US5051232A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Powdered metal multiple piece component manufacturing
Assignee: BorgWarner Inc
•
Filing: 1990-01-16
•
Granted: 1991-09-24
•
Expires: 2010-01-16
Abstract
Abstract The separation of two or more forged powder metal components is facilitated by forming a compacted and sintered powder metal preform with at least one slit that separates the component pieces. An anti-bonding agent such as graphite is introduced into the slit and the preform is then forged to final shape. The anti-bonding agent prevents the complete bonding of the powder metal pieces to each other thereby facilitating separation of the pieces at the slit. This method is particularly suited for the manufacture of piston connecting rod assemblies of the type including a connecting rod and cap.
Inventors
- 👤 Hayward P. Summers
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-09 09:09
CPC Classifications
F; F16; F16C; F16C9/00; F16C9/04; F16C9/045; B; B22; B22F; B22F5/00; B22F5/003; B22F2998/00
Claims Analysis
Total Claims: 22
Claim 1
Independent Claim
93 words
A process for manufacturing a multiple piece powdered metal component, comprising: forming a compacted and sintered powdered metal preform of the component with at least one predetermined slit that separates the pieces of the component along a predetermined nonfractured interface; introducing an antibonding agent into the slit; and forging the preform to the final shape of the component as the antibonding agent prevents complete bonding of the powdered metal pieces to each other to permit separation of the pieces from each other without fracturing the powdered metal pieces except at the predetermined slit.
Claim 2
Dependent Claim
93 words
A process for manufacturing a multiple piece powdered metal component, comprising: forming a compacted and sintered powdered metal preform of the component with at least one predetermined slit that separates the pieces of the component along a predetermined nonfractured interface; introducing an antibonding agent into the slit; and forging the preform to the final shape of the component as the antibonding agent prevents complete bonding of the powdered metal pieces to each other to permit separation of the pieces from each other without fracturing the powdered metal pieces except at the predetermined slit.
Claim 3
Dependent Claim
37 words
A process as in claim 1 wherein the slit is formed to separate the pieces while leaving a limited amount of virgin powdered metal that connects the pieces to facilitate handling of the component after the forging.
Claim 4
Dependent Claim
22 words
A process as in claim 2 wherein the virgin powdered metal is subsequently machined away to separate the pieces from each other.
Claim 5
Dependent Claim
37 words
A process as in claim 2 wherein at least one of the pieces is machined at a location remote from the slit and the virgin powdered metal thereafter being removed to separate the pieces from each other.
Claim 6
Dependent Claim
15 words
A process as in claim 1 wherein the slit is formed with a planar shape.
Claim 7
Dependent Claim
15 words
A process as in claim 1 wherein the slit is formed with a nonplanar shape.
Claim 8
Dependent Claim
16 words
A process as in claim 1 wherein the slit completely separates the pieces of the component.
Claim 9
Dependent Claim
31 words
A process as in claim 1 wherein the pieces are separated from each other at the slit which provides matched surfaces that are subsequently utilized interfit the pieces with each other.
Claim 10
Dependent Claim
33 words
A process as in claim 1 wherein the pieces are separated from each other at the slit which provides surfaces that are subsequently machined to provide engagement of the pieces with each other.
Claim 11
Dependent Claim
121 words
A process for manufacturing a two-piece piston connecting rod assembly including a connecting rod having a piston connecting end and also including a cap that cooperates with the rod to define a crankshaft connecting end, the process comprising: forming a compacted and sintered powdered metal preform of the rod assembly with a pair of slits that at least partially separates the rod and cap along a pair of predetermined nonfractured interfaces; introducing an antibonding agent into the slits; and forging the preform to the final shape of the rod assembly as the antibonding agent prevents bonding of the rod and cap to each other to permit separation of the pieces from each other without fracturing the pieces except at the slits.
Claim 12
Dependent Claim
121 words
A process for manufacturing a two-piece piston connecting rod assembly including a connecting rod having a piston connecting end and also including a cap that cooperates with the rod to define a crankshaft connecting end, the process comprising: forming a compacted and sintered powdered metal preform of the rod assembly with a pair of slits that at least partially separates the rod and cap along a pair of predetermined nonfractured interfaces; introducing an antibonding agent into the slits; and forging the preform to the final shape of the rod assembly as the antibonding agent prevents bonding of the rod and cap to each other to permit separation of the pieces from each other without fracturing the pieces except at the slits.
Claim 13
Dependent Claim
53 words
A process as in claim 10 wherein the slits are formed to extend inwardly toward each other between the rod and cap and have inner ends that terminate short of completely separating the rod and cap so as to leave a limited amount of virgin powdered metal that connects the rod and cap.
Claim 14
Dependent Claim
46 words
A process as in claim 11 wherein the rod and cap are machined to provide connection holes for providing connection to each other, and the rod and cap thereafter being machined to remove the virgin powdered metal and separate the rod and cap from each other.
Claim 15
Dependent Claim
22 words
A process as in claim 12 wherein the machining that removes the virgin powdered metal material also provides a crankshaft bearing surface.
Claim 16
Dependent Claim
48 words
A process as in claim 13 wherein the preform of the rod assembly is formed with a rough crankshaft bearing opening of a round shape in which a pair of lugs of the virgin powdered metal project inwardly at diametrically opposite locations respectively adjacent the pair of slits.
Claim 17
Dependent Claim
43 words
A process as in claim 13 wherein the preform of the rod assembly is formed with a rough crankshaft opening of a round shape from which the pair of slits are separated by the virgin powdered metal that connects the rod and cap.
Claim 18
Dependent Claim
47 words
A process as in claim 13 wherein the preform of the rod assembly is formed with a rough crankshaft bearing opening of a round shape and the pair of slits being formed with planar shapes located diametrically opposite each other with respect to the crankshaft bearing opening.
Claim 19
Dependent Claim
47 words
A process as in claim 13 wherein the preform of the rod assembly is formed with a rough crankshaft bearing opening of a round shape and the pair of slits being formed with nonplanar shapes located diametrically opposite each other with respect to the crankshaft bearing opening.
Claim 20
Dependent Claim
20 words
A process as in claim 10 wherein the pair of slits completely separate the rod and cap from each other.
Claim 21
Dependent Claim
38 words
A process as in claim 10 wherein the rod and cap are separated from each other at the pair of slits which provide matched surfaces that are subsequently utilized to interfit the rod and cap with each other.
Claim 22
Dependent Claim
39 words
A process as in claim 10 wherein the rod and cap are separated from each other at the pair of slits which provide surfaces that are subsequently machined to provide engagement of the rod and cap with each other.
References Cited (Backward Citations)
GB367462A
Cited
JPS55154505A
Cited
JPS58141301A
Cited
EP0167320A2
Cited
US4569109A
Cited
US4693139A
Cited
EP0304162B1
Cited
US4923674A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1994-09-23 | 1995-03-25 | 1995-09-24 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1998-09-23 | 1999-03-25 | 1999-09-24 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 2002-09-23 | 2003-03-25 | 2003-09-24 | $7700.00 | Window Closed / Lapsed |