US4896498A Expired / Lapsed US ⏱️ 0.0 years remaining

Process for controlling the power output of a combination coal-fired unit with integrated coal gasification and a coal power station operating according to the process

Assignee: Individual
•
Filing: 1988-08-22
•
Granted: 1990-01-30
•
Expires: 2008-08-22
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A coal power station operated using the combined gas turbine-steam turbine process, comprising a gas turbine plant and a steam turbine plant with a steam generator, a furnace and a steam turbine and for which coal is partly gasified in a coal gasification installation, the fuel gas produced is supplied to the gas turbine and the residual coke to the furnace of the steam generator, wherein the control of power output between full load and part load is performed by increasing the proportion of the total power output of the power station provided by the gas turbine plant and the degree of gasification in the coal gasification installation from full load to part load, the amount of fuel gas produced being adjusted according to the power requirement of the gas turbine plant and the proportion of residual coke being reduced according to the power requirement of the steam turbine, while decreasing the amount of coal supplied overall. In this manner a decrease in efficiency at part load can be reduced.

Inventors

  • 👤 Klaus Knizia

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-28 17:23
CPC Classifications
F; F01; F01K; F01K23/00; F01K23/02; F01K23/06; F01K23/067; Y; Y02; Y02E; Y02E20/00; Y02E20/16; Y02E20/18

Claims Analysis

Total Claims: 12
Claim 1
Independent Claim 157 words
A process for controlling the power output of a coal power plant operated using the combined gas turbine-steam turbine process by means of a gas turbine plant and a steam power plant comprising a steam generator with a furnace and a steam turbine, in which coal is partly gasified in a coal gasification installation, the fuel gas produced is supplied to the gas turbine and the residual coke to the furnace of the steam generator, wherein the proportion of the total power output of the power station provided by the gas turbine plant and the degree of gasification in the coal gasification installation are controlled so as to increase from full load to part load, the amount of fuel gas produced being adjusted according to the power requirement of the gas turbine and the proportion of residual coke being reduced according to the power requirements of the steam turbine, while decreasing the amount of coal supplied overall.
Claim 2
Dependent Claim 157 words
A process for controlling the power output of a coal power plant operated using the combined gas turbine-steam turbine process by means of a gas turbine plant and a steam power plant comprising a steam generator with a furnace and a steam turbine, in which coal is partly gasified in a coal gasification installation, the fuel gas produced is supplied to the gas turbine and the residual coke to the furnace of the steam generator, wherein the proportion of the total power output of the power station provided by the gas turbine plant and the degree of gasification in the coal gasification installation are controlled so as to increase from full load to part load, the amount of fuel gas produced being adjusted according to the power requirement of the gas turbine and the proportion of residual coke being reduced according to the power requirements of the steam turbine, while decreasing the amount of coal supplied overall.
Claim 3
Dependent Claim 41 words
A process according to claim 1, wherein between the gas turbine, the furnace of the steam generator and the coal gasification installation there is a heat transfer system whose temperatures can be controlled to increase from full load to part load.
Claim 4
Dependent Claim 55 words
A process according to claim 2, wherein the proportion of the total power output of the power station provided by the gas turbine plant from full load to part load is additionally controlled by increasing the temperature of at least one of the fuel gas supplied to the gas turbine plant and the compressed air.
Claim 5
Dependent Claim 42 words
A process according to claim 2, wherein the degree of gasification in the coal gasification installation is controlled by increasing the temperature of the process air and if necessary by altering the amount of process air supplied to the coal gasification installation.
Claim 6
Dependent Claim 32 words
A process according to claim 1, wherein in the upper load region additional fuel is supplied to the furnace of the steam generator besides the residual coke from the coal gasification installation.
Claim 7
Dependent Claim 31 words
A process according to claim 2, wherein by increasing the temperature of the process air the quality of the gas is held substantially constant as the degree of gasification is increased.
Claim 8
Dependent Claim 39 words
A process according to claim 2, wherein the temperature of the compressed air ahead of the gas turbine combustion chambers is controlled by a recuperator arranged in the gas-turbine exhaust gas line with an adjustable by-pass arranged parallel thereto.
Claim 9
Dependent Claim 50 words
A process according to claim 7, wherein the compressed air of the gas turbine plant is preheated in a two-stage preheating process, heat being supplied in the first stage from the gas turbine exhaust gases and heat being supplied in the second stage from the furnace of the steam generator.
Claim 10
Dependent Claim 28 words
A process according to claim 2, wherein a heat exchange medium that is liquid at a slight overpressure and high temperatures is used in the heat transfer system.
Claim 11
Dependent Claim 36 words
A process according to claim 1, wherein between full load and part load of the power station the gas turbine plant is controlled at substantially constant power output and the steam turbine with decreasing power output.
Claim 12
Dependent Claim 58 words
A process according to claim 1, wherein the gas turbine power plant is divided up into a plurality of units which are run at substantially constant power output and between full load and part load the gas turbine power output is controlled by switching off one or more of the units and the steam turbine power is decreased.

References Cited (Backward Citations)

US3086362A Cited
US3446014A Cited
US3505811A Cited
US3991557A Cited
US4081956A Cited
US4368103A Cited
US4470255A Cited
US4387560A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1993-01-29 1993-07-31 1994-01-30 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1997-01-29 1997-07-31 1998-01-30 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 2001-01-29 2001-07-31 2002-01-30 $7700.00 Window Closed / Lapsed