Claims Analysis
Total Claims: 9
Claim 1
Independent Claim
180 words
A method of making a covering wall on a peripheral wall surface of a tunnel extending behind a shield type excavator, said method comprising the steps of preparing a plurality of form assemblies respectively comprising a form segment for use in casting concrete for forming a primary covering wall and a timbering member for reinforcing said primary covering wall, said step of preparing the form assemblies including the step of detachably coupling said form segment to said timbering member; installing a covering-wall form structure, said step of installing the form structure including the step of assembling the covering-wall form structure from said form assemblies with their timbering members opposed to said peripheral tunnel wall surface; casting concrete into a space defined between the peripheral tunnel wall surface and said covering-wall form structure to form the primary covering wall; and removing the form structure after said cast concrete has set, said step of removing the form structure including detaching the form segments from the timbering members but leaving the timbering members installed against the primary covering wall of the set concrete.
Claim 2
Independent Claim
180 words
A method of making a covering wall on a peripheral wall surface of a tunnel extending behind a shield type excavator, said method comprising the steps of preparing a plurality of form assemblies respectively comprising a form segment for use in casting concrete for forming a primary covering wall and a timbering member for reinforcing said primary covering wall, said step of preparing the form assemblies including the step of detachably coupling said form segment to said timbering member; installing a covering-wall form structure, said step of installing the form structure including the step of assembling the covering-wall form structure from said form assemblies with their timbering members opposed to said peripheral tunnel wall surface; casting concrete into a space defined between the peripheral tunnel wall surface and said covering-wall form structure to form the primary covering wall; and removing the form structure after said cast concrete has set, said step of removing the form structure including detaching the form segments from the timbering members but leaving the timbering members installed against the primary covering wall of the set concrete.
Claim 3
Dependent Claim
34 words
A method according to claim 1, wherein said step of casting concrete for forming said primary covering wall comprises a step of projecting anchor bolts held by said timbering member into said cast concrete.
Claim 4
Dependent Claim
72 words
A method according to claim 1, wherein said step of casting concrete into said space between the peripheral tunnel wall surface and said covering-wall form structure includes applying a pressing force in an axial direction away from said excavator through annular end frames disposed at the forward end of the space by means of a plurality of pushing jacks, thereby closely engaging said primary covering wall with the peripheral tunnel wall surface.
Claim 5
Dependent Claim
21 words
The method according to claim 1 further comprising the step of making a secondary covering wall on the primary covering wall.
Claim 6
Dependent Claim
73 words
A method according to claim 1 wherein the step of casting concrete for forming said primary covering wall comprises applying a pressing force in an axial direction away from said excavator by means of a plurality of pressing jacks, thereby closely engaging the primary covering wall with the peripheral tunnel wall surface, and wherein the method further comprises abutting the foremost end of the primary covering-wall form structure with additional excavator-propelling jack plungers.
Claim 7
Independent Claim
280 words
A method of making a covering wall on a peripheral wall surface of a tunnel extending behind a shield type excavator, said method comprising the steps of preliminarily preparing a plurality of arcuate form assemblies respectively comprising an arcuate form segment for use in casting concrete for forming a primary covering wall and an arcuate timbering member for reinforcing said primary covering wall, said step of preliminarily preparing the form assemblies including the step of detachably coupling the form segments to said timbering members so that the outer surfaces of the form segments and the timbering members are flush with each other; installing an annular primary coveringwall form structure, said step of installing the form structure including assembling the annular covering-wall form structure from said form assemblies with said flush outer surfaces of the form segments and timbering members opposed to said peripheral tunnel wall surface; casting concrete into a space defined between the peripheral tunnel wall surface and said flush outer surfaces of said annular primary covering-wall form structure to form the primary covering wall; removing the form structure after said cast concrete has set, said step of removing the form structure including detaching the form segments from the timbering members but leaving the timbering members installed on and against the primary covering wall of the set concrete; and making a secondary covering wall on the primary covering wall, said step of making a secondary covering wall including installing a secondary form structure with respect to the timbering members left on the primary covering wall and feeding wall material between the primary covering wall and the secondary form structure to thereby embed the timbering members in the wall material.
Claim 8
Independent Claim
280 words
A method of making a covering wall on a peripheral wall surface of a tunnel extending behind a shield type excavator, said method comprising the steps of preliminarily preparing a plurality of arcuate form assemblies respectively comprising an arcuate form segment for use in casting concrete for forming a primary covering wall and an arcuate timbering member for reinforcing said primary covering wall, said step of preliminarily preparing the form assemblies including the step of detachably coupling the form segments to said timbering members so that the outer surfaces of the form segments and the timbering members are flush with each other; installing an annular primary coveringwall form structure, said step of installing the form structure including assembling the annular covering-wall form structure from said form assemblies with said flush outer surfaces of the form segments and timbering members opposed to said peripheral tunnel wall surface; casting concrete into a space defined between the peripheral tunnel wall surface and said flush outer surfaces of said annular primary covering-wall form structure to form the primary covering wall; removing the form structure after said cast concrete has set, said step of removing the form structure including detaching the form segments from the timbering members but leaving the timbering members installed on and against the primary covering wall of the set concrete; and making a secondary covering wall on the primary covering wall, said step of making a secondary covering wall including installing a secondary form structure with respect to the timbering members left on the primary covering wall and feeding wall material between the primary covering wall and the secondary form structure to thereby embed the timbering members in the wall material.
Claim 9
Dependent Claim
33 words
A method according to claim 6 wherein the step of casting concrete for forming said primary covering wall comprises projecting radially outwardly into said cast concrete anchor bolts held by said timbering members.