← Back to Patent Explorer
US4793268A Expired / Lapsed US ⏱️ 0.0 years remaining

Method for controlling additive feed in a boiler system

Assignee: Apollo Technologies International Corp
•
Filing: 1987-11-27
•
Granted: 1988-12-27
•
Expires: 2007-11-27
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract The method of operation of a boiler system to which an additive is to be fed at a controlled rate and in which the optimal additive rate depends upon a plurality of changing parameters of the boiler system, in which the relationship between each of those parameters and the optimal additive feed rate is determined, the relevant parameters are sensed during the operation of the system, their effects on optimum additive feed are computed in accordance with said relationships and combined on a continuous basis to produce a control signal representative of the desired rate of additive feed, and controlling the additive feed in accordance therewith, all preferably continuously.

Inventors

  • 👤 Ira Kukin
  • 👤 William C. Pepe

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-02 17:10
CPC Classifications
F; F23; F23N; F23N1/00; F23N1/08; F23N1/082; F23J; F23J7/00; G; G05; G05D; G05D11/00; G05D11/02; G05D11/13; G05D11/131

Claims Analysis

Total Claims: 25
Claim 1
Independent Claim 113 words
A method of controlling the feed of an additive to a fuel-burning boiler system which comprises: (a) detecting a plurality of boiler operational parameter values and converting said values to corresponding boiler parameter signals; (b) converting each of said boiler parameter signals to a control signal in accordance with its own characteristic conversion program; (c) combining each of said control signals in accordance with a predetermined schedule; (d) detecting the existing additive feed and producing a corresponding computed additive feed signal, and (e) comparing said existing additive feed signal and said computed additive feed signal and modifying the additive feed to cause it to conform to said computed additive feed signal if necessary.
Claim 2
Independent Claim 113 words
A method of controlling the feed of an additive to a fuel-burning boiler system which comprises: (a) detecting a plurality of boiler operational parameter values and converting said values to corresponding boiler parameter signals; (b) converting each of said boiler parameter signals to a control signal in accordance with its own characteristic conversion program; (c) combining each of said control signals in accordance with a predetermined schedule; (d) detecting the existing additive feed and producing a corresponding computed additive feed signal, and (e) comparing said existing additive feed signal and said computed additive feed signal and modifying the additive feed to cause it to conform to said computed additive feed signal if necessary.
Claim 3
Dependent Claim 45 words
The method of claim 1, in which some of said boiler parameter signals are converted to corresponding control signals in real time and others of said boiler parameter signals are combined over a predetermined period of time before being converted into a corresponding control signal.
Claim 4
Dependent Claim 65 words
In the method of either of claims 1 or 2, sensing when the boiler system is not operating within a normal range and (a) producing a computed additive feed signal corresponding to that boiler operation without regard to the other boiler parameter signals and (b) maintaining that computed additive feed signal, and causing the additive feed to correspond thereto, for a predetermined period of time.
Claim 5
Independent Claim 22 words
The method of either of claims 1 or 2, in which desired ones of said feed signals are displayed for operator monitoring.
Claim 6
Independent Claim 73 words
The method of either of claims 1 or 2, in which one of said parameters is a sulfur trioxide content parameter which involves separate value determinations by (a) the output of a sulfur trioxide monitor, (b) the output of an acid dew point meter, and (c) a theoretical computation based upon other boiler operational parameters, with the effective SO 3 content signal being produced by combining those three values in a predetermined fashion.
Claim 7
Independent Claim 56 words
The method of either of claims 1 or 2, in which one of said parameters is a sensed load parameter and in which, if the sensed load parameter is at a predetermined level lower than normal, the computed additive feed signal is increased by a predetermined amount before being compared with the existing additive feed signal.
Claim 8
Independent Claim 45 words
The method of either of claims 1 or 2, in which said predetermined schedule for combining each of said control signals to produce said computed additive feed signal includes using as factors heat value, fuel flow, an excess air-fuel flow factor and SO 3 content.
Claim 9
Independent Claim 63 words
The method of either of claims 1 or 2, in which said predetermined schedule for combining each of said control signals to produce said computed additive feed signal includes using as factors heat value, fuel flow, an excess air-fuel flow factor and SO 3 content and using as an additive a factor reflecting the degree of use of generated steam for pre-heating purposes.
Claim 10
Independent Claim 69 words
The method of either of claims 1 or 2, in which a plurality-of different additives are involved with each additive having its own set of characteristic programs for converting boiler parameter signals to corresponding control signals and each has its own predetermined schedule for combining its respective control signals to produce its own computed additive feed signal, with the feed of each additive being individually controlled in accordance therewith.
Claim 11
Independent Claim 37 words
The method of either of claims 1 or 2, in which additive is fed simultaneously to a plurality of different boiler systems, the method of the parent claim being carried out individually for each such boiler system.
Claim 12
Independent Claim 140 words
A method of controlling the feed of an additive to a fuel-burning boiler system which comprises: (a) detecting a plurality of boiler operational parameter values, said parameters being members of the group consisting of load, fuel feed, amount and temperature of combustion air, sulfur trioxide content, exit gas temperature and effluent opacity, and converting said values to corresponding boiler parameter signals; (b) converting each of said boiler parameter signals to a control signal in accordance with its own characteristic conversion program; (c) combining each of said control signals in accordance with a predetermined schedule; (d) detecting the existing additive feed and producing a corresponding computed additive feed signal, and (e) comparing said existing additive feed signal and said computed additive feed signal and modifying the additive feed to cause it to conform to said computed additive feed signal if necessary.
Claim 13
Independent Claim 140 words
A method of controlling the feed of an additive to a fuel-burning boiler system which comprises: (a) detecting a plurality of boiler operational parameter values, said parameters being members of the group consisting of load, fuel feed, amount and temperature of combustion air, sulfur trioxide content, exit gas temperature and effluent opacity, and converting said values to corresponding boiler parameter signals; (b) converting each of said boiler parameter signals to a control signal in accordance with its own characteristic conversion program; (c) combining each of said control signals in accordance with a predetermined schedule; (d) detecting the existing additive feed and producing a corresponding computed additive feed signal, and (e) comparing said existing additive feed signal and said computed additive feed signal and modifying the additive feed to cause it to conform to said computed additive feed signal if necessary.
Claim 14
Dependent Claim 45 words
The method of claim 11, in which some of said boiler parameter signals are converted to corresponding control signals in real time and others of said boiler parameter signals are combined over a predetermined period of time before being converted into a corresponding control signal.
Claim 15
Dependent Claim 65 words
In the method of either of claims 11 or 12, sensing when the boiler system is not operating within a normal range and (a) producing a computed additive feed signal corresponding to that boiler. operation without regard to the other boiler parameter signals and (b) maintaining that computed additive feed signal, and causing the additive feed to correspond thereto, for a predetermined period of time.
Claim 16
Independent Claim 22 words
The method of either of claims 11 or 12, in which desired ones of said feed signals are displayed for operator monitoring.
Claim 17
Independent Claim 67 words
The method of either of claims 11 or 12, in which the sulfur trioxide content parameter involves separate value determinations by (a) the output of a sulfur trioxide monitor, (b) the output of an acid dew point meter, and (c) a theoretical computation based upon other boiler operational parameters, with the effective SO 3 content signal being produced by combining those three values in a predetermined fashion.
Claim 18
Independent Claim 44 words
The method of either of claims 11 or 12, in which, if the sensed load parameter is at a predetermined level lower than normal, the computed additive feed signal is increased by a predetermined amount before being compared with the existing additive feed signal.
Claim 19
Dependent Claim 61 words
In the method of claim 16, sensing when the boiler system is not operating within a normal range and (a) producing a computed additive feed signal corresponding to that boiler operation without regard to the other boiler parameter signals and (b) maintaining that computed additive feed signal, and causing the additive feed to correspond thereto, for a predetermined period of time.
Claim 20
Dependent Claim 63 words
The method of claim 16, in which the sulfur trioxide content parameter involves separate value determinations by (a) the output of a sulfur trioxide monitor, (b) the output of an acid dew point meter, and (c) a theoretical computation based upon other boiler operational parameters, with the effective SO 3 content signal being produced by combining those three values in a predetermined fashion.
Claim 21
Dependent Claim 41 words
The method of claim 16, in which said predetermined schedule for combining each of said control signals to produce said computed additive feed signal includes using as factors heat value, fuel flow, an excess air-fuel flow factor and SO 3 content.
Claim 22
Independent Claim 45 words
The method of either of claims 11 or 2, in which said predetermined schedule for combining each of said control signals to produce said computed additive feed signal includes using as factors heat value, fuel flow, an excess air-fuel flow factor and SO 3 content
Claim 23
Independent Claim 63 words
The method of either of claims 11 or 12, in which said predetermined schedule for combining each of said control signals to produce said computed additive feed signal includes using as factors heat value, fuel flow, an excess air-fuel flow factor and SO 3 content and using as an additive a factor reflecting the degree of use of generated steam for pre-heating purposes.
Claim 24
Independent Claim 70 words
The method of either of claims 11 or 12, in which a plurality of different additives are involved with each additive having its own set of characteristic programs for converting boiler parameter signals to corresponding control signals and each has its own predetermined schedule for combining its respective control signals to produce its own computed additive feed signal, with the feed of each additive being individually controlled in accordance therewith.
Claim 25
Independent Claim 37 words
The method of either of claims 11 or 12, in which additive is fed simultaneously to a plurality of different boiler systems, the method of the parent claim being carried out individually for each such boiler system.

References Cited (Backward Citations)

US3837820A Cited
US4685072A Cited
US4515092A Cited
US4648331A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1991-12-27 1992-06-27 1992-12-27 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1995-12-27 1996-06-27 1996-12-27 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1999-12-27 2000-06-27 2000-12-27 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag