Claims Analysis
Total Claims: 45
Claim 1
Independent Claim
67 words
A method for determining a component of the response of a hydrocarbons reservoir to tidal forces comprising: (a) measuring a variable responsive to tidal forces within said reservoir over a measurement time period; (b) determining a theoretical earth-tide for said reservoir over said measurement time period; and (c) determining said component of the response to tidal forces by comparing said variable measurements and said theoretical earth-tide determinations.
Claim 2
Independent Claim
67 words
A method for determining a component of the response of a hydrocarbons reservoir to tidal forces comprising: (a) measuring a variable responsive to tidal forces within said reservoir over a measurement time period; (b) determining a theoretical earth-tide for said reservoir over said measurement time period; and (c) determining said component of the response to tidal forces by comparing said variable measurements and said theoretical earth-tide determinations.
Claim 3
Dependent Claim
33 words
A method for determining a component of the response of a hydrocarbons reservoir to tidal forces according to claim 1 wherein said variable responsive to tidal forces is fluid level within a borehole.
Claim 4
Dependent Claim
29 words
A method for determining a component of the response of a hydrocarbons reservoir to tidal forces according to claim 1 wherein said variable responsive to tidal forces is pressure.
Claim 5
Dependent Claim
34 words
A method for determining a component of the response of a hydrocarbons reservoir to tidal forces according to claim 3 wherein said pressure comprises a pressure measured within the liquid phase of said reservoir.
Claim 6
Dependent Claim
36 words
A method for determining a component of the response of a hydrocarbons reservoir to tidal forces according to claim 4 wherein said pressure further comprises a pressure measured outside of the liquid phase of said reservoir.
Claim 7
Dependent Claim
30 words
A method for determining a component of the response of a hydrocarbons reservoir to tidal forces according to claim 1 wherein said variable responsive to tidal forces is borehole stress.
Claim 8
Dependent Claim
43 words
A method for determining a component of the response of a hydrocarbons reservoir to tidal forces according to claim 1 wherein said measurement time period is sufficiently long so that both a maximum and minimum variable measurement is achieved during that time period.
Claim 9
Dependent Claim
31 words
A method for determining a component of the response of a hydrocarbons reservoir to tidal forces according to claim 7 wherein said measurement time period is at least fourteen hours long.
Claim 10
Dependent Claim
31 words
A method for determining a component of the response of a hydrocarbons reservoir to tidal forces according to claim 8 wherein said measurement time period is at least twenty-four hours long.
Claim 11
Dependent Claim
35 words
A method for determining a component of the response of a hydrocarbons reservoir to tidal forces according to claim 1 wherein said variable responsive to tidal forces is measured continuously throughout said measurement time period.
Claim 12
Dependent Claim
39 words
A method for determining a component of the response of a hydrocarbons reservoir to tidal forces according to claim 1 wherein said variable responsive to tidal forces is measured at least every fifteen minutes throughout said measurement time period.
Claim 13
Dependent Claim
37 words
A method for determining a component of the response of a hydrocarbons reservoir to tidal forces according to claim 1 wherein said component of the response to tidal forces comprises the amplitude of variation of said response.
Claim 14
Dependent Claim
36 words
A method for determining a component of the response of a hydrocarbons reservoir to tidal forces according to claim 1 wherein said component of the response to tidal forces comprises the delay time of said response.
Claim 15
Dependent Claim
70 words
A method for determining a component of the response of a hydrocarbons reservoir to tidal forces according to claim 1 wherein said component of the response to tidal forces is the combination of the amplitude of variation of said response and the delay time of said response; and wherein said component of the response to tidal forces is factored out from said variable measurements to reveal a residual time serials.
Claim 16
Dependent Claim
53 words
A method for determining a component of the response of a hydrocarbons reservoir to tidal forces according to claim 1 wherein said component of the response to tidal forces is selected from the group consisting of: the amplitude of variation of said response, the delay time of said response, and a combination thereof.
Claim 17
Dependent Claim
32 words
A method for determining a component of the response of a hydrocarbons reservoir to tidal forces according to claim 1 wherein said theoretical earth-tide is calculated using a calibrated gravity magnification factor.
Claim 18
Dependent Claim
89 words
A method for determining a component of the response of a hydrocarbons reservoir to tidal forces according to claim 16 wherein said calibrated gravity magnification factor is determined by: (a) measuring calibrated gravity at said reservoir over a reference time period, (b) determining a first approximation of the theoretical earth-tide for said reservoir over said reference time period using an arbitrary gravity magnification factor, and (c) determining the calibrated gravity magnification factor for said reservoir by comparing said gravity measurements and said first approximation of the theoretical earth-tide determinations.
Claim 19
Dependent Claim
29 words
A method for determining a component of the response of a hydrocarbons reservoir to tidal forces according to claim 17 wherein said calibrated gravity is the calibrated relative gravity.
Claim 20
Dependent Claim
43 words
A method for determining a component of the response of a hydrocarbons reservoir to tidal forces according to claim 17 wherein said reference time period is sufficiently long so that both a maximum and minimum gravity measurement is achieved during that time period.
Claim 21
Dependent Claim
31 words
A method for determining a component of the response of a hydrocarbons reservoir to tidal forces according to claim 19 wherein said reference time period is at least fourteen hours long.
Claim 22
Dependent Claim
31 words
A method for determining a component of the response of a hydrocarbons reservoir to tidal forces according to claim 20 wherein said reference time period is at least twenty-four hours long.
Claim 23
Dependent Claim
38 words
A method for determining a component of the response of a hydrocarbons reservoir to tidal forces according to claim 16 wherein said component of the response to tidal forces comprises the absolute amplitude of variation of said response.
Claim 24
Independent Claim
111 words
A method for determining the effectiveness of at least one production operation in a given borehole in a hydrocarbons reservoir comprising: (a) determining a component of the response of a hydrocarbons reservoir to tidal forces over a first measurement time period, (b) subjecting said reservoir to said production operation after said first measurement time period, (c) determining the same component of the response of the reservoir to tidal forces over a second measurement time period after said first measurement time period and after the beginning of said production operation, and (d) comparing said component of the response of the reservoir to tidal forces for said first and second measurement time periods.
Claim 25
Independent Claim
111 words
A method for determining the effectiveness of at least one production operation in a given borehole in a hydrocarbons reservoir comprising: (a) determining a component of the response of a hydrocarbons reservoir to tidal forces over a first measurement time period, (b) subjecting said reservoir to said production operation after said first measurement time period, (c) determining the same component of the response of the reservoir to tidal forces over a second measurement time period after said first measurement time period and after the beginning of said production operation, and (d) comparing said component of the response of the reservoir to tidal forces for said first and second measurement time periods.
Claim 26
Dependent Claim
92 words
A method for determining the effectiveness of at least one production operation in a given borehole in a hydrocarbons reservoir according to claim 23 wherein said component of the response of the reservoir to tidal forces is determined by the steps comprising: (a) measuring a variable responsive to tidal forces within said reservoir over said measurement time periods; (b) determining a theoretical earth-tide for said reservoir over said measurement time periods; and (c) determining said component of the response to tidal forces by comparing said variable measurements and said theoretical earth-tide determinations.
Claim 27
Dependent Claim
47 words
A method for determining the effectiveness of at least one production operation in a given borehole in a hydrocarbons reservoir according to claim 24 wherein said measurement time periods are sufficiently long so that both a maximum and minimum variable measurement is achieved during each time period.
Claim 28
Dependent Claim
39 words
A method for determining the effectiveness of at least one production operation in a given borehole in a hydrocarbons reservoir according to claim 25 wherein said first and second measurement time periods are both at least fourteen hours long.
Claim 29
Dependent Claim
39 words
A method for determining the effectiveness of at least one production operation in a given borehole in a hydrocarbons reservoir according to claim 26 wherein said first and second measurement time periods are both at least twenty-four hours long.
Claim 30
Dependent Claim
39 words
A method for determining the effectiveness of at least one production operation in a given borehole in a hydrocarbons reservoir according to claim 24 wherein said variable responsive to tidal forces is measured continuously throughout said measurement time periods.
Claim 31
Dependent Claim
43 words
A method for determining the effectiveness of at least one production operation in a given borehole in a hydrocarbons reservoir according to claim 24 wherein said variable responsive to tidal forces is measured at least every fifteen minutes throughout said measurement time periods.
Claim 32
Independent Claim
182 words
A method for determining the effectiveness of at least one production operation in a given borehole in a hydrocarbons reservoir comprising: (a) measuring a variable responsive to tidal forces within said reservoir over a first measurement time period, wherein said first measurement time period is sufficiently long so that both a maximum and minimum variable measurement is achieved during that time period; (b) determining the amplitude of variation of said variable measurements for said first measurement time period; (c) subjecting said reservoir to said production operation after said first measurement time period, (d) measuring the same variable responsive to tidal forces within said reservoir over a second measurement time period after said first measurement time period and after the beginning of said production operation, wherein said second measurement time period is sufficiently long so that both a maximum and minimum variable measurement is achieved during that time period; (e) determining the amplitude of variation of said variable measurements for said second measurement time period; and (f) comparing said amplitudes of variation of the variable for said first and second measurement time periods.
Claim 33
Independent Claim
182 words
A method for determining the effectiveness of at least one production operation in a given borehole in a hydrocarbons reservoir comprising: (a) measuring a variable responsive to tidal forces within said reservoir over a first measurement time period, wherein said first measurement time period is sufficiently long so that both a maximum and minimum variable measurement is achieved during that time period; (b) determining the amplitude of variation of said variable measurements for said first measurement time period; (c) subjecting said reservoir to said production operation after said first measurement time period, (d) measuring the same variable responsive to tidal forces within said reservoir over a second measurement time period after said first measurement time period and after the beginning of said production operation, wherein said second measurement time period is sufficiently long so that both a maximum and minimum variable measurement is achieved during that time period; (e) determining the amplitude of variation of said variable measurements for said second measurement time period; and (f) comparing said amplitudes of variation of the variable for said first and second measurement time periods.
Claim 34
Independent Claim
50 words
A method for comparing reservoir properties in at least two different boreholes in the same hydrocarbons reservoir comprising: (a) determining the same component of the response of the reservoir to tidal forces at each of said boreholes, (b) comparing the same component of the response for each of said boreholes.
Claim 35
Independent Claim
50 words
A method for comparing reservoir properties in at least two different boreholes in the same hydrocarbons reservoir comprising: (a) determining the same component of the response of the reservoir to tidal forces at each of said boreholes, (b) comparing the same component of the response for each of said boreholes.
Claim 36
Dependent Claim
94 words
A method for comparing reservoir properties in at least two different boreholes in the same hydrocarbons reservoir according to claim 31 wherein said component of the response of the reservoir to tidal forces is determined by the steps comprising: (a) measuring a variable responsive to tidal forces at each of said boreholes within said reservoir over a measurement time period; (b) determining a theoretical earth-tide for said reservoir over said measurement time period; and (c) determining said component of the response to tidal forces by comparing said variable measurements and said theoretical earth-tide determinations.
Claim 37
Independent Claim
91 words
A method for comparing reservoir properties in at least two different boreholes in the same hydrocarbons reservoir comprising: (a) measuring, at each borehole over a measurement time period, the same variable responsive to tidal forces, wherein said measurement time period is sufficiently long so that both a maximum and minimum variable measurement is achieved during that time period; (b) determining the amplitude of variation of the variable at each borehole from said variable measurements for said measurement time period; (c) comparing the amplitudes of variation of the variable at each borehole.
Claim 38
Independent Claim
91 words
A method for comparing reservoir properties in at least two different boreholes in the same hydrocarbons reservoir comprising: (a) measuring, at each borehole over a measurement time period, the same variable responsive to tidal forces, wherein said measurement time period is sufficiently long so that both a maximum and minimum variable measurement is achieved during that time period; (b) determining the amplitude of variation of the variable at each borehole from said variable measurements for said measurement time period; (c) comparing the amplitudes of variation of the variable at each borehole.
Claim 39
Independent Claim
46 words
A method for comparing reservoir properties at least two different boreholes in the same hydrocarbons reservoir comprising: (a) measuring, at each borehole over a measurement time period, the same variable responsive to tidal forces; and (b) determining the relative delay in the variable at each borehole.
Claim 40
Independent Claim
46 words
A method for comparing reservoir properties at least two different boreholes in the same hydrocarbons reservoir comprising: (a) measuring, at each borehole over a measurement time period, the same variable responsive to tidal forces; and (b) determining the relative delay in the variable at each borehole.
Claim 41
Independent Claim
128 words
A method for determining the spatial effectiveness of at least one production operation in a hydrocarbons reservoir comprising: (a) determining a component of the response of a hydrocarbons reservoir to tidal forces at a plurality of boreholes over a first measurement time period, (b) subjecting said reservoir to said production operation after said first measurement time period, (c) determining the same component of the response of the reservoir to tidal forces at said boreholes over a second measurement time period after said first measurement time period and after the beginning of said production operation, and (d) comparing said component of the response of the reservoir to tidal forces for said first and second measurement time periods for each borehole to determine the spatial effectiveness of that production operation.
Claim 42
Independent Claim
128 words
A method for determining the spatial effectiveness of at least one production operation in a hydrocarbons reservoir comprising: (a) determining a component of the response of a hydrocarbons reservoir to tidal forces at a plurality of boreholes over a first measurement time period, (b) subjecting said reservoir to said production operation after said first measurement time period, (c) determining the same component of the response of the reservoir to tidal forces at said boreholes over a second measurement time period after said first measurement time period and after the beginning of said production operation, and (d) comparing said component of the response of the reservoir to tidal forces for said first and second measurement time periods for each borehole to determine the spatial effectiveness of that production operation.
Claim 43
Dependent Claim
89 words
A method for determining the spatial effectiveness of at least one production operation in a hydrocarbons reservoir according to claim 35 wherein said component of the response of the reservoir to tidal forces is determined by the steps comprising: (a) measuring a variable responsive to tidal forces within said reservoir over said measurement time periods; (b) determining a theoretical earth-tide for said reservoir over said measurement time periods; and (c) determining said component of the response to tidal forces by comparing said variable measurements and said theoretical earth-tide determinations.
Claim 44
Independent Claim
199 words
A method for determining the spatial effectiveness of at least one production operation in a hydrocarbons reservoir comprising: (a) measuring a variable responsive to tidal forces at a plurality of boreholes within said reservoir over a first measurement time period, wherein said first measurement time period is sufficiently long so that both a maximum and minimum variable measurement is achieved during that time period; (b) determining the amplitudes of variation of said variable measurements for said first measurement time period; (c) subjecting said reservoir to said production operation after said first measurement time period, (d) measuring the same variable responsive to tidal forces at said boreholes within said reservoir over a second measurement time period after said first measurement time period and after the beginning of said production operation, wherein said second measurement time period is sufficiently long so that both a maximum and minimum variable measurement is achieved during that time period; (e) determining the amplitudes of variation of said variable measurements for said second measurement time period; and (f) comparing said amplitudes of variation of the variable for said first and second measurement time periods for each borehole to determine the spatial effectiveness of that production operation.
Claim 45
Independent Claim
199 words
A method for determining the spatial effectiveness of at least one production operation in a hydrocarbons reservoir comprising: (a) measuring a variable responsive to tidal forces at a plurality of boreholes within said reservoir over a first measurement time period, wherein said first measurement time period is sufficiently long so that both a maximum and minimum variable measurement is achieved during that time period; (b) determining the amplitudes of variation of said variable measurements for said first measurement time period; (c) subjecting said reservoir to said production operation after said first measurement time period, (d) measuring the same variable responsive to tidal forces at said boreholes within said reservoir over a second measurement time period after said first measurement time period and after the beginning of said production operation, wherein said second measurement time period is sufficiently long so that both a maximum and minimum variable measurement is achieved during that time period; (e) determining the amplitudes of variation of said variable measurements for said second measurement time period; and (f) comparing said amplitudes of variation of the variable for said first and second measurement time periods for each borehole to determine the spatial effectiveness of that production operation.