Claims Analysis
Total Claims: 12
Claim 1
Independent Claim
160 words
A method of forming a barrier against downward flow of fluid contaminants through a subterranean porous formation, comprising the steps of: injecting into the porous formation at a predetermined depth a fluid medium capable of forming a fluid-impermeable material over a period of time; the fluid medium being injected at a pressure greater than the pressure of the overburden to cause the formation to fracture generally horizontally and to move the adjacent overburden formation upwardly, thereby creating a laterally extending void filled with the fluid medium; determining the lateral extent of upward movement of the overburden and thus the lateral extent of the flow of the fluid medium into the void created by said upward movement of the overburden; casing to inject the fluid medium when the lateral extent of the fluid medium flow has reached a predetermined limit; and allowing the fluid medium in the laterally extending void to form an impermeable barrier to downward flow of fluid contaminants.
Claim 2
Independent Claim
160 words
A method of forming a barrier against downward flow of fluid contaminants through a subterranean porous formation, comprising the steps of: injecting into the porous formation at a predetermined depth a fluid medium capable of forming a fluid-impermeable material over a period of time; the fluid medium being injected at a pressure greater than the pressure of the overburden to cause the formation to fracture generally horizontally and to move the adjacent overburden formation upwardly, thereby creating a laterally extending void filled with the fluid medium; determining the lateral extent of upward movement of the overburden and thus the lateral extent of the flow of the fluid medium into the void created by said upward movement of the overburden; casing to inject the fluid medium when the lateral extent of the fluid medium flow has reached a predetermined limit; and allowing the fluid medium in the laterally extending void to form an impermeable barrier to downward flow of fluid contaminants.
Claim 3
Dependent Claim
19 words
The method of claim 1, wherein the fluid medium is injected at a depth less than about 1000 feet.
Claim 4
Dependent Claim
30 words
The method of claim 1, wherein the fluid medium comprises an aqueous slurry selected from the group consisting essentially of portland cement, well casing cement, epoxy, bentonite and plastic foam.
Claim 5
Dependent Claim
32 words
The method of claim 1, wherein the fluid medium comprises a liquid composition capable of gelling to form a gel comprising a carboxylate-containing polymer crosslinked with a chromic carboxylate complex crosslinking agent.
Claim 6
Dependent Claim
12 words
The method of claim 4, wherein the polymer is an acrylamide polymer.
Claim 7
Dependent Claim
31 words
The method of claim 5, wherein the polymer is a polymer selected from the group consisting of polyacrylamide and partially hydrolyzed polyacrylamide, and the crosslinking agent is a chromic acetate complex.
Claim 8
Dependent Claim
31 words
The method of claim 1, wherein the lateral extent of the upward movement of the overburden is determined by monitoring the movement of the earth by means of an electronic tiltmeter.
Claim 9
Dependent Claim
35 words
The method of claim 7, wherein a plurality of tiltmeters are connected to a computer programmed to reflect the signal from each tiltmeter in terms of the deformation of the earth at each tiltmeter location.
Claim 10
Independent Claim
174 words
A method of forming a barrier against downward flow of fluid contaminants through a subterranean porous formation, comprising the steps of: forming a cased injection well; providing one or more perforations in the casing of the well at a predetermined depth; injecting a fluid medium through the perforations and into the porous formation, the fluid medium being capable of maturing to a nonflowable condition over a period of time; the fluid medium being injected at a pressure greater than the pressure of the overburden so as to move the adjacent overburden formation upwardly to create a laterally extending void filled with the fluid medium; determining the lateral extent of flow of the fluid medium by monitoring the deformation of the earth by means of an electronic tiltmeter; ceasing to inject the fluid medium when the lateral extent of the fluid medium flow has reached a predetermined point; and allowing the fluid medium in the laterally extending void to mature into nonflowable condition to form an impermeable barrier to downward flow of the fluid contaminant.
Claim 11
Independent Claim
174 words
A method of forming a barrier against downward flow of fluid contaminants through a subterranean porous formation, comprising the steps of: forming a cased injection well; providing one or more perforations in the casing of the well at a predetermined depth; injecting a fluid medium through the perforations and into the porous formation, the fluid medium being capable of maturing to a nonflowable condition over a period of time; the fluid medium being injected at a pressure greater than the pressure of the overburden so as to move the adjacent overburden formation upwardly to create a laterally extending void filled with the fluid medium; determining the lateral extent of flow of the fluid medium by monitoring the deformation of the earth by means of an electronic tiltmeter; ceasing to inject the fluid medium when the lateral extent of the fluid medium flow has reached a predetermined point; and allowing the fluid medium in the laterally extending void to mature into nonflowable condition to form an impermeable barrier to downward flow of the fluid contaminant.
Claim 12
Dependent Claim
18 words
The method of claim 9, wherein the fluid medium is injected at a depth less than 1000 feet.