← Back to Patent Explorer
US4773523A Expired / Lapsed US ⏱️ 0.0 years remaining

Method for automated handling of materials such as automotive parts and system utilizing same

Assignee: Fanuc Robotics North America Inc
•
Filing: 1986-05-14
•
Granted: 1988-09-27
•
Expires: 2006-05-14
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A method and apparatus are disclosed for the automated loading of parts wherein multiple gantry robots are utilized to pick up automotive parts from movable transfer beds and placed into predetermined positions in containers which are serially indexed through the work envelopes of the robots until the containers are full. In the disclosed embodiment, the method and system are utilized for racking automotive parts after they exit a sheet metal stamping machine. Preferably, empty containers are automatically delivered to a container queue such as by an automatic guided vehicle system (AGVS) at an unloading station adjacent the robots. Thereafter each AGV is moved to a loading station to receive and retain thereon containers loaded with parts by the gantry robots.

Inventors

  • 👤 Robert E. Hansen, Jr.
  • 👤 Dennis J. Kosovec
  • 👤 Stephen G. LaMarre
  • 👤 Malcolm S. Mills

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-31 05:02
CPC Classifications
G; G05; G05B; G05B19/00; G05B19/02; G05B19/418; G05B19/41815; G05B19/4182; Y; Y02; Y02P; Y02P90/00; Y02P90/02; Y02P90/60

Claims Analysis

Total Claims: 17
Claim 1
Independent Claim 260 words
A method for the automated loading of parts, the method utilizing a robot system including first and second program-controlled robots, each robot having an arm provided with a gripper movable about three control axes and adapted to pick up one of the parts, the method comprising the steps of: (a) indexing a container adapted to receive and retain a plurality of parts therein into a first work envelope of the first robot; (b) conveying at least one part to be loaded into the first work envelope; (c) moving the gripper of the first robot about its three control axes to different positions along a first path to pick up and place the one part in a predetermined position in the container in the first work envelope; (d) indexing the container from the first work envelope into a second work envelope of the second robot; (e) iterating steps (a) through (c) with another container; (f) conveying at least one other part to be loaded through the first work envelope and into the second work envelope; (g) moving the gripper of the second robot about its three control axes to different positions along a second path to pick up and place the one other part in a second predetermined position in the container in the second work envelope; (h) moving the container out of the second work envelope; (i) iterating steps (d) and (f) through (h); and (j) iterating steps (a) through (i) until all of the parts are loaded and the last container is moved out of the second work envelope.
Claim 2
Independent Claim 260 words
A method for the automated loading of parts, the method utilizing a robot system including first and second program-controlled robots, each robot having an arm provided with a gripper movable about three control axes and adapted to pick up one of the parts, the method comprising the steps of: (a) indexing a container adapted to receive and retain a plurality of parts therein into a first work envelope of the first robot; (b) conveying at least one part to be loaded into the first work envelope; (c) moving the gripper of the first robot about its three control axes to different positions along a first path to pick up and place the one part in a predetermined position in the container in the first work envelope; (d) indexing the container from the first work envelope into a second work envelope of the second robot; (e) iterating steps (a) through (c) with another container; (f) conveying at least one other part to be loaded through the first work envelope and into the second work envelope; (g) moving the gripper of the second robot about its three control axes to different positions along a second path to pick up and place the one other part in a second predetermined position in the container in the second work envelope; (h) moving the container out of the second work envelope; (i) iterating steps (d) and (f) through (h); and (j) iterating steps (a) through (i) until all of the parts are loaded and the last container is moved out of the second work envelope.
Claim 3
Dependent Claim 24 words
The method of claim 1 wherein steps (c) and (g) are performed substantially simultaneously when the containers are positioned within their respective work envelopes.
Claim 4
Dependent Claim 14 words
The method of claim 1 wherein steps (a) and (d) are performed substantially simultaneously.
Claim 5
Dependent Claim 75 words
The method of claim 1 further comprising the steps of: (k) indexing the container from the second work envelope into a third work envelope of a third robot having a gripper; (l) conveying at least one more part into the third work envelope; and (m) controlling the third robot so that the third robot picks up and places the one more part in a third predetermined position in the container in the third work envelope.
Claim 6
Dependent Claim 19 words
The method of claim 4 wherein the one more part is conveyed through the first and second work envelopes.
Claim 7
Dependent Claim 28 words
The method of claim 4 or claim 5 wherein steps (c), (g) and (m) are performed substantially simultaneously when the containers are positioned within their respective work envelopes.
Claim 8
Dependent Claim 15 words
The method of claim 4 wherein steps (a), (d) and (k) are performed substantially simultaneously.
Claim 9
Dependent Claim 20 words
The method of claim 1 or claim 5 further comprising the step of queuing the containers in a single queue.
Claim 10
Independent Claim 212 words
A system for automatically loading parts into at least two containers, the system comprising: first and second program-controlled robots, each of said robots having an arm provided with a gripper movable about three control axes and adapted to pick up one of the parts, wherein said robots are capable of working within their respective first and second work envelopes; indexing means for indexing the first container into the first work envelope and subsequently serially indexing the first and second containers into the second and first work envelopes respectively; conveying means for serially conveying parts to be loaded into the first and second work envelopes wherein said conveying means extends through said first work envelope and into said second work envelope to convey parts through said first work envelope and into said second work envelope; first and second robot controllers for controlling their respective robots to move their respective grippers about the three control axes to different positions along a path to pick up and place the parts in respective first and second predetermined positions in the containers when the containers are positioned with their respective work envelopes; and control means coupled to said indexing and conveying means and to said controllers for controlling the flow of containers and parts in the system.
Claim 11
Independent Claim 212 words
A system for automatically loading parts into at least two containers, the system comprising: first and second program-controlled robots, each of said robots having an arm provided with a gripper movable about three control axes and adapted to pick up one of the parts, wherein said robots are capable of working within their respective first and second work envelopes; indexing means for indexing the first container into the first work envelope and subsequently serially indexing the first and second containers into the second and first work envelopes respectively; conveying means for serially conveying parts to be loaded into the first and second work envelopes wherein said conveying means extends through said first work envelope and into said second work envelope to convey parts through said first work envelope and into said second work envelope; first and second robot controllers for controlling their respective robots to move their respective grippers about the three control axes to different positions along a path to pick up and place the parts in respective first and second predetermined positions in the containers when the containers are positioned with their respective work envelopes; and control means coupled to said indexing and conveying means and to said controllers for controlling the flow of containers and parts in the system.
Claim 12
Dependent Claim 106 words
The system as claimed in claim 9 wherein the system automatically loads parts into at least three containers, the system further comprising: a third robot having a gripper and capable of working within a third work envelope; and a third robot controller for controlling the third robot, wherein said indexing means indexes the containers into the third work envelope from the second work envelope and wherein said conveying means conveys parts to be loaded into the third work envelope, said third robot controller controlling the third robot so that the third robot sequentially picks up and places the parts into third predetermined positions in the containers.
Claim 13
Dependent Claim 30 words
The system as claimed in claim 10 or claim 10 further comprising queuing means for queuing the containers in a queue, said indexing means indexing the containers in said queue.
Claim 14
Dependent Claim 35 words
The system as claimed in claim 10 or claim 9 wherein each of said robots comprises a gantry robot, and wherein said system further includes means for mounting said gantry robots in an overhead fashion.
Claim 15
Dependent Claim 28 words
The system as claimed in claim 10 or claim 9 wherein each of said grippers comprises a vacuum gripper connected to the distal end of its robot arm.
Claim 16
Dependent Claim 31 words
The system as claimed in claim 10 or claim 9 wherein said control means includes a host computer for coordinating operation of said indexing and conveyor means and said robot controllers.
Claim 17
Dependent Claim 34 words
The system as claimed in claim 11 further comprising a plurality of automatic guided vehicles coupled to said control means for providing empty containers to said queuing means and for receiving loaded containers therefrom.

References Cited (Backward Citations)

US4068766A Cited
US4341298A Cited
US4566837A Cited
US4626165A Cited
US4684312A Cited
US4623296A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1991-09-27 1992-03-28 1992-09-27 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1995-09-27 1996-03-28 1996-09-27 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1999-09-27 2000-03-28 2000-09-27 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag