← Back to Patent Explorer
US5040414A Expired / Lapsed US ⏱️ 0.0 years remaining

Analyzing a hydrocarbon reservoir by determining the response of that reservoir to tidal forces

Assignee: Chevron USA Inc
•
Filing: 1989-06-29
•
Granted: 1991-08-20
•
Expires: 2009-06-29
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A method is disclosed for determining a component of the response of a reservoir to tidal forces (such as the amplitude of variation or delay time) in a hydrocarbons reservoir. That method comprises measuring a variable responsive to tidal forces within the reservoir over a measurement time period, determining a theoretical earth-tide for the reservoir over that measurement time period, and determining the component of the response to tidal forces by comparing the variable measurements and the theoretical earth-tide determinations. Examples of variables that are responsive to the tidal forces are fluid level in a borehole, pressure, and borehole stress. The measurement time period should be sufficiently long so that both a maximum and minimum variable measurement is achieved during that time period (e.g., fourteen or twenty-four hours).

Inventors

  • 👤 Peter Graebner

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-01 07:23
CPC Classifications
G; G01; G01V; G01V7/00; E; E21; E21B; E21B49/00

Claims Analysis

Total Claims: 45
Claim 1
Independent Claim 67 words
A method for determining a component of the response of a hydrocarbons reservoir to tidal forces comprising: (a) measuring a variable responsive to tidal forces within said reservoir over a measurement time period; (b) determining a theoretical earth-tide for said reservoir over said measurement time period; and (c) determining said component of the response to tidal forces by comparing said variable measurements and said theoretical earth-tide determinations.
Claim 2
Independent Claim 67 words
A method for determining a component of the response of a hydrocarbons reservoir to tidal forces comprising: (a) measuring a variable responsive to tidal forces within said reservoir over a measurement time period; (b) determining a theoretical earth-tide for said reservoir over said measurement time period; and (c) determining said component of the response to tidal forces by comparing said variable measurements and said theoretical earth-tide determinations.
Claim 3
Dependent Claim 33 words
A method for determining a component of the response of a hydrocarbons reservoir to tidal forces according to claim 1 wherein said variable responsive to tidal forces is fluid level within a borehole.
Claim 4
Dependent Claim 29 words
A method for determining a component of the response of a hydrocarbons reservoir to tidal forces according to claim 1 wherein said variable responsive to tidal forces is pressure.
Claim 5
Dependent Claim 34 words
A method for determining a component of the response of a hydrocarbons reservoir to tidal forces according to claim 3 wherein said pressure comprises a pressure measured within the liquid phase of said reservoir.
Claim 6
Dependent Claim 36 words
A method for determining a component of the response of a hydrocarbons reservoir to tidal forces according to claim 4 wherein said pressure further comprises a pressure measured outside of the liquid phase of said reservoir.
Claim 7
Dependent Claim 30 words
A method for determining a component of the response of a hydrocarbons reservoir to tidal forces according to claim 1 wherein said variable responsive to tidal forces is borehole stress.
Claim 8
Dependent Claim 43 words
A method for determining a component of the response of a hydrocarbons reservoir to tidal forces according to claim 1 wherein said measurement time period is sufficiently long so that both a maximum and minimum variable measurement is achieved during that time period.
Claim 9
Dependent Claim 31 words
A method for determining a component of the response of a hydrocarbons reservoir to tidal forces according to claim 7 wherein said measurement time period is at least fourteen hours long.
Claim 10
Dependent Claim 31 words
A method for determining a component of the response of a hydrocarbons reservoir to tidal forces according to claim 8 wherein said measurement time period is at least twenty-four hours long.
Claim 11
Dependent Claim 35 words
A method for determining a component of the response of a hydrocarbons reservoir to tidal forces according to claim 1 wherein said variable responsive to tidal forces is measured continuously throughout said measurement time period.
Claim 12
Dependent Claim 39 words
A method for determining a component of the response of a hydrocarbons reservoir to tidal forces according to claim 1 wherein said variable responsive to tidal forces is measured at least every fifteen minutes throughout said measurement time period.
Claim 13
Dependent Claim 37 words
A method for determining a component of the response of a hydrocarbons reservoir to tidal forces according to claim 1 wherein said component of the response to tidal forces comprises the amplitude of variation of said response.
Claim 14
Dependent Claim 36 words
A method for determining a component of the response of a hydrocarbons reservoir to tidal forces according to claim 1 wherein said component of the response to tidal forces comprises the delay time of said response.
Claim 15
Dependent Claim 70 words
A method for determining a component of the response of a hydrocarbons reservoir to tidal forces according to claim 1 wherein said component of the response to tidal forces is the combination of the amplitude of variation of said response and the delay time of said response; and wherein said component of the response to tidal forces is factored out from said variable measurements to reveal a residual time serials.
Claim 16
Dependent Claim 53 words
A method for determining a component of the response of a hydrocarbons reservoir to tidal forces according to claim 1 wherein said component of the response to tidal forces is selected from the group consisting of: the amplitude of variation of said response, the delay time of said response, and a combination thereof.
Claim 17
Dependent Claim 32 words
A method for determining a component of the response of a hydrocarbons reservoir to tidal forces according to claim 1 wherein said theoretical earth-tide is calculated using a calibrated gravity magnification factor.
Claim 18
Dependent Claim 89 words
A method for determining a component of the response of a hydrocarbons reservoir to tidal forces according to claim 16 wherein said calibrated gravity magnification factor is determined by: (a) measuring calibrated gravity at said reservoir over a reference time period, (b) determining a first approximation of the theoretical earth-tide for said reservoir over said reference time period using an arbitrary gravity magnification factor, and (c) determining the calibrated gravity magnification factor for said reservoir by comparing said gravity measurements and said first approximation of the theoretical earth-tide determinations.
Claim 19
Dependent Claim 29 words
A method for determining a component of the response of a hydrocarbons reservoir to tidal forces according to claim 17 wherein said calibrated gravity is the calibrated relative gravity.
Claim 20
Dependent Claim 43 words
A method for determining a component of the response of a hydrocarbons reservoir to tidal forces according to claim 17 wherein said reference time period is sufficiently long so that both a maximum and minimum gravity measurement is achieved during that time period.
Claim 21
Dependent Claim 31 words
A method for determining a component of the response of a hydrocarbons reservoir to tidal forces according to claim 19 wherein said reference time period is at least fourteen hours long.
Claim 22
Dependent Claim 31 words
A method for determining a component of the response of a hydrocarbons reservoir to tidal forces according to claim 20 wherein said reference time period is at least twenty-four hours long.
Claim 23
Dependent Claim 38 words
A method for determining a component of the response of a hydrocarbons reservoir to tidal forces according to claim 16 wherein said component of the response to tidal forces comprises the absolute amplitude of variation of said response.
Claim 24
Independent Claim 111 words
A method for determining the effectiveness of at least one production operation in a given borehole in a hydrocarbons reservoir comprising: (a) determining a component of the response of a hydrocarbons reservoir to tidal forces over a first measurement time period, (b) subjecting said reservoir to said production operation after said first measurement time period, (c) determining the same component of the response of the reservoir to tidal forces over a second measurement time period after said first measurement time period and after the beginning of said production operation, and (d) comparing said component of the response of the reservoir to tidal forces for said first and second measurement time periods.
Claim 25
Independent Claim 111 words
A method for determining the effectiveness of at least one production operation in a given borehole in a hydrocarbons reservoir comprising: (a) determining a component of the response of a hydrocarbons reservoir to tidal forces over a first measurement time period, (b) subjecting said reservoir to said production operation after said first measurement time period, (c) determining the same component of the response of the reservoir to tidal forces over a second measurement time period after said first measurement time period and after the beginning of said production operation, and (d) comparing said component of the response of the reservoir to tidal forces for said first and second measurement time periods.
Claim 26
Dependent Claim 92 words
A method for determining the effectiveness of at least one production operation in a given borehole in a hydrocarbons reservoir according to claim 23 wherein said component of the response of the reservoir to tidal forces is determined by the steps comprising: (a) measuring a variable responsive to tidal forces within said reservoir over said measurement time periods; (b) determining a theoretical earth-tide for said reservoir over said measurement time periods; and (c) determining said component of the response to tidal forces by comparing said variable measurements and said theoretical earth-tide determinations.
Claim 27
Dependent Claim 47 words
A method for determining the effectiveness of at least one production operation in a given borehole in a hydrocarbons reservoir according to claim 24 wherein said measurement time periods are sufficiently long so that both a maximum and minimum variable measurement is achieved during each time period.
Claim 28
Dependent Claim 39 words
A method for determining the effectiveness of at least one production operation in a given borehole in a hydrocarbons reservoir according to claim 25 wherein said first and second measurement time periods are both at least fourteen hours long.
Claim 29
Dependent Claim 39 words
A method for determining the effectiveness of at least one production operation in a given borehole in a hydrocarbons reservoir according to claim 26 wherein said first and second measurement time periods are both at least twenty-four hours long.
Claim 30
Dependent Claim 39 words
A method for determining the effectiveness of at least one production operation in a given borehole in a hydrocarbons reservoir according to claim 24 wherein said variable responsive to tidal forces is measured continuously throughout said measurement time periods.
Claim 31
Dependent Claim 43 words
A method for determining the effectiveness of at least one production operation in a given borehole in a hydrocarbons reservoir according to claim 24 wherein said variable responsive to tidal forces is measured at least every fifteen minutes throughout said measurement time periods.
Claim 32
Independent Claim 182 words
A method for determining the effectiveness of at least one production operation in a given borehole in a hydrocarbons reservoir comprising: (a) measuring a variable responsive to tidal forces within said reservoir over a first measurement time period, wherein said first measurement time period is sufficiently long so that both a maximum and minimum variable measurement is achieved during that time period; (b) determining the amplitude of variation of said variable measurements for said first measurement time period; (c) subjecting said reservoir to said production operation after said first measurement time period, (d) measuring the same variable responsive to tidal forces within said reservoir over a second measurement time period after said first measurement time period and after the beginning of said production operation, wherein said second measurement time period is sufficiently long so that both a maximum and minimum variable measurement is achieved during that time period; (e) determining the amplitude of variation of said variable measurements for said second measurement time period; and (f) comparing said amplitudes of variation of the variable for said first and second measurement time periods.
Claim 33
Independent Claim 182 words
A method for determining the effectiveness of at least one production operation in a given borehole in a hydrocarbons reservoir comprising: (a) measuring a variable responsive to tidal forces within said reservoir over a first measurement time period, wherein said first measurement time period is sufficiently long so that both a maximum and minimum variable measurement is achieved during that time period; (b) determining the amplitude of variation of said variable measurements for said first measurement time period; (c) subjecting said reservoir to said production operation after said first measurement time period, (d) measuring the same variable responsive to tidal forces within said reservoir over a second measurement time period after said first measurement time period and after the beginning of said production operation, wherein said second measurement time period is sufficiently long so that both a maximum and minimum variable measurement is achieved during that time period; (e) determining the amplitude of variation of said variable measurements for said second measurement time period; and (f) comparing said amplitudes of variation of the variable for said first and second measurement time periods.
Claim 34
Independent Claim 50 words
A method for comparing reservoir properties in at least two different boreholes in the same hydrocarbons reservoir comprising: (a) determining the same component of the response of the reservoir to tidal forces at each of said boreholes, (b) comparing the same component of the response for each of said boreholes.
Claim 35
Independent Claim 50 words
A method for comparing reservoir properties in at least two different boreholes in the same hydrocarbons reservoir comprising: (a) determining the same component of the response of the reservoir to tidal forces at each of said boreholes, (b) comparing the same component of the response for each of said boreholes.
Claim 36
Dependent Claim 94 words
A method for comparing reservoir properties in at least two different boreholes in the same hydrocarbons reservoir according to claim 31 wherein said component of the response of the reservoir to tidal forces is determined by the steps comprising: (a) measuring a variable responsive to tidal forces at each of said boreholes within said reservoir over a measurement time period; (b) determining a theoretical earth-tide for said reservoir over said measurement time period; and (c) determining said component of the response to tidal forces by comparing said variable measurements and said theoretical earth-tide determinations.
Claim 37
Independent Claim 91 words
A method for comparing reservoir properties in at least two different boreholes in the same hydrocarbons reservoir comprising: (a) measuring, at each borehole over a measurement time period, the same variable responsive to tidal forces, wherein said measurement time period is sufficiently long so that both a maximum and minimum variable measurement is achieved during that time period; (b) determining the amplitude of variation of the variable at each borehole from said variable measurements for said measurement time period; (c) comparing the amplitudes of variation of the variable at each borehole.
Claim 38
Independent Claim 91 words
A method for comparing reservoir properties in at least two different boreholes in the same hydrocarbons reservoir comprising: (a) measuring, at each borehole over a measurement time period, the same variable responsive to tidal forces, wherein said measurement time period is sufficiently long so that both a maximum and minimum variable measurement is achieved during that time period; (b) determining the amplitude of variation of the variable at each borehole from said variable measurements for said measurement time period; (c) comparing the amplitudes of variation of the variable at each borehole.
Claim 39
Independent Claim 46 words
A method for comparing reservoir properties at least two different boreholes in the same hydrocarbons reservoir comprising: (a) measuring, at each borehole over a measurement time period, the same variable responsive to tidal forces; and (b) determining the relative delay in the variable at each borehole.
Claim 40
Independent Claim 46 words
A method for comparing reservoir properties at least two different boreholes in the same hydrocarbons reservoir comprising: (a) measuring, at each borehole over a measurement time period, the same variable responsive to tidal forces; and (b) determining the relative delay in the variable at each borehole.
Claim 41
Independent Claim 128 words
A method for determining the spatial effectiveness of at least one production operation in a hydrocarbons reservoir comprising: (a) determining a component of the response of a hydrocarbons reservoir to tidal forces at a plurality of boreholes over a first measurement time period, (b) subjecting said reservoir to said production operation after said first measurement time period, (c) determining the same component of the response of the reservoir to tidal forces at said boreholes over a second measurement time period after said first measurement time period and after the beginning of said production operation, and (d) comparing said component of the response of the reservoir to tidal forces for said first and second measurement time periods for each borehole to determine the spatial effectiveness of that production operation.
Claim 42
Independent Claim 128 words
A method for determining the spatial effectiveness of at least one production operation in a hydrocarbons reservoir comprising: (a) determining a component of the response of a hydrocarbons reservoir to tidal forces at a plurality of boreholes over a first measurement time period, (b) subjecting said reservoir to said production operation after said first measurement time period, (c) determining the same component of the response of the reservoir to tidal forces at said boreholes over a second measurement time period after said first measurement time period and after the beginning of said production operation, and (d) comparing said component of the response of the reservoir to tidal forces for said first and second measurement time periods for each borehole to determine the spatial effectiveness of that production operation.
Claim 43
Dependent Claim 89 words
A method for determining the spatial effectiveness of at least one production operation in a hydrocarbons reservoir according to claim 35 wherein said component of the response of the reservoir to tidal forces is determined by the steps comprising: (a) measuring a variable responsive to tidal forces within said reservoir over said measurement time periods; (b) determining a theoretical earth-tide for said reservoir over said measurement time periods; and (c) determining said component of the response to tidal forces by comparing said variable measurements and said theoretical earth-tide determinations.
Claim 44
Independent Claim 199 words
A method for determining the spatial effectiveness of at least one production operation in a hydrocarbons reservoir comprising: (a) measuring a variable responsive to tidal forces at a plurality of boreholes within said reservoir over a first measurement time period, wherein said first measurement time period is sufficiently long so that both a maximum and minimum variable measurement is achieved during that time period; (b) determining the amplitudes of variation of said variable measurements for said first measurement time period; (c) subjecting said reservoir to said production operation after said first measurement time period, (d) measuring the same variable responsive to tidal forces at said boreholes within said reservoir over a second measurement time period after said first measurement time period and after the beginning of said production operation, wherein said second measurement time period is sufficiently long so that both a maximum and minimum variable measurement is achieved during that time period; (e) determining the amplitudes of variation of said variable measurements for said second measurement time period; and (f) comparing said amplitudes of variation of the variable for said first and second measurement time periods for each borehole to determine the spatial effectiveness of that production operation.
Claim 45
Independent Claim 199 words
A method for determining the spatial effectiveness of at least one production operation in a hydrocarbons reservoir comprising: (a) measuring a variable responsive to tidal forces at a plurality of boreholes within said reservoir over a first measurement time period, wherein said first measurement time period is sufficiently long so that both a maximum and minimum variable measurement is achieved during that time period; (b) determining the amplitudes of variation of said variable measurements for said first measurement time period; (c) subjecting said reservoir to said production operation after said first measurement time period, (d) measuring the same variable responsive to tidal forces at said boreholes within said reservoir over a second measurement time period after said first measurement time period and after the beginning of said production operation, wherein said second measurement time period is sufficiently long so that both a maximum and minimum variable measurement is achieved during that time period; (e) determining the amplitudes of variation of said variable measurements for said second measurement time period; and (f) comparing said amplitudes of variation of the variable for said first and second measurement time periods for each borehole to determine the spatial effectiveness of that production operation.

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1994-08-19 1995-02-18 1995-08-20 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1998-08-19 1999-02-18 1999-08-20 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 2002-08-19 2003-02-18 2003-08-20 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag