← Back to Patent Explorer
US4845942A Expired / Lapsed US ⏱️ 0.0 years remaining

Combined gas turbine and steam power plant having a fluidized bed furnace for generating electrical energy

Assignee: BROWN BOVERI and CIE
•
Filing: 1987-04-13
•
Granted: 1989-07-11
•
Expires: 2007-04-13
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A combined gas turbine and steam power plant for generating electrical energy includes a combustion chamber for the complete combustion of solid fuels with the aid of a stationary fluidized bed generating steam for the operation of the steam power plant, the combustion chamber having a nozzle bottom, a fuel delivery point above the nozzle bottom, and a wall with at least one opening formed therein for the removal of combustible gas produced from a fuel degasification and gasification zone forming during operation in the fluidized bed in the vicinity of the fuel delivery point, a combustor of the gas turbine plant in which compressed air required for the operation of the gas turbine is heated by combustion of combustible gas, and a combustible gas line connected between the at least one opening and the combustor.

Inventors

  • 👤 Wolfgang Schemenau
  • 👤 Jurgen Bennert
  • 👤 Dietrich Ceelen

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-28 14:24
CPC Classifications
F; F01; F01K; F01K23/00; F01K23/02; F01K23/06; F01K23/061

Claims Analysis

Total Claims: 4
Claim 1
Independent Claim 161 words
Combined gas turbine and steam power plant for generating electrical energy, comprising: a combustion chamber for the complete combustion of solid fuels with the aid of a stationary fluidized bed in said combustion chamber; said combustion chamber having as zone in the fluidized bed forming during operation of the fluidized bed in which combustible gas is produced by gasification or degasification of the solid fuels, means for generating steam for the steam power plant, a nozzle bottom, a fuel delivery point above said nozzle bottom, and a vertical wall with at least one opening formed therein in said zone above said delivery point for the removal of combustible gas; and a combustor of the gas turbine plant in which compressed air required for the operation of the gas turbine is heated, and a combustible gas line connected between said at least one opening and said combustor for supplying combustible gas to be burned in said combustor for heating the compressed air.
Claim 2
Dependent Claim 161 words
Combined gas turbine and steam power plant for generating electrical energy, comprising: a combustion chamber for the complete combustion of solid fuels with the aid of a stationary fluidized bed in said combustion chamber; said combustion chamber having as zone in the fluidized bed forming during operation of the fluidized bed in which combustible gas is produced by gasification or degasification of the solid fuels, means for generating steam for the steam power plant, a nozzle bottom, a fuel delivery point above said nozzle bottom, and a vertical wall with at least one opening formed therein in said zone above said delivery point for the removal of combustible gas; and a combustor of the gas turbine plant in which compressed air required for the operation of the gas turbine is heated, and a combustible gas line connected between said at least one opening and said combustor for supplying combustible gas to be burned in said combustor for heating the compressed air.
Claim 3
Dependent Claim 37 words
Plant according to claim 1, wherein said at least one opening is in the form of a plurality of openings disposed substantially along a horizontal plane and uniformly distributed about the periphery of said combustion chamber wall.
Claim 4
Dependent Claim 39 words
Plant according to claim 1, wherein said fluidized bed has a given vertical thickness, and said at least one opening is vertically spaced from said fuel delivery point by substantially between 1/5 and 1/15 of said given vertical thickness.

References Cited (Backward Citations)

US3446012A Cited
US4253300A Cited
GB2076062A Cited
US4387560A Cited
US4369624A Cited
GB2095762A Cited
US4476674A Cited
DE3428041A1 Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1992-07-10 1993-01-09 1993-07-11 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1996-07-10 1997-01-09 1997-07-11 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 2000-07-10 2001-01-09 2001-07-11 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag