Claims Analysis
Total Claims: 27
Claim 1
Independent Claim
180 words
A method for testing subsurface formations from a bore hole containing compressed drilling fluid, which method comprises: (a) positioning a drill stem down hole test tool down a bore hole adjacent to the formation to be tested, said test tool containing: (i) an entry port, (ii) a chamber of known volume, (iii) a means for controlling the flow rate of the drilling fluid into the test tool, and (iv) a pressure measuring means; (b) utilizing at least one packer to isolate an 11 interval of bore hole by expanding the packer and sealing the 12 annular space between the test tool and the bore hole; (c) effectively controlling the flow rate of drilling fluid into the chamber of the test tool so that substantial instantaneous decompression of the drilling fluid does not occur; and (d) measuring and plotting pressure as a function of time from the time the seal is made between the test tool and the wall of the bore hole until at least the time at which the chamber of the test tool is filled with drilling fluid.
Claim 2
Independent Claim
180 words
A method for testing subsurface formations from a bore hole containing compressed drilling fluid, which method comprises: (a) positioning a drill stem down hole test tool down a bore hole adjacent to the formation to be tested, said test tool containing: (i) an entry port, (ii) a chamber of known volume, (iii) a means for controlling the flow rate of the drilling fluid into the test tool, and (iv) a pressure measuring means; (b) utilizing at least one packer to isolate an 11 interval of bore hole by expanding the packer and sealing the 12 annular space between the test tool and the bore hole; (c) effectively controlling the flow rate of drilling fluid into the chamber of the test tool so that substantial instantaneous decompression of the drilling fluid does not occur; and (d) measuring and plotting pressure as a function of time from the time the seal is made between the test tool and the wall of the bore hole until at least the time at which the chamber of the test tool is filled with drilling fluid.
Claim 3
Dependent Claim
11 words
The method of claim 1 wherein the drilling fluid is mud.
Claim 4
Dependent Claim
40 words
The method of claim 2 wherein the flow rate of the fluid entering the test tool is from about 0.4 in 3 /min to about 40 in 3 /min for a volume of mud of about 13,000 in 3 .
Claim 5
Dependent Claim
22 words
The method of claim 3 wherein the flow rate is from about 0.8 in 3 /min to about 8 in 3 /min.
Claim 6
Dependent Claim
17 words
The method of claim 1 wherein the permeability of the formation is less than about 10 millidarcies.
Claim 7
Dependent Claim
16 words
The method of claim 5 wherein the permeability of the formation is less than 5 millidarcies.
Claim 8
Dependent Claim
18 words
The method of claim 6 wherein the permeability of the formation is from about 0.1 to 1 millidarcies.
Claim 9
Dependent Claim
57 words
The method of claim 1 wherein the plot of pressure versus time is analyzed to determine one or more of the following formation characteristics: (a) the flow rate of liquid phase mud passing through the mud cake; (b) the permeability of the formation; (c) the formation pressure; (d) the invasion diameter; and (e) the extent of supercharging.
Claim 10
Dependent Claim
38 words
The method of claim 8 wherein the permeability of the formation is determined by comparing the section of pressure versus time plot, starting with the sand face pressure, to a set of theoretical curve generated for various permeabilities.
Claim 11
Dependent Claim
32 words
The method of claim 1 wherein multiple tests and plots are made at the same location, or at different locations, in the bore hole, before raising the test tool to the surface.
Claim 12
Dependent Claim
29 words
The method of claim 10 wherein the bore hole is cased and the pressure versus time curve is used to determine permeability of the formation and the formation pressure.
Claim 13
Independent Claim
220 words
A method for testing subsurface formations from a bore hole containing compressed mud, wherein said formations have a permeability in the range of about 0.01 to 5 millidarcies, which method comprises: (a) positioning a drill stem down hole test tool down a bore hole adjacent to the formation to be tested, said test tool which is capable of making multiple tests before being raised to the surface, which tool contains: (i) an entry port, (ii) a chamber of known volume, (iii) a means for controlling the flow rate of the mud into the test tool in the range of about 0.4 in 3 /min to about 40 in 3 /min, and (iv) a pressure measuring means; (b) utilizing at least one packer to isolate an interval of bore hole by expanding the packer and sealing the annular space between the test tool and the bore hole; (c) effectively controlling the flow rate of mud into the chamber of the test tool so that substantial instantaneous decompression of the drilling fluid does not occur; and (d) measuring and plotting the pressure as a function of time from the time the seal is made between the test tool and the wall of the bore hole until at least the time at which the chamber of the test tool is filled with mud.
Claim 14
Independent Claim
220 words
A method for testing subsurface formations from a bore hole containing compressed mud, wherein said formations have a permeability in the range of about 0.01 to 5 millidarcies, which method comprises: (a) positioning a drill stem down hole test tool down a bore hole adjacent to the formation to be tested, said test tool which is capable of making multiple tests before being raised to the surface, which tool contains: (i) an entry port, (ii) a chamber of known volume, (iii) a means for controlling the flow rate of the mud into the test tool in the range of about 0.4 in 3 /min to about 40 in 3 /min, and (iv) a pressure measuring means; (b) utilizing at least one packer to isolate an interval of bore hole by expanding the packer and sealing the annular space between the test tool and the bore hole; (c) effectively controlling the flow rate of mud into the chamber of the test tool so that substantial instantaneous decompression of the drilling fluid does not occur; and (d) measuring and plotting the pressure as a function of time from the time the seal is made between the test tool and the wall of the bore hole until at least the time at which the chamber of the test tool is filled with mud.
Claim 15
Dependent Claim
38 words
The method of claim 12 wherein the flow rate of mud into the tool is from about 0.8 in 3 /min to about 8 in 3 /min for a volume of mud of about 13,000 in 3 .
Claim 16
Dependent Claim
62 words
The method of claim 12 wherein the plot of pressure versus time is analyzed to determine one or more of the following formation characteristics: (a) the flow rate of liquid phase mud through the mud cake if the bore hole is not cased; (b) the permeability of the formation; (c) the formation pressure; (d) the invasion diameter; (e) the extent of supercharging.
Claim 17
Dependent Claim
38 words
The method of claim 12 wherein the permeability of the formation is determined by comparing the section of pressure versus time plot, starting with the sand face pressure, to a set of theoretical curves generated for various permeabilities.
Claim 18
Dependent Claim
34 words
The method of claim 12 wherein the plot of pressure versus time is from a cased bore hole and used to determine one or both of the permeability of the formation and the formation
Claim 19
Dependent Claim
73 words
A drill stem down hole test tool for testing subsurface formations, which test tool comprises: (a) an elongated housing; (b) at least one packer; (c) at least one entry port for receiving drilling fluid into the test tool; (d) at least one chamber of known volume; (e) a means for effectively controlling the flow rate of drilling fluid into the test tool; (f) a pressure sensing means in communication with a recording means.
Claim 20
Dependent Claim
73 words
A drill stem down hole test tool for testing subsurface formations, which test tool comprises: (a) an elongated housing; (b) at least one packer; (c) at least one entry port for receiving drilling fluid into the test tool; (d) at least one chamber of known volume; (e) a means for effectively controlling the flow rate of drilling fluid into the test tool; (f) a pressure sensing means in communication with a recording means.
Claim 21
Dependent Claim
77 words
The test tool of claim 17 which contains an upper chamber and a lower chamber, which lower chamber is filled with hydraulic fluid and said chambers being in communication with one another by way of a choke for controlling the flow rate of hydraulic fluid into the upper chamber, wherein said lower chamber also contains a floating piston for forcing the hydraulic fluid through said choke and into said upper chamber by pressure exerted by the mud.
Claim 22
Dependent Claim
34 words
The test tool of claim 18 which also contains means for unseating the packer, expelling the fluid, reseating the packer, and obtaining another set of measurements, without having to be raised to the surface.
Claim 23
Dependent Claim
29 words
The test tool of claim 19 which also contains an interval space in the tool for receiving a sample of fluid, through an entry port, from the bore hole.
Claim 24
Dependent Claim
17 words
The test tool of claim 17 which contains two packers for isolating an interval of bore hole.
Claim 25
Dependent Claim
17 words
The test tool of claim 19 which contains two packers for isolating a interval of bore hole.
Claim 26
Dependent Claim
15 words
The test tool of claim 12 wherein the recording means is in the test tool.
Claim 27
Dependent Claim
15 words
The test tool of claim 21 wherein the recording means is in the test tool.