← Back to Patent Explorer
US4881819A Expired / Lapsed US ⏱️ 0.0 years remaining

Method and apparatus for preparing concrete mortar

Assignee: Deltracon Deventer BV
•
Filing: 1988-01-20
•
Granted: 1989-11-21
•
Expires: 2008-01-20
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract The invention relates to a method and apparatus for preparing concrete mortar. In order to regulate the moisture content of the concrete mortar a sand sample is taken of the sand used. This sand sample is dried. The amount of water added to a concrete charge is regulated subject to the weight difference of the sand sample prior to and after drying.

Inventors

  • 👤 Frederik C. Blees

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-04 14:37
CPC Classifications
B; B28; B28C; B28C7/00; B28C7/04; B28C7/0404; B28C7/0409

Claims Analysis

Total Claims: 9
Claim 1
Independent Claim 173 words
The method of making a batch of concrete mortar from which a useful concrete element may be formed, which comprises the steps of: a. providing a supply of sand which has a variable moisture content, b. providing a supply of binder, c. metering a quantity of the sand to provide a formulated weight of dry sand plus a weight amount of contained water due to the moisture content of the quantity of sand, d. drying a sample of the quantity of sand metered in step c and determining the difference in weight of the sample before and after drying, e. metering a quantity of binder until the quantity of binder equals a formulated weight of binder, f. metering a quantity of water in dependence upon the difference in weight determined in step d until the quantity of water plus the weight amount of contained water of step c equals a formulated weight of water, and g. intensively admixing the formulated weights of steps c-e until a batch of the concrete mortar is formed.
Claim 2
Independent Claim 173 words
The method of making a batch of concrete mortar from which a useful concrete element may be formed, which comprises the steps of: a. providing a supply of sand which has a variable moisture content, b. providing a supply of binder, c. metering a quantity of the sand to provide a formulated weight of dry sand plus a weight amount of contained water due to the moisture content of the quantity of sand, d. drying a sample of the quantity of sand metered in step c and determining the difference in weight of the sample before and after drying, e. metering a quantity of binder until the quantity of binder equals a formulated weight of binder, f. metering a quantity of water in dependence upon the difference in weight determined in step d until the quantity of water plus the weight amount of contained water of step c equals a formulated weight of water, and g. intensively admixing the formulated weights of steps c-e until a batch of the concrete mortar is formed.
Claim 3
Dependent Claim 56 words
The method as defined in claim 27 including the steps of: h. repeating steps c-g to form further batches of concrete mortar, and i. determining the weight difference as in step d for one batch and adjusting the quantity of metered water as in step f for a subsequent batch in dependence upon such weight difference.
Claim 4
Dependent Claim 251 words
Apparatus for making batches of concrete mortar, successive batches each containing a weight of dry sand, a weight of binder and a weight of water in which the weights are in a formulated weight ratio which when intensively mixed produces a concrete mortar from which useful concrete elements may be formed, which comprises: means for providing a supply of sand which has a variable moisture content, means for providing a supply of binder, means for metering a quantity of the sand until the quantity of sand so metered equals the formulated weight of dry sand plus a weight amount of contained water due to the moisture content of the quantity of sand, means for metering a quantity of binder until the quantity of binder equals the formulated weight of binder, means for metering a quantity of water until the quantity of water plus the contained water of step c equals the formulated weight of water, means for sampling the ratio of sand to water, means for determining the quantity of sand and water required to be metered to provide the desired concrete mortar, means for adjusting the quantity of sand and water metered to provide the desired concrete mortar, means for intensively admixing the formulated weights until a batch of the concrete mortar is formed; and wherein said means for sampling the ratio of sand to water includes means for drying a portion of the metered quantity of sand and determining the weight difference of such portion before and after drying.
Claim 5
Dependent Claim 251 words
Apparatus for making batches of concrete mortar, successive batches each containing a weight of dry sand, a weight of binder and a weight of water in which the weights are in a formulated weight ratio which when intensively mixed produces a concrete mortar from which useful concrete elements may be formed, which comprises: means for providing a supply of sand which has a variable moisture content, means for providing a supply of binder, means for metering a quantity of the sand until the quantity of sand so metered equals the formulated weight of dry sand plus a weight amount of contained water due to the moisture content of the quantity of sand, means for metering a quantity of binder until the quantity of binder equals the formulated weight of binder, means for metering a quantity of water until the quantity of water plus the contained water of step c equals the formulated weight of water, means for sampling the ratio of sand to water, means for determining the quantity of sand and water required to be metered to provide the desired concrete mortar, means for adjusting the quantity of sand and water metered to provide the desired concrete mortar, means for intensively admixing the formulated weights until a batch of the concrete mortar is formed; and wherein said means for sampling the ratio of sand to water includes means for drying a portion of the metered quantity of sand and determining the weight difference of such portion before and after drying.
Claim 6
Dependent Claim 34 words
Apparatus as defined in claim 3 wherein said means for sampling the ratio of sand to water includes means for compacting a portion of the concrete mortar and determining the rate of compaction thereof.
Claim 7
Dependent Claim 27 words
Apparatus as defined in claim 4 wherein the means for compacting comprises a weight and a potentiometer having a movable tap to which the weight is connected.
Claim 8
Dependent Claim 17 words
Apparatus as defined in claim 3 in which the means for drying includes a forced air blower.
Claim 9
Dependent Claim 17 words
Apparatus as defined in claim 3 in which the means for drying also includes a microwave device.

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1992-11-20 1993-05-22 1993-11-21 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1996-11-20 1997-05-22 1997-11-21 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 2000-11-20 2001-05-22 2001-11-21 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag