US4832121A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Methods for monitoring temperature-vs-depth characteristics in a borehole during and after hydraulic fracture treatments
Assignee: Columbia University
•
Filing: 1987-10-01
•
Granted: 1989-05-23
•
Expires: 2007-10-01
Abstract
Abstract A method for monitoring in real time the growth of an hydraulic fracture in an earth formation traversed by a well borehole. Growth of the fracture is observed by measuring the temperature of the borehole fluid at selected times during the fracturing process. The temperature measurements are made by use of a string of vertically-spaced temperature sensors extending over the entire fracture depth interval, and a temperature-vs-depth profile of the fracture interval is generated in real time at the surface. Post-fracture temperature monitoring of the fracture zone affords information useful in estimating fracture volume and in well-flow planning and production scheduling.
Inventors
- 👤 Roger N. Anderson
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-10-28 00:21
CPC Classifications
E; E21; E21B; E21B47/00; E21B47/06; E21B47/07; E21B43/00; E21B43/25; E21B43/26; E21B47/10; E21B47/103; E21B49/00
Claims Analysis
Total Claims: 16
Claim 1
Independent Claim
101 words
A method for monitoring the hydraulic fracture of an earth formation traversed by a well borehole, comprising: placing a string of vertically-spaced temperature sensors in the well borehole over a depth interval to be subjected to hydraulic fracturing treatment; producing a fracture in the earth formation surrounding said depth interval by applying hydraulic pressure thereto, whereby the borehole fluid is caused to flow into the formation fracture; and measuring the temperature of the borehole fluid at said vertically-spaced temperature sensors at least at selected times during the fracture-producing step to provide information of the growth of the fracture in real time.
Claim 2
Independent Claim
101 words
A method for monitoring the hydraulic fracture of an earth formation traversed by a well borehole, comprising: placing a string of vertically-spaced temperature sensors in the well borehole over a depth interval to be subjected to hydraulic fracturing treatment; producing a fracture in the earth formation surrounding said depth interval by applying hydraulic pressure thereto, whereby the borehole fluid is caused to flow into the formation fracture; and measuring the temperature of the borehole fluid at said vertically-spaced temperature sensors at least at selected times during the fracture-producing step to provide information of the growth of the fracture in real time.
Claim 3
Dependent Claim
32 words
The method of claim 1 further comprising generating an output of the temperatures measured at said vertically-spaced sensors as a function of the respective depths of said sensors in the well borehole.
Claim 4
Dependent Claim
18 words
The method of claim 2 wherein said temperature-vs-depth output is generated at the well site in real time.
Claim 5
Dependent Claim
22 words
The method of claim 3 further comprising employing said temperature-vs-depth output to control the growth of the fracture during the fracture-producing step.
Claim 6
Dependent Claim
19 words
The method of claim 3 further comprising employing said temperature-vs-depth output in determining when to shut in the well.
Claim 7
Dependent Claim
28 words
The method of claim 3 wherein said output comprises a visual display, whereby the growth of the fracture may be viewed in real time at the well site.
Claim 8
Dependent Claim
15 words
The method of claim 6 wherein said visual display is generated on a CRT display.
Claim 9
Dependent Claim
29 words
The method of claim 1 further comprising recording the temperatures measured at said vertically-spaced sensors as a function of the respective depths of the sensors in the well borehole.
Claim 10
Dependent Claim
31 words
The method of claim 1 wherein said string of vertically-spaced temperature sensors extends both above and below the vertical extent of the depth interval to be subjected to the fracturing process.
Claim 11
Dependent Claim
22 words
The method of claim 1 wherein the vertical spacing between adjacent ones of said temperature sensors is approximately one-half the borehole diameter.
Claim 12
Dependent Claim
20 words
The method of claim 1 further comprising employing said temperature measurements to determine estimates of physical parameters of the fracture.
Claim 13
Dependent Claim
15 words
The method of claim 11 wherein said physical parameters include the height of the fracture.
Claim 14
Dependent Claim
27 words
The method of claim 12 further comprising employing said estimate of fracture height to control the fracture-producing process so as to control the growth of the fracture.
Claim 15
Dependent Claim
23 words
The method of claim 1 wherein said measuring step included making said temperature measurements at selected times after shut in of the well.
Claim 16
Dependent Claim
23 words
The method of claim 14 further comprising employing at least said post shut in temperature measurements to determine an estimate of fracture volume.
References Cited (Backward Citations)
US27459A
Cited
US3363457A
Cited
US3454094A
Cited
US3480079A
Cited
US3745822A
Cited
USRE27459E
Cited
US3709032A
Cited
US3795142A
Cited
US3913398A
Cited
US3954140A
Cited
US4120199A
Cited
US4185691A
Cited
US4109717A
Cited
US4344484A
Cited
US4279299A
Cited
US4393933A
Cited
US4520666A
Cited
SU1211411A1
Cited
US4676664A
Cited
US4559818A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1992-05-22 | 1992-11-21 | 1993-05-23 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1996-05-22 | 1996-11-21 | 1997-05-23 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 2000-05-22 | 2000-11-21 | 2001-05-23 | $7700.00 | Window Closed / Lapsed |