← Back to Patent Explorer
US4779200A Expired / Lapsed US ⏱️ 0.0 years remaining

Method for estimating porosity and/or permeability

Assignee: Schlumberger Technology Corp
•
Filing: 1985-07-16
•
Granted: 1988-10-18
•
Expires: 2005-07-16
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract In a drill stem test, a packer is set in the well bore to isolate a potential producing zone. A drill pipe with a down hole valve is fitted through the packer. The pipe is usually partially filled with a liquid column prior to commencement of the test, which essentially comprises opening the valve so that formation fluids can flow into the drill pipe and measuring various parameters associated with the fluid transfer. A method for estimating porosity and/or permeability includes the steps of setting up such a drill stem test wherein flow of formation fluid to a drill pipe may be controlled by a down hole valve, opening the valve to establish a flow, recording flow parameters, and analyzing oscillatory transients in the flow to compute therefrom estimates of porosity and permeability.

Inventors

  • 👤 Leslie J. S. Bradbury
  • 👤 David B. White

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-31 12:21
CPC Classifications
E; E21; E21B; E21B49/00; E21B49/008

Claims Analysis

Total Claims: 20
Claim 1
Independent Claim 120 words
A method for investigating the oil producing potential of a subsurface formation zone surrounding a well bore, said method comprising the steps of: (a) installing in proximity to said subsurface formation zone, drill stem test equipment capable of controlling the flow of formation fluid out of the formation zone; (b) establishing by the operation of said drill stem test equipment, a downhole flow condition in which formation fluids flow out of the formation zone while exhibiting an initial, naturally damped oscillatory behavior dependent on characteristics of said formation; (c) detecting a time varying characteristic of said initial, naturally damped oscillatory behavior and generating a signal indicative thereof; and (d) in response to said signal, determining a characteristic of said formation.
Claim 2
Independent Claim 120 words
A method for investigating the oil producing potential of a subsurface formation zone surrounding a well bore, said method comprising the steps of: (a) installing in proximity to said subsurface formation zone, drill stem test equipment capable of controlling the flow of formation fluid out of the formation zone; (b) establishing by the operation of said drill stem test equipment, a downhole flow condition in which formation fluids flow out of the formation zone while exhibiting an initial, naturally damped oscillatory behavior dependent on characteristics of said formation; (c) detecting a time varying characteristic of said initial, naturally damped oscillatory behavior and generating a signal indicative thereof; and (d) in response to said signal, determining a characteristic of said formation.
Claim 3
Dependent Claim 24 words
A method as claimed in claim 1, wherein said characteristic of said formation is the product of porosity and the permeability of the formation.
Claim 4
Dependent Claim 23 words
A method as claimed in claim 2, wherein said determining step includes determining the frequency of oscillation of said naturally damped oscillatory behavior.
Claim 5
Dependent Claim 30 words
A method as claimed in claim 3, wherein the permeability-porosity product is estimated from the formula ##EQU7## where n, n o , ε, k and φ are as hereinbefore defined.
Claim 6
Dependent Claim 21 words
A method as claimed in claim 2, wherein said determining step includes determining the damping of said naturally damped oscillatory behavior.
Claim 7
Dependent Claim 26 words
A method as claimed in claim 5, wherein the permeability-porosity product is estimated from the formula ##EQU8## where c, k and φ are as hereinbefore defined.
Claim 8
Dependent Claim 14 words
A method as claimed in claim 1, wherein said detecting step includes measuring pressure.
Claim 9
Dependent Claim 15 words
A method as claimed in claim 1, wherein said determining step includes measuring flow velocity.
Claim 10
Dependent Claim 22 words
A method as claimed in claim 8, wherein said computing step comprises determining the peak oscillatory flow velocity and estimating porosity therefrom.
Claim 11
Dependent Claim 39 words
A method as claimed in claim 9, wherein porosity is estimated from the formula ##EQU9## where V osc , p i , ρ, g, L o , A, r w , h, φ and c are as hereinbefore defined.
Claim 12
Dependent Claim 27 words
A method as claimed in claim 8, wherein said determining step further comprises determining the peak non-oscillatory flow velocity and estimating the permeability of the formation therefrom.
Claim 13
Dependent Claim 36 words
A method as claimed in claim 11, wherein permeability is estimated from the formula ##EQU10## where V s , k, μ, p i , ρ, g, L o , A and h are as hereinbefore defined.
Claim 14
Dependent Claim 16 words
The method as claimed in claim 1 wherein said characteristic of said formation relates to permeability.
Claim 15
Dependent Claim 19 words
A method as claimed in claim 13, wherein said determining step includes determining the frequency of said oscillatory transients.
Claim 16
Dependent Claim 19 words
A method as claimed in claim 13, wherein said determining step includes determining the damping of said oscillatory transient.
Claim 17
Dependent Claim 14 words
A method as claimed in claim 13, wherein said detecting step includes measuring pressure.
Claim 18
Dependent Claim 15 words
A method as claimed in claim 13, wherein said detecting step includes measuring flow velocity.
Claim 19
Dependent Claim 22 words
A method as claimed in claim 17, wherein said determining step comprises determining the peak non-oscillatory flow velocity and estimating permeability therefrom.
Claim 20
Dependent Claim 36 words
A method as claimed in claim 18, wherein permeability is estimated from the formula ##EQU11## where V s , k, μ, p i , ρ, g, L o , A and h are as hereinbefore defined.

References Cited (Backward Citations)

US2189919A Cited
US3285064A Cited
US3604256A Cited
US3559476A Cited
US3586105A Cited
US4348897A Cited
US4328705A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1991-10-18 1992-04-18 1992-10-18 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1995-10-18 1996-04-18 1996-10-18 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1999-10-18 2000-04-18 2000-10-18 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag