Claims Analysis
Total Claims: 11
Claim 1
Independent Claim
271 words
A process for construction of catchwater drains, drain ribs, supporting ribs or similar structures comprising the steps of: (a) making a first trench-section having a bottom and side faces to its full depth in the soil along a proposed traceline of said catchwater drain; (b) placing a first inflatable hose of a temporary supporting structure into said first trench-section; (c) inflating said first hose to an internal pressure sufficient to ensure stability of the faces of said first trench-section; (d) making a second trench-section to its full depth in the soil adjacent to said first trench-section along said traceline; (e) placing a second inflatable hose of said temporary supporting structure into said second trench-section; (f) inflating said second hose to a desired internal pressure, thereby ensuring temporary stability of faces of said second trench-section; (g) deflating said first hose in said first trench-section; (h) removing the first hose and placing at the bottom portion of the volume occupied by said deflated first hose a first water collecting-aquiferous block laid on the bottom of said first trench-section, said block being placed at least partly in a relatively impermeable soil layer thereby filling out a substantial portion of the lower area of said first trench-section; (i) placing at least one first suction body on top of said first water collecting aquiferous block, said suction body consisting of granular material filled into a filter bag, said filter bag filled to an upper part of said first suction body in the vicinity of the groundsurface; and (j) making another trench-section using the steps (a) to (i) along the traceline until the catchwater drain is completed.
Claim 2
Dependent Claim
271 words
A process for construction of catchwater drains, drain ribs, supporting ribs or similar structures comprising the steps of: (a) making a first trench-section having a bottom and side faces to its full depth in the soil along a proposed traceline of said catchwater drain; (b) placing a first inflatable hose of a temporary supporting structure into said first trench-section; (c) inflating said first hose to an internal pressure sufficient to ensure stability of the faces of said first trench-section; (d) making a second trench-section to its full depth in the soil adjacent to said first trench-section along said traceline; (e) placing a second inflatable hose of said temporary supporting structure into said second trench-section; (f) inflating said second hose to a desired internal pressure, thereby ensuring temporary stability of faces of said second trench-section; (g) deflating said first hose in said first trench-section; (h) removing the first hose and placing at the bottom portion of the volume occupied by said deflated first hose a first water collecting-aquiferous block laid on the bottom of said first trench-section, said block being placed at least partly in a relatively impermeable soil layer thereby filling out a substantial portion of the lower area of said first trench-section; (i) placing at least one first suction body on top of said first water collecting aquiferous block, said suction body consisting of granular material filled into a filter bag, said filter bag filled to an upper part of said first suction body in the vicinity of the groundsurface; and (j) making another trench-section using the steps (a) to (i) along the traceline until the catchwater drain is completed.
Claim 3
Dependent Claim
23 words
A process as claimed in claim 1 further comprising making said bottom of the trench-section gradually deeper in the direction of a drainage.
Claim 4
Dependent Claim
30 words
A process as claimed in claim 1 further comprising connecting at least one of said water collecting-aquiferous blocks, situated in the deepest position in said trench, with a drain pipe.
Claim 5
Dependent Claim
27 words
A process as claimed in claim 1 further comprising lifting said inflatable hose out of its trench-section while the internal pressure in said hose is gradually reduced.
Claim 6
Dependent Claim
37 words
A process as claimed in claim 1 further comprising, after placement of said at least one suction body, filling binding material, mainly cement mortar for hardening said granular material into at least one of said suction bodies.
Claim 7
Dependent Claim
24 words
A process as claimed in claim 5 further comprising, prior to said filling step, placing reinforcement, mainly rods or meshes, into said suction bodies.
Claim 8
Dependent Claim
22 words
A process as claimed in claim 5 further comprising, prior to said filling step, placing reinforcement into gaps between said suction bodies.
Claim 9
Dependent Claim
20 words
A process as claimed in claim 1, further comprising using three or more inflatable hoses in said temporary supporting structure.
Claim 10
Dependent Claim
34 words
A process as claimed in claim 1, wherein said making of another trench section is performed after the completion of the making of the first trench-section by repeating steps (a) to (i) in sequence.
Claim 11
Dependent Claim
46 words
A process as claimed in claim 1, further comprising making all trench-sections necessary to cover the traceline of said catchwater drain and stabilizing said trench-sections by said temporary support structure before the deflation and replacement of said hoses with water collecting-aquiferous blocks and suction bodies begins.