US4938627A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Method of slipliner grouting
Assignee: Halliburton Co
•
Filing: 1989-03-07
•
Granted: 1990-07-03
•
Expires: 2009-03-07
Abstract
Abstract The present invention comprises a method of grouting a slipliner in a sewer or drain pipe using foam cements having a specific gravity less than 1.0 and have adequate compressure strength to maintain the slipliner in position within the sewer or drain pipe.
Inventors
- 👤 Lindsey D. Lee
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-01 17:52
CPC Classifications
F; F16; F16L; F16L55/00; F16L55/16; F16L55/162; F16L55/165; E; E03; E03F; E03F3/00; E03F3/06; E03F2003/065
Claims Analysis
Total Claims: 8
Claim 1
Independent Claim
189 words
A method of grouting a slipliner in a sewer, said slipliner forming an annular space between said slipliner and said sewer, said sewer having water therein thereby causing water to be present in said annular space prior to the grouting of said slipliner in said sewer, the method comprising the steps of: sealing said annular space formed between said slipliner and sewer at a location; inserting a grout injection pipe into said annular space formed between said slipliner and sewer to inject grout into said annular space; mixing a grout having a density less than 1.0 specific gravity; pumping the grout through the grout injection pipe into said annular space formed between said slipliner and sewer; floating at least a portion of the grout on said water in said annular space between said slipliner and sewer thereby filling at least a portion of said annular space with grout; and ceasing the pumping of the grout into said annular space formed between said slipliner and sewer prior to the grout forming sufficient hydrostatic fluid pressure in said annular space between said slipliner and sewer to cause said slipliner to collapse.
Claim 2
Independent Claim
189 words
A method of grouting a slipliner in a sewer, said slipliner forming an annular space between said slipliner and said sewer, said sewer having water therein thereby causing water to be present in said annular space prior to the grouting of said slipliner in said sewer, the method comprising the steps of: sealing said annular space formed between said slipliner and sewer at a location; inserting a grout injection pipe into said annular space formed between said slipliner and sewer to inject grout into said annular space; mixing a grout having a density less than 1.0 specific gravity; pumping the grout through the grout injection pipe into said annular space formed between said slipliner and sewer; floating at least a portion of the grout on said water in said annular space between said slipliner and sewer thereby filling at least a portion of said annular space with grout; and ceasing the pumping of the grout into said annular space formed between said slipliner and sewer prior to the grout forming sufficient hydrostatic fluid pressure in said annular space between said slipliner and sewer to cause said slipliner to collapse.
Claim 3
Dependent Claim
61 words
The method of claim 1, wherein: the step of mixing the grout comprises mixing a Portland cement and water to form a mixture and entraining nitrogen gas in the mixture of a Portland cement and water; and the step of pumping the grout comprises pumping the mixture of a Portland cement and water and entrained nitrogen gas into said annular space.
Claim 4
Dependent Claim
61 words
The method of claim 1 wherein: the step of mixing the grout comprises mixing a pozzolan cement and water to form a mixture and entraining nitrogen gas in the mixture of a pozzolan cement and water; and the step of pumping the grout comprises pumping the mixture of a pozzolan cement and water and entrained nitrogen has into said annular space.
Claim 5
Dependent Claim
59 words
The method of claim 1 wherein; the step of mixing the grout comprises mixing a Portland cement and water to form a mixture and entraining air in the mixture of a Portland cement and water; and the step of pumping the grout comprises pumping the mixture of a Portland cement and water and entrained air into said annular space.
Claim 6
Dependent Claim
60 words
The method of claim 1 wherein: the step of mixing the grout comprises mixing a pozzolan cement and water to form a mixture and entraining nitrogen gas in the mixture of a pozzolan cement and water; and the step of pumping the grout comprises pumping the mixture of a pozzolan cement and water and entraining air into said annular space.
Claim 7
Dependent Claim
48 words
The method of claim 1 wherein the method further comprises the step of: after the step of ceasing the pumping of the grout, allowing the grout to set until the grout has a compressive strength at forty eight hours of at least two hundred pounds per square inch.
Claim 8
Dependent Claim
43 words
The method of claim 1 further comprising the step of: allowing the grout to set which has been pumped into said annular space; and pumping additional grout of any desired density into said annular space to substantially fill said annular space with grout.
References Cited (Backward Citations)
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1993-07-02 | 1994-01-01 | 1994-07-03 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1997-07-02 | 1998-01-01 | 1998-07-03 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 2001-07-02 | 2002-01-01 | 2002-07-03 | $7700.00 | Window Closed / Lapsed |