US5098011A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Method and tooling for fabricating monolithic metal or metal matrix composite structures
Assignee: McDonnell Douglas Corp
•
Filing: 1990-12-14
•
Granted: 1992-03-24
•
Expires: 2010-12-14
Abstract
Abstract The tool and the process for forming structural shapes from multiple elements of either a monolithic or metal matrix composition by either diffusion bonding or brazing the metal or metal composites under temperature and pressure. The pressure is applied by expanding superplastic metal bladders, the specimen is contained in a superplastic metal vacuum bag, and all are contained in a steel die cavity.
Inventors
- 👤 Max R. Runyan
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-08 13:33
CPC Classifications
B; B21; B21D; B21D26/00; B21D26/02; B21D26/053; B21D26/055; B21D47/00; B21D47/01; B23; B23K; B23K20/00; B23K20/18; Y; Y10; Y10T; Y10T29/00; Y10T29/49; Y10T29/49616; Y10T29/49623; Y10T29/49634
Claims Analysis
Total Claims: 7
Claim 1
Independent Claim
266 words
A method of forming a structural member by bonding at least two metal bondable elements in a containment fixture and wherein bonding pressure for at least one set of surfaces to be bonded is supplied by at least one metal bladder, comprising: orienting said at least two elements so as to form said structural member inside said containment fixture; supporting all surfaces of said at least two elements not acted upon by said at least one metal bladder when in the expanded position by positioning spacers conforming to the shape of said at least two elements between said at least two elements and said containment fixture so as to positively support with an essentially net tolerance said at least two elements; supporting at least one of said surfaces of said structural member contacting said at least one metal bladder when in the expanded positions by at least one shaped spacer, shaped so that said expanded metal bladder may envelope said shaped spacer and apply force against said surface to be bonded to form said structural member; applying stop-off to all diffusion bondable surfaces not intended to be bonded; installing said at least one superplastic metal bladder between said shaped spacer and said containment fixture; providing means to pressurize said at least one metal bladder which extends outside of said containment fixture; heating said containment fixture, said spacers, said at least two elements and said at least one metal bladder; and pressurizing said at least one metal bladder so as to expand said bladder, enveloping said shaped spacer, and applying force against said surfaces to be bonded.
Claim 2
Independent Claim
266 words
A method of forming a structural member by bonding at least two metal bondable elements in a containment fixture and wherein bonding pressure for at least one set of surfaces to be bonded is supplied by at least one metal bladder, comprising: orienting said at least two elements so as to form said structural member inside said containment fixture; supporting all surfaces of said at least two elements not acted upon by said at least one metal bladder when in the expanded position by positioning spacers conforming to the shape of said at least two elements between said at least two elements and said containment fixture so as to positively support with an essentially net tolerance said at least two elements; supporting at least one of said surfaces of said structural member contacting said at least one metal bladder when in the expanded positions by at least one shaped spacer, shaped so that said expanded metal bladder may envelope said shaped spacer and apply force against said surface to be bonded to form said structural member; applying stop-off to all diffusion bondable surfaces not intended to be bonded; installing said at least one superplastic metal bladder between said shaped spacer and said containment fixture; providing means to pressurize said at least one metal bladder which extends outside of said containment fixture; heating said containment fixture, said spacers, said at least two elements and said at least one metal bladder; and pressurizing said at least one metal bladder so as to expand said bladder, enveloping said shaped spacer, and applying force against said surfaces to be bonded.
Claim 3
Dependent Claim
29 words
The method of claim 1, further comprising the step of inserting brazing foil between all of said surfaces of said elements to be bonded to form said structural member.
Claim 4
Dependent Claim
53 words
The method of claim 1, wherein the step of installing said at least one metal bladder between said shaped spacer and said containment fixture includes arranging said bladder so any welds in said bladder are contained between said spacers so that said welds are not contained in the expanded portion of said bladder.
Claim 5
Dependent Claim
27 words
The method of claim 1, further comprising the step of inserting at least one second metal bladder between said shaped spacer and said surface to be bonded.
Claim 6
Dependent Claim
43 words
The method of claim 1, wherein said at least one metal bladder is two metal bladders arranged so as to engage opposite sides of said surfaces of said elements to be bonded to form said structural member and thereby enveloping said shaped spacers.
Claim 7
Dependent Claim
76 words
The method of claim 4, wherein said at least one metal bladder is two metal bladders arranged so as to engage opposite sides of said surfaces of said elements to be bonded to form said structural member and thereby enveloping said shaped spacers and wherein said at least one second metal bladder is two metal bladders inserted between said shaped spacer and said surfaces to be bonded on opposing sides of said surfaces to be bonded.
References Cited (Backward Citations)
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1995-03-24 | 1995-09-23 | 1996-03-24 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1999-03-24 | 1999-09-23 | 2000-03-24 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 2003-03-24 | 2003-09-23 | 2004-03-24 | $7700.00 | Window Closed / Lapsed |