Claims Analysis
Total Claims: 10
Claim 1
Independent Claim
235 words
A control system for a hydronic heating system for an enclosed structure, including a boiler and at least one heating zone delivery control system for controlling delivery of heat from the boiler to said at least one heating zone, comprising: a. first means for sensing the ambient temperature external to the enclosed structure; b. second means for sensing the water temperature of the boiler; and c. control means, including a central digital processing unit having memory therein, coupled to the outputs of said first and second sensing means and being programmed in said digital memory to determine an upper temperature for the boiler at which the boiler is shut off and to store a value in said digital memory indicative of the upper temperature, and to periodically redetermine said upper temperature for the boiler in accordance with the heating demands of the enclosed structure, and to periodically update the value stored in said digital memory indicative of the upper temperature, said control means being programmed to measure the length of time between the boiler being shut off and a request by a thermostat for delivery of heat and is responsive thereto to increase said upper temperature when said measured length of time is below a predetermined time duration, and said control means also being programmed to increase said upper temperature in proportion to the difference between said measured length time and said predetermined time duration.
Claim 2
Dependent Claim
235 words
A control system for a hydronic heating system for an enclosed structure, including a boiler and at least one heating zone delivery control system for controlling delivery of heat from the boiler to said at least one heating zone, comprising: a. first means for sensing the ambient temperature external to the enclosed structure; b. second means for sensing the water temperature of the boiler; and c. control means, including a central digital processing unit having memory therein, coupled to the outputs of said first and second sensing means and being programmed in said digital memory to determine an upper temperature for the boiler at which the boiler is shut off and to store a value in said digital memory indicative of the upper temperature, and to periodically redetermine said upper temperature for the boiler in accordance with the heating demands of the enclosed structure, and to periodically update the value stored in said digital memory indicative of the upper temperature, said control means being programmed to measure the length of time between the boiler being shut off and a request by a thermostat for delivery of heat and is responsive thereto to increase said upper temperature when said measured length of time is below a predetermined time duration, and said control means also being programmed to increase said upper temperature in proportion to the difference between said measured length time and said predetermined time duration.
Claim 3
Dependent Claim
72 words
A control system for a hydronic heating system as claimed in claim 1, wherein the control system includes a plurality of thermostats in different zones of the structure, and said thermostat to which the control means is responsive to increase said upper temperature is selected by said control means from all of the thermostats of the heating system in dependence upon the timing of the heat requests by all of the thermostats.
Claim 4
Dependent Claim
46 words
A control system for a hydronic heating system as claimed in claim 1, wherein said control means is programmed to decrease said upper temperature in response to a thermostat request for delivery of heat being satisfied prior to the boiler water temperature reaching said upper temperature.
Claim 5
Dependent Claim
61 words
A control system for a hydronic heating system as claimed in claim 1 or 3, wherein said control means is programmed to continue the delivery of heat into a heating zone, after a request by a thermostat has been satisfied, for a variable period of time inversely proportional to the measured length of time between requests for heat by that thermostat.
Claim 6
Dependent Claim
78 words
A control system for a hydronic heating system as claimed in claim 1 or 3, wherein said control means is programmed to continue the delivery of heat into a heating zone when not thermostat in the heating system is requesting heat, and said first means for sensing the ambient temperature senses a temperature below a given threshold ambient temperature, and said second means for sensing the boiler water temperature senses a temperature above a given threshold boiler temperature.
Claim 7
Dependent Claim
68 words
A control system for a hydronic heating system as claimed in claim 1 or 3, wherein the control system is retrofitted to an existing heating control system which normally maintains the boiler water temperature in a given temperature range to provide domestic hot tap water, and said control system is programmed to inhibit boiler firing unless a switch is actuated to indicate a requirement for hot tap water.
Claim 8
Dependent Claim
29 words
A control system for a hydronic heating system as claimed in claim 6, wherein said switch is timer actuated during times of normal requirements for domestic hot tap water.
Claim 9
Dependent Claim
46 words
A control system for a hydronic heating system as claimed in claim 1 or 3, wherein the control system is retrofitted to an existing heating control system, and includes an override means for reverting control over the hydronic heating system to the existing heating control system.
Claim 10
Dependent Claim
33 words
A control system for a hydronic system as claimed in claim 1 or 3, wherein said control system is programmed to check said first and second sensing means for short and open circuits.