← Back to Patent Explorer
US5016435A Expired / Lapsed US ⏱️ 0.0 years remaining

Method of controlling a PFBC plant in the event of operational disturbance in the gas turbine unit

Assignee: ABB Stal AB
•
Filing: 1990-09-28
•
Granted: 1991-05-21
•
Expires: 2010-09-28
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract In a PFBC power plant having a bed vessel containing a bed of fluidizable particulate material enclosed within a pressure vessel and surrounded by compressed combustion air, a gas turbine-compressor unit driven by combustion gases from the bed vessel, a first cut-off valve in a supply conduit for propellent gas to a turbine; a second cut-off valve in the conduit from a compressor to the bed vessel, a third cut-off valve in a by-pass conduit between the turbine and the compressor, and a blow-off valve in a conduit for dumping combustion gases from the bed vessel, a method of controlling such power plant in the event of an operational disturbance in the turbine unit comprises the steps of isolating the compressor-turbine unit from the bed vessel by closing the first cut-off valve in the supply conduit and the second cut-off valve in the conduit from the compressor to the bed vessel, short-circuiting the compressor-turbine unit by opening the valve in the bypass conduit, dumping the combustion gases by opening the blow-off valve, and injecting cooling water into the gases being dumped in the conduit for dumping gases between the bed vessel and the blow-off valve.

Inventors

  • 👤 Roine Brannstrom

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-03 21:36
CPC Classifications
F; F02; F02C; F02C3/00; F02C3/20; F02C3/205; F02C9/00; F02C9/16; F02C9/18; F23; F23C; F23C10/00; F23C10/16

Claims Analysis

Total Claims: 6
Claim 1
Independent Claim 217 words
A method of controlling a PFBC plant in the event of operational disturbance in the turbine unit, the PFBC power plant having a bed vessel enclosed within a pressure vessel and surrounded by compressed combustion air, the bed vessel containing a bed of fluidizable particulate material; a gas turbine-compressor unit driven by combustion gases from the bed vessel; a first cut-off valve in a supply conduit for propellent gas to a turbine; a second cut-off valve in the conduit from a compressor to the bed vessel; a third cut-off valve in a by-pass conduit between the turbine and the compressor; and a blow-off valve in a conduit for dumping combustion gases from the bed vessel, said method comprising the steps of: isolating the gas compressor-turbine unit from the bed vessel by closing the first cut-off valve in the supply conduit and the second cut-off valve in the conduit from the compressor to the bed vessel; short-circuiting the compressor-turbine unit by opening the valve in the bypass conduit; dumping the combustion gases by opening said blow-off valve; and injecting cooling water into the combustion gases being dumped in the conduit for dumping the combustion gases at a location between the bed vessel and said blow-off valve such that said combustion gases are cooled before reaching said blow-off valve.
Claim 2
Independent Claim 217 words
A method of controlling a PFBC plant in the event of operational disturbance in the turbine unit, the PFBC power plant having a bed vessel enclosed within a pressure vessel and surrounded by compressed combustion air, the bed vessel containing a bed of fluidizable particulate material; a gas turbine-compressor unit driven by combustion gases from the bed vessel; a first cut-off valve in a supply conduit for propellent gas to a turbine; a second cut-off valve in the conduit from a compressor to the bed vessel; a third cut-off valve in a by-pass conduit between the turbine and the compressor; and a blow-off valve in a conduit for dumping combustion gases from the bed vessel, said method comprising the steps of: isolating the gas compressor-turbine unit from the bed vessel by closing the first cut-off valve in the supply conduit and the second cut-off valve in the conduit from the compressor to the bed vessel; short-circuiting the compressor-turbine unit by opening the valve in the bypass conduit; dumping the combustion gases by opening said blow-off valve; and injecting cooling water into the combustion gases being dumped in the conduit for dumping the combustion gases at a location between the bed vessel and said blow-off valve such that said combustion gases are cooled before reaching said blow-off valve.
Claim 3
Dependent Claim 32 words
A method according to claim 1, wherein the cooling water is supplied to the gases being dumped in such a quantity that the gases are cooled to a temperature below 400° C.
Claim 4
Dependent Claim 32 words
A method according to claim 1, wherein the cooling water flow is controlled such that the gases downstream of the cooling water injection point attain a constant temperature during the blow-off process.
Claim 5
Dependent Claim 41 words
A method according to claim 1, wherein the cooling water flow is controlled such that the gases downstream of the cooling water injection point attain a temperature below about 400° C. but exceeding the acid dew point of about 120°-180° C.
Claim 6
Dependent Claim 18 words
A method according to claim 1, wherein the cooling water is supplied from a permanently pressurized coolant container.

References Cited (Backward Citations)

US3203175A Cited
US4281510A Cited
US4306411A Cited
US4315400A Cited
US4380147A Cited
US4498286A Cited
US4498285A Cited
US4744212A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1994-05-20 1994-11-19 1995-05-21 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1998-05-20 1998-11-19 1999-05-21 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 2002-05-20 2002-11-19 2003-05-21 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag