Abstract

Abstract This invention relates to a method of predicting the long-term dose rates from radioactive material on the interior, wetted surfaces of the primary coolant piping of nuclear power reactors. The electrochemical potential of the cooling water of a nuclear power plant is measured over a short-term period with an electrochemical potential measuring device that has an unprefilmed measuring electrode. The results of these electrochemical potential measurements are divided by the result at a prescribed short period of exposure, and these normalized electrochemical potential fractions are plotted versus the logarithm of time. The negative of the slope of the straight line through the plotted data is divided into the measured average Co-60 concentration in the cooling water, and a standard curve of long-term dose rate versus this parameter is used to predict the eventual long-term radiation build-up performance of the nuclear power plant in which the electrochemical potential measurements are made.

Inventors

  • 👤 Larry D. Anstine

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-01 04:57
CPC Classifications
G; G21; G21C; G21C17/00; G21C17/02; G21C17/022; Y; Y02; Y02E; Y02E30/00; Y02E30/30

Claims Analysis

Total Claims: 10
Claim 1
Independent Claim 211 words
The method of determining the long-term radiation levels of a water-cooled nuclear reactor cooling system, comprising the steps of: (a) Inserting a dual-electrode electrochemical potential measuring device, including an unprefilmed measuring electrode and a secondary standard electrode, into a continuously flowing sample line from any selected point in the plant cooling system; (b) Wherein said electrochemical potential measuring device utilizes at least one unprefilmed measuring electrode fabricated from the same metal as the cooling system; (c) Collecting electrochemical potential data beginning immediately after the electrode insertion and continuing over a predetermined measurement period; (d) Determining the normalized electrochemical potential fractions by dividing each electrochemical potential measurement result by the measured or interpolated electrochemical potential after a prescribed short exposure period; (e) Determining the slope of the straight line through the data points created by plotting the normalized electrochemical potential fractions versus the logarithm of time in hours; (f) Dividing the average of the measured values of the Co-60 concentration in the cooling water by the slope determined in step e; and (g) Determining the expected long-term dose rate by using the standard curve of the type shown in FIG. 11 prepared from the data in the prior art and prepared using the said prescribed short exposure period used in step d.
Claim 2
Independent Claim 211 words
The method of determining the long-term radiation levels of a water-cooled nuclear reactor cooling system, comprising the steps of: (a) Inserting a dual-electrode electrochemical potential measuring device, including an unprefilmed measuring electrode and a secondary standard electrode, into a continuously flowing sample line from any selected point in the plant cooling system; (b) Wherein said electrochemical potential measuring device utilizes at least one unprefilmed measuring electrode fabricated from the same metal as the cooling system; (c) Collecting electrochemical potential data beginning immediately after the electrode insertion and continuing over a predetermined measurement period; (d) Determining the normalized electrochemical potential fractions by dividing each electrochemical potential measurement result by the measured or interpolated electrochemical potential after a prescribed short exposure period; (e) Determining the slope of the straight line through the data points created by plotting the normalized electrochemical potential fractions versus the logarithm of time in hours; (f) Dividing the average of the measured values of the Co-60 concentration in the cooling water by the slope determined in step e; and (g) Determining the expected long-term dose rate by using the standard curve of the type shown in FIG. 11 prepared from the data in the prior art and prepared using the said prescribed short exposure period used in step d.
Claim 3
Independent Claim 232 words
The method of determining the effects due to controlled or uncontrolled changes that may have occurred in the water chemistry of a nuclear reactor on the long-term radiation levels from the cooling system of that reactor, comprising the steps of: (a) Inserting a dual-electrode electrochemical potential measuring device, including an unprefilmed measuring electrode and a secondary standard electrode, into a continuously flowing sample line from any selected point in the plant cooling system; (b) Wherein said electrochemical potential measuring device utilizes at least one unprefilmed measuring electrode fabricated from the same metal as the cooling system; (c) Collecting electrochemical potential data beginning immediately after the electrode insertion and continuing over a predetermined measurement period; (d) Determining the normalized electrochemical potential fractions by dividing each electrochemical potential measurement result by the measured or interpolated electrochemical potential after a prescribed short exposure period; (e) Determining the slope of the straight line through the data points created by plotting the normalized electrochemical potential fractions versus the logarithm of time in hours; (f) Dividing the average of the measured values of the Co-60 concentration in the cooling water by the slope determined in step e; and (g) Determining the expected long-term dose rate by using the standard curve of the type shown in FIG. 11 prepared from the data in the prior art and prepared using the said prescribed short exposure period used in step d.
Claim 4
Independent Claim 232 words
The method of determining the effects due to controlled or uncontrolled changes that may have occurred in the water chemistry of a nuclear reactor on the long-term radiation levels from the cooling system of that reactor, comprising the steps of: (a) Inserting a dual-electrode electrochemical potential measuring device, including an unprefilmed measuring electrode and a secondary standard electrode, into a continuously flowing sample line from any selected point in the plant cooling system; (b) Wherein said electrochemical potential measuring device utilizes at least one unprefilmed measuring electrode fabricated from the same metal as the cooling system; (c) Collecting electrochemical potential data beginning immediately after the electrode insertion and continuing over a predetermined measurement period; (d) Determining the normalized electrochemical potential fractions by dividing each electrochemical potential measurement result by the measured or interpolated electrochemical potential after a prescribed short exposure period; (e) Determining the slope of the straight line through the data points created by plotting the normalized electrochemical potential fractions versus the logarithm of time in hours; (f) Dividing the average of the measured values of the Co-60 concentration in the cooling water by the slope determined in step e; and (g) Determining the expected long-term dose rate by using the standard curve of the type shown in FIG. 11 prepared from the data in the prior art and prepared using the said prescribed short exposure period used in step d.
Claim 5
Independent Claim 239 words
The method of determining the effects due to proposed changes in water chemistry and reactor-operational parameters on the long-term radiation levels from a water-cooled nuclear reactor cooling system, comprising the steps of: (a) Changing temporarily the water chemistry and reactor operational parameters to reflect the proposed changes; (b) Inserting as dual-electrode electrochemical potential measuring device, including an unprefilmed measuring electrode and a secondary standard electrode, into a continuously flowing sample line from any selected point in the plant cooling system; (c) Wherein said electrochemical potential measuring device utilizes at least one unprefilmed measuring electrode fabricated from the same metal as the cooling system; (d) Collecting electrochemical potential data beginning immediately after the electrode insertion and continuing over a predetermined measurement period; (e) Determining the normalized electrochemical potential fractions by dividing each electrochemical potential measurement result by the measured or interpolated electrochemical potential after a prescribed short exposure period; (f) Determining the slope of the straight line through the data points created by plotting the normalized electrochemical potential fractions versus the logarithm of time in hours; (g) Dividing the average of the measured values of the Co-60 concentration in the cooling water by the slope determined in step f; and (h) Determining the expected long-term dose rate by using the standard curve of the type shown in FIG. 11 prepared from the data in the prior art and prepared using the said prescribed short exposure period used in step e.
Claim 6
Independent Claim 239 words
The method of determining the effects due to proposed changes in water chemistry and reactor-operational parameters on the long-term radiation levels from a water-cooled nuclear reactor cooling system, comprising the steps of: (a) Changing temporarily the water chemistry and reactor operational parameters to reflect the proposed changes; (b) Inserting as dual-electrode electrochemical potential measuring device, including an unprefilmed measuring electrode and a secondary standard electrode, into a continuously flowing sample line from any selected point in the plant cooling system; (c) Wherein said electrochemical potential measuring device utilizes at least one unprefilmed measuring electrode fabricated from the same metal as the cooling system; (d) Collecting electrochemical potential data beginning immediately after the electrode insertion and continuing over a predetermined measurement period; (e) Determining the normalized electrochemical potential fractions by dividing each electrochemical potential measurement result by the measured or interpolated electrochemical potential after a prescribed short exposure period; (f) Determining the slope of the straight line through the data points created by plotting the normalized electrochemical potential fractions versus the logarithm of time in hours; (g) Dividing the average of the measured values of the Co-60 concentration in the cooling water by the slope determined in step f; and (h) Determining the expected long-term dose rate by using the standard curve of the type shown in FIG. 11 prepared from the data in the prior art and prepared using the said prescribed short exposure period used in step e.
Claim 7
Dependent Claim 26 words
The methods of claims 1, 2, or 3 where the nuclear reactor uses a direct-cycle cooling system with neutral-pH water such as a boiling water reactor.
Claim 8
Dependent Claim 28 words
The methods of claims 1, 2, 3, or 4 where the nuclear reactor cooling system is fabricated from type-304 stainless steel, type-316 stainless steel, or low-alloy carbon steel.
Claim 9
Dependent Claim 28 words
The methods of claims 1, 2, 3, 4, or 5 where the sample line comes from the recirculation system portion of the cooling system of the nuclear reactor.
Claim 10
Dependent Claim 30 words
The methods of claims 1, 2, 3, 4, or 5 where the sample line comes from the reactor water clean-up system portion of the cooling system of the nuclear reactor.

References Cited (Backward Citations)

US4512921A Cited
US4532103A Cited
US4654187A Cited
US4636292A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1991-07-26 1992-01-25 1992-07-26 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1995-07-26 1996-01-25 1996-07-26 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1999-07-26 2000-01-25 2000-07-26 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag