← Back to Patent Explorer
US5022895A Expired / Lapsed US ⏱️ 0.0 years remaining

Multilayer abrading tool and process

Assignee: Individual
•
Filing: 1989-10-18
•
Granted: 1991-06-11
•
Expires: 2009-10-18
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A multilayer abrading tool is produced by first providing a tool substrate with a structured abrading surface. An abrasive grit coating is provided by mixing a temporary binder, an abrasive grit material and an infiltrant powder material. This coating is then applied to the structured surface. The tool is then heated to drive off the binder and to cause infiltration of the infiltrant in the abrasive grit to form a multilayer of diamond grit suspended in a braze matrix which is attached to the structured surface of the tool substrate.

Inventors

  • 👤 Ronald C. Wiand

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-04 22:04
CPC Classifications
B; B24; B24D; B24D3/00; B24D3/02; B24D3/04; B24D3/06; B24D3/10; B24D3/34; B24D3/348; B24D5/00; B24D5/14

Claims Analysis

Total Claims: 3
Claim 1
Independent Claim 55 words
An abrading tool having a "multilayer abrasive grit matrix surface layer" produced without a mold, said abrading tool comprising: an abrading tool substrate, having a structured abrading surface, and a multilayer of abrasive particles attached thereto in substantially an even thickness coating, said multilayer of abrasive particles being diamond grit suspended in an infiltrant matrix.
Claim 2
Dependent Claim 55 words
An abrading tool having a "multilayer abrasive grit matrix surface layer" produced without a mold, said abrading tool comprising: an abrading tool substrate, having a structured abrading surface, and a multilayer of abrasive particles attached thereto in substantially an even thickness coating, said multilayer of abrasive particles being diamond grit suspended in an infiltrant matrix.
Claim 3
Dependent Claim 86 words
The abrading tool of claim 1 wherein the multilayer of abrasive particles is provided on said structured abrading surface by coating the structured abrading surface with a layer of an abrasive grit suspended in an infiltrant martix, in its green state with a temporary binder and thereafter heating said coating to drive off the binder and cause infiltration of said infiltrant matrix thereby suspending the abrasive grit particles in the infiltrant matrix in a multilayer and to bond said infiltrant matrix to the structured abrading surface.

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1994-06-10 1994-12-10 1995-06-11 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1998-06-10 1998-12-10 1999-06-11 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 2002-06-10 2002-12-10 2003-06-11 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag