Claims Analysis
Total Claims: 23
Claim 1
Independent Claim
116 words
A method for welding first and second sheets having a gap between the sheets before welding, comprising the steps of: arranging the sheets so that the first sheet overlaps the second sheet and defines an edge located near the overlap and directed at a large angle relative to the first sheet or second sheet; directing a welding beam at the first sheet toward said edge at a relatively shallow angle with respect to the first sheet in the vicinity of the overlap; locating the focal point of the welding beam on the first sheet; and heating the sheets with the welding beam so that thermal expansion of the sheets reduces the gap and welds the sheets.
Claim 2
Independent Claim
116 words
A method for welding first and second sheets having a gap between the sheets before welding, comprising the steps of: arranging the sheets so that the first sheet overlaps the second sheet and defines an edge located near the overlap and directed at a large angle relative to the first sheet or second sheet; directing a welding beam at the first sheet toward said edge at a relatively shallow angle with respect to the first sheet in the vicinity of the overlap; locating the focal point of the welding beam on the first sheet; and heating the sheets with the welding beam so that thermal expansion of the sheets reduces the gap and welds the sheets.
Claim 3
Dependent Claim
61 words
The method of claim 1 wherein locating the focal point of the welding beam includes locating said focal point between the inner surface of the first sheet and the midthickness of the first sheet and at a distance from said edge so that the weld nugget produced is approximately equal to the wall thickness of the first sheet or second sheet.
Claim 4
Dependent Claim
34 words
The method of claim 1 wherein locating the focal point of the welding beam includes locating said focal point between the inner surface of the first sheet and the midthickness of the first sheet.
Claim 5
Dependent Claim
39 words
The method of claim 1 wherein locating the focal point of the welding beam includes locating said focal point approximately one-half of the distance from the inner surface of the first sheet and the midthickness of the first sheet.
Claim 6
Dependent Claim
31 words
The method of claim 1 further comprising moving the sheets with respect to the welding beam while maintaining the relative positions of the sheets, thereby welding the sheets along a length.
Claim 7
Dependent Claim
34 words
The method of claim 1 further comprising rotating the sheets with respect to the welding beam about an axis while maintaining the relative positions of the sheets, thereby welding the sheets along a length.
Claim 8
Dependent Claim
23 words
The method of claim 1 wherein the welding beam is produced by a welder supplied with electric power in the range 5-15 kilowatts.
Claim 9
Dependent Claim
15 words
The method of claim 1 wherein said shallow angle is in the range 10-45 degrees.
Claim 10
Dependent Claim
75 words
The method of claim 1 wherein the length of the seam is transverse to the edge and the focal point of the welding beam is located on the first sheet a sufficient distance from said edge that the length of a weld nugget produced when viewed in a direction substantially perpendicular to the length of the seam is equal to or greater than the thickness of the first sheet or second sheet at the overlap.
Claim 11
Dependent Claim
13 words
The method of claim 1 wherein the weld is made without filler material.
Claim 12
Dependent Claim
26 words
The method of claim 5 wherein the sheets are moved with respect to the welding beam at a rate in the range 50-80 inches per minute.
Claim 13
Independent Claim
91 words
A method for welding first and second sheets having a gap between the sheets before welding, comprising the steps of: arranging the sheets so that the first sheet overlaps the second sheet; directing a welding beam at the first sheet at a relatively shallow angle with respect to the first sheet in the vicinity of the overlap; locating the focal point of the welding beam on the first sheet; and heating the sheets with the welding beam so that thermal expansion of the sheets reduces the gap and welds the sheets.
Claim 14
Independent Claim
91 words
A method for welding first and second sheets having a gap between the sheets before welding, comprising the steps of: arranging the sheets so that the first sheet overlaps the second sheet; directing a welding beam at the first sheet at a relatively shallow angle with respect to the first sheet in the vicinity of the overlap; locating the focal point of the welding beam on the first sheet; and heating the sheets with the welding beam so that thermal expansion of the sheets reduces the gap and welds the sheets.
Claim 15
Dependent Claim
34 words
The method of claim 12 wherein locating the focal point of the welding beam includes locating said focal point between the inner surface of the first sheet and the midthickness of the first sheet.
Claim 16
Dependent Claim
39 words
The method of claim 12 wherein locating the focal point of the welding beam includes locating said focal point approximately one-half of the distance from the inner surface of the first sheet and the midthickness of the first sheet.
Claim 17
Dependent Claim
31 words
The method of claim 12 further comprising moving the sheets with respect to the welding beam while maintaining the relative positions of the sheets, thereby welding the sheets along a length.
Claim 18
Dependent Claim
34 words
The method of claim 12 further comprising rotating the sheets with respect to the welding beam about an axis while maintaining the relative positions of the sheets, thereby welding the sheets along a length.
Claim 19
Dependent Claim
23 words
The method of claim 12 wherein the welding beam is produced by a welder supplied with electric power in the range 5-15 kilowatts.
Claim 20
Dependent Claim
15 words
The method of claim 12 wherein said shallow angle is in the range 10-45 degrees.
Claim 21
Dependent Claim
69 words
The method of claim 12 wherein the length of the seam is transverse to the edge and the focal point of the welding beam is located on the first sheet and the length of a weld nugget produced when viewed in a direction substantially perpendicular to the length of the seam is equal to or greater than the thickness of the first sheet or second sheet at the overlap.
Claim 22
Dependent Claim
13 words
The method of claim 12 wherein the weld is made without filler material.
Claim 23
Dependent Claim
26 words
The method of claim 15 wherein the sheets are moved with respect to the welding beam at a rate in the range 50-80 inches per minute.