← Back to Patent Explorer
US4785405A Expired / Lapsed US ⏱️ 0.0 years remaining

Power system stabilizer

Assignee: Chubu Electric Power Co Inc
•
Filing: 1987-01-05
•
Granted: 1988-11-15
•
Expires: 2007-01-05
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract The power system stabilizer is provided at an individual power system to be separated due to an accident cutting off a link line which interconnects a number of power systems to form a large-scale power system. The power systems include power stations such as power plants and transformer substations. A simplified arithmetic processing unit of the stabilizer performs an arithmetic processing by a simple linear equation using an output frequency of a representative power station belonging to the separated power system immediately after the accident has been cleared, so that a total load drop of the separated power system can be assumed. Based on the assumption amount, balance control of demand and supply in the separated system is made.

Inventors

  • 👤 Taizo Hasegawa
  • 👤 Hirotaka Ono
  • 👤 Isao Koda
  • 👤 Tadahiro Gouda
  • 👤 Hideharu Oshida
  • 👤 Toshiharu Narita

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-08 15:43
CPC Classifications
H; H02; H02J; H02J3/00; H02J3/12; H02J3/14; H02J2105/00; H02J2105/50; H02J2105/52; Y; Y02; Y02B; Y02B70/00; Y02B70/30; Y02B70/3225; Y04; Y04S; Y04S20/00; Y04S20/20; Y04S20/222

Claims Analysis

Total Claims: 7
Claim 1
Independent Claim 162 words
A power system stabilizer provided at an individual power system which is to be separated (a separated system) due to an accident cutting off a link line which interconnects a plurality of individual power systems to form a large-scale power system (main system), said plurality of individual power systems including power stations such as power plants, transformer substations and loads, the power system stabilizer comprising: arithmetic processing means for assuming a total load-drop amount of the separated system caused by a voltage drop during said accident by an arithmetic operation based on a difference between a frequency in a representative power station belonging to said separated system and a frequency at a constant time after the frequency in said representative power station has exceeded a prescribed value; and control means for controlling a balance in demand and supply at each power station in said separated system on the basis of an assumption amount obtained by said operation of the arithmetic processing means.
Claim 2
Dependent Claim 162 words
A power system stabilizer provided at an individual power system which is to be separated (a separated system) due to an accident cutting off a link line which interconnects a plurality of individual power systems to form a large-scale power system (main system), said plurality of individual power systems including power stations such as power plants, transformer substations and loads, the power system stabilizer comprising: arithmetic processing means for assuming a total load-drop amount of the separated system caused by a voltage drop during said accident by an arithmetic operation based on a difference between a frequency in a representative power station belonging to said separated system and a frequency at a constant time after the frequency in said representative power station has exceeded a prescribed value; and control means for controlling a balance in demand and supply at each power station in said separated system on the basis of an assumption amount obtained by said operation of the arithmetic processing means.
Claim 3
Dependent Claim 213 words
A power system stabilizer as claimed in claim 1 wherein said arithmetic processing means performs an arithmetic processing of a load drop Pdrop of the separated system for an amount R u obtained by normalizing a capacity of the separated system when P G10 /M 1 is constant, wherein 66 f is a frequency deviation in said separated system; Δf p is a frequency deviation in the system in t r seconds after the frequency deviation Δf has exceeded a prescribed value Δf r , said arithmetic processing being made based on the following equation: ##EQU9## where: R u ; an amount obtained by normalizing a demand-supply unbalance component in the separated system after the generation of separation (cutting-off accident) by the separated system; K G ; a frequency characteristic constant of a generation force; K L ; a frequency characteristic constant of a load; Mhd 1; a characteristic constant of a generator placed out of control; A, B; constants; P G10 ; a mechanical input of the generator placed out of control at a first stage before a state change; P G20 ; a mechanical input of the generator to be controlled at the first stage; P T ; a tidal current of effective power; f b ; a system reference frequency.
Claim 4
Dependent Claim 24 words
A power system stabilizer as claimed in claim 1, wherein said arithmetic processing means is composed of an arithmetic processing unit employing a microprocessor.
Claim 5
Dependent Claim 67 words
A power system stabilizer as claimed in claim 1, wherein said control means controls to maintain a balance between a supply side and a demand side by producing a control signal to a breaker for breaking an electrical connection of the individual power stations provided in said separated system with the main system on the basis of an arithmetic operation result produced from said arithmetic processing means.
Claim 6
Dependent Claim 37 words
A power system stabilizer as claimed in claim 4, wherein said control means provides an output signal to a generator provided in said separated system and a breaker for breaking an electrical connection with said main system.
Claim 7
Dependent Claim 38 words
A power system stabilizer as claimed in claim 4, wherein said control means provides said control signal to various loads provided in said separated system and a feeder breaker for breaking an electrical connection with the separated system.

References Cited (Backward Citations)

US4080559A Cited
US4214289A Cited
US4311253A Cited
US4410950A Cited
US4410848A Cited
US4463306A Cited
US4663539A Cited
US4701689A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1991-11-15 1992-05-16 1992-11-15 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1995-11-15 1996-05-16 1996-11-15 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1999-11-15 2000-05-16 2000-11-15 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag