Claims Analysis
Total Claims: 4
Claim 1
Independent Claim
171 words
A method of renovating a control system for controlling control clusters in a reactor provided with such clusters operated by electromagnetic mechanisms (1) having coils powered by power bridges (31, 32, 33) from a control desk (11) via said control system, said control system including a controlling hard-wired logic circuit (12) serving said desk and monitoring a plurality of hard-wired logic interfaces (15) each serving at least one subgroup (10) constituted by the electromagnetic operating mechanisms (1) of a determined number of simultaneously operable clusters, said method comprising successively and independently replacing each static power assembly (9) constituted by a hard-wired logic interface (15) and the power bridges (31, 32, 33) of at least one subgroup served thereby by at least one electronic control assembly (23) constituted by a computer and the power bridges (31', 32', 33') of a subgroup served thereby, said computer being interconnected via peripheral circuits (28, 29, 30, 35) with the power bridges and the controlling hard-wired logic in a manner which simulates a hard-wired logic interface.
Claim 2
Independent Claim
171 words
A method of renovating a control system for controlling control clusters in a reactor provided with such clusters operated by electromagnetic mechanisms (1) having coils powered by power bridges (31, 32, 33) from a control desk (11) via said control system, said control system including a controlling hard-wired logic circuit (12) serving said desk and monitoring a plurality of hard-wired logic interfaces (15) each serving at least one subgroup (10) constituted by the electromagnetic operating mechanisms (1) of a determined number of simultaneously operable clusters, said method comprising successively and independently replacing each static power assembly (9) constituted by a hard-wired logic interface (15) and the power bridges (31, 32, 33) of at least one subgroup served thereby by at least one electronic control assembly (23) constituted by a computer and the power bridges (31', 32', 33') of a subgroup served thereby, said computer being interconnected via peripheral circuits (28, 29, 30, 35) with the power bridges and the controlling hard-wired logic in a manner which simulates a hard-wired logic interface.
Claim 3
Dependent Claim
185 words
A control system for controlling control clusters in a reactor provided with such clusters operated by means of electromagnetic mechanisms (1) whose coils are powered by power bridges (31, 32, 33) from a control desk (11) via a controlling hard-wired logic circuit (12) serving the desk and supervising a plurality of hard-wired logic interfaces (15) each of which serves at least one subgroup (10) constituted by a determined number of simultaneously operable clusters, said control system comprising, in parallel, (a) static power assemblies (9) each constituted by a hard-wired logic interface (15) and the power bridges (31, 32, 33) served thereby; and (b) electronic control assemblies (23) each constituted by a computer and the power bridges (31', 32', 33') of a subgroup (1), the computer of each electronic control assembly being interconnected like a hard-wired logic interface via peripheral circuits (28, 29, 30, 35), firstly to the power bridges, and secondly to the controlling hard-wired logic circuit, thereby enabling the reactor to operate normally while its control system is being renovated between shut-down periods during which static power assemblies are replaced by electronic control assemblies.
Claim 4
Dependent Claim
185 words
A control system for controlling control clusters in a reactor provided with such clusters operated by means of electromagnetic mechanisms (1) whose coils are powered by power bridges (31, 32, 33) from a control desk (11) via a controlling hard-wired logic circuit (12) serving the desk and supervising a plurality of hard-wired logic interfaces (15) each of which serves at least one subgroup (10) constituted by a determined number of simultaneously operable clusters, said control system comprising, in parallel, (a) static power assemblies (9) each constituted by a hard-wired logic interface (15) and the power bridges (31, 32, 33) served thereby; and (b) electronic control assemblies (23) each constituted by a computer and the power bridges (31', 32', 33') of a subgroup (1), the computer of each electronic control assembly being interconnected like a hard-wired logic interface via peripheral circuits (28, 29, 30, 35), firstly to the power bridges, and secondly to the controlling hard-wired logic circuit, thereby enabling the reactor to operate normally while its control system is being renovated between shut-down periods during which static power assemblies are replaced by electronic control assemblies.