Method for monitoring the manufacture of a product
Abstract
Abstract A method for monitoring a product under manufacture for possible deformation or changes in shape. In accordance with the method there is produced at given time intervals a series of halographic product images from which the rate at which possible changes in deformation take place in time can be estimated or evaluated. These estimated values relating to the rate of deformation and the rate of progressive changes therein are extrapolated so as to obtain the final value of the deformation of the product in relation to the state or form of the product immediately subsequent to the time of its manufacture. The process of manufacture is controlled on the basis of this final value, and the product is preferably cooled forcibly prior to producing the series of images.
Inventors
- 👤 Ingegerd Dirtoft
Bibliographic Details
Claims Analysis
Total Claims: 4References Cited (Backward Citations)
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1994-01-21 | 1994-07-23 | 1995-01-22 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1998-01-21 | 1998-07-23 | 1999-01-22 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 2002-01-21 | 2002-07-23 | 2003-01-22 | $7700.00 | Window Closed / Lapsed |