the EEPROM, and copies the total operating time stored in the time recording area of the work memory into one of the plurality of pages corresponding to the page number stored in the page management area of the EEPROM, each time the counter outputs an interruption signal to the processing unit.
Claim 6
Dependent Claim
104 words
A field measuring instrument according to claim 4, wherein the self-fiagnosis management area in the EEPROM includes a plurality of data sets each including a flag storing area, a page storing area, and a time storing area; and wherein the processing unit stores the abnormality flag, the page number stored in the page recording area of the work memory, and the total operating time stored in the time recording area of the work memory in the flag storing area, the page storing area, and the time storing area, respectively, of a corresponding one of the plurality of data sets of the self-diagnosis management area.
Claim 7
Dependent Claim
87 words
A field measuring instrument according to claim 5, wherein the communication device transmits an abnormality output request signal to the field measuring instrument via the communication line, and wherein the field measuring instrument reads out the contents of the flag storing area, the page storing area, and the time storing area of each of the plurality of data sets of the self-diagnosis management area of the EEPROM in response to the abnormality output request and transmits the read-out contents to the communication device via the communication line.
Claim 8
Dependent Claim
188 words
An abnormality managing method for a field measuring instrument disposed in a field location in an industrial plant and connected to a communication device at a central location in the industrial plant via a communication line, wherein the field measuring instrument transmits data to the communication device via the communication line, and wherein the communication device modifies an operational parameter of the field measuring instrument via the communication line, the field measuring instrument including a work memory for temporarily storing data, and an EEPROM for permanently storing data, the abnormality managing method comprising the steps of: periodically producing an interruption signal at a predetermined interval of time; incrementing a total number of interruption signals stored in the work memory and storing the incremented total number of interruption signals in the EEPROM each time an interruption signal is produced; executing a self-diagnosis program for detecting an abnormality in the field measuring instrument and outputting an abnormality flag when an abnormality is detected; storing the abnormality flag in the EEPROM together with the total number of interruption signals stored in the work memory at the time the abnormality is detected.
Claim 9
Dependent Claim
188 words
An abnormality managing method for a field measuring instrument disposed in a field location in an industrial plant and connected to a communication device at a central location in the industrial plant via a communication line, wherein the field measuring instrument transmits data to the communication device via the communication line, and wherein the communication device modifies an operational parameter of the field measuring instrument via the communication line, the field measuring instrument including a work memory for temporarily storing data, and an EEPROM for permanently storing data, the abnormality managing method comprising the steps of: periodically producing an interruption signal at a predetermined interval of time; incrementing a total number of interruption signals stored in the work memory and storing the incremented total number of interruption signals in the EEPROM each time an interruption signal is produced; executing a self-diagnosis program for detecting an abnormality in the field measuring instrument and outputting an abnormality flag when an abnormality is detected; storing the abnormality flag in the EEPROM together with the total number of interruption signals stored in the work memory at the time the abnormality is detected.
Claim 10
Dependent Claim
172 words
An abnormality managing method according to claim 7, wherein the work memory includes a time recording area for storing a total operating time, the total operating time being incremented each time an interruption signal is produced, and being reset to zero when the total operating time stored in the time recording area becomes equal to a predetermined value, and wherein the work memory further includes a page recording area for storing a page number indicating a number of times the total operating time has been reset to zero; and wherein the EEPROM includes a page management area and a plurality of pages, and wherein the page number stored in the page recording area of the work memory is copied into the page management area of the EEPROM, and the total operating time stored in the time recording area of the work memory is copied into one of the plurality of pages corresponding to the page number stored in the page management area of the EEPROM, each time an interruption signal is produced.
Claim 11
Dependent Claim
33 words
An abnormality managing method according to claim 7, wherein the predetermined interval of time at which the interruption signal is periodically produced is longer than a period necessary for executing the self-diagnosis program.
Claim 12
Dependent Claim
48 words
An abnormality managing method according to claim 7, wherein the field measuring instrument is one of a differential pressure/pressure transmitter, an electromagnetic flow meter, and a temperature transmitter, and the operational parameter is one of a measuring range and a damping time constant of the field measuring instrument.