← Back to Patent Explorer
US4756188A Expired / Lapsed US ⏱️ 0.0 years remaining

Method and apparatus for compensating for drilling line stretch in determining equipment depth in a well and for measurement of hookload on the traveling block of a drilling rig

Assignee: Baker Hughes Oilfield Operations LLC
•
Filing: 1986-06-30
•
Granted: 1988-07-12
•
Expires: 2006-06-30
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract An arrangement for measuring the stretch of a wire line used in well drilling operations by first measuring the amount of stretch in the deadline by measuring rotation of the dead sheave which supports the deadline, and multiplying the length of the wire line by the ratio of the amount of elastic stretch in the deadline to the length of the deadline. Equipment depth in the well is determined by measuring the movement of the wire line and applying a correction for the wire line stretch. If desired, a correction can also be applied for any errors in the split block separation. The ratio of the amount of stretch in the deadline to the length of the deadline may be employed to provide measurement of the hookload on the traveling block.

Inventors

  • 👤 Martin J. Fennell

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-01 14:50
CPC Classifications
E; E21; E21B; E21B47/00; E21B47/04; E21B19/00; E21B19/08; E21B19/084; G; G01; G01B; G01B21/00; G01B21/02; G01B21/06; G01B21/065

Claims Analysis

Total Claims: 12
Claim 1
Independent Claim 146 words
Apparatus for measuring the stretch of a wire line used in well drilling operations having an upper block with a plurality of sheaves and a traveling block having a plurality of sheaves, a wire line extending between the sheaves of the upper block and the sheaves of the traveling block, with one end of the wire line forming a deadline which extends from a fixed anchor over a rotatable dead sheave of the upper block comprising: (a) means coupled to the dead sheave of the upper block for measuring the rotation of the dead sheave to determine the amount of elastic stretch in the deadline; and (b) means for multiplying the length of the wire line by the ratio of the amount of elastic stretch in the deadline to the length of the deadline to provide a measurement of the elastic stretch of the wire line.
Claim 2
Dependent Claim 146 words
Apparatus for measuring the stretch of a wire line used in well drilling operations having an upper block with a plurality of sheaves and a traveling block having a plurality of sheaves, a wire line extending between the sheaves of the upper block and the sheaves of the traveling block, with one end of the wire line forming a deadline which extends from a fixed anchor over a rotatable dead sheave of the upper block comprising: (a) means coupled to the dead sheave of the upper block for measuring the rotation of the dead sheave to determine the amount of elastic stretch in the deadline; and (b) means for multiplying the length of the wire line by the ratio of the amount of elastic stretch in the deadline to the length of the deadline to provide a measurement of the elastic stretch of the wire line.
Claim 3
Dependent Claim 72 words
The apparatus of claim 1 further including means responsive to the measurement of the aforesaid ratio of the amount of elastic stretch in the deadline to the length of the deadline for multiplying said ratio by the cross-sectional area of the deadline times the Modulus of Elasticity for the wire line times the number of lines used to support the traveling block to provide measurement of the hookload on the traveling block.
Claim 4
Dependent Claim 198 words
Apparatus for measuring equipment depth in well drilling operations having an upper block with a plurality of sheaves and a traveling block having a plurality of sheaves, a wire line extending between the sheaves of the upper block and the sheaves of the traveling block, with one end of the wire line forming a deadline which extends from a fixed anchor over a dead sheave of the upper block comprising: (a) a first means for measuring the movement of the wire line in a direction along its longitudinal axis to determine the length of the wire which passes a referenced point; (b) second means coupled to the dead sheave of the upper block for measuring the rotation of the dead sheave to determine the amount of elastic stretch in the deadline between the fixed anchor and the dead sheave; (c) third means for multiplying the total length of the wire line by the ratio of the amount of elastic stretch in the deadline divided by the length of the deadline; and (d) fourth means for adding the measurements of the first and third means to show a corrected distance that the wireline has traveled from the referenced point.
Claim 5
Dependent Claim 198 words
Apparatus for measuring equipment depth in well drilling operations having an upper block with a plurality of sheaves and a traveling block having a plurality of sheaves, a wire line extending between the sheaves of the upper block and the sheaves of the traveling block, with one end of the wire line forming a deadline which extends from a fixed anchor over a dead sheave of the upper block comprising: (a) a first means for measuring the movement of the wire line in a direction along its longitudinal axis to determine the length of the wire which passes a referenced point; (b) second means coupled to the dead sheave of the upper block for measuring the rotation of the dead sheave to determine the amount of elastic stretch in the deadline between the fixed anchor and the dead sheave; (c) third means for multiplying the total length of the wire line by the ratio of the amount of elastic stretch in the deadline divided by the length of the deadline; and (d) fourth means for adding the measurements of the first and third means to show a corrected distance that the wireline has traveled from the referenced point.
Claim 6
Dependent Claim 69 words
The apparatus of claim 3 in which the traveling block is a split block, and further includes means for deriving a signal representing the difference between the rig position due to wave or tide action and the split block separation, and means for applying said signal to said fourth means to provide a correction in the measurement of equipment depth for any errors introduced by the split block separation.
Claim 7
Dependent Claim 139 words
In a method of measuring the stretch of a wire line used in well drilling operations having an upper block with a plurality of sheaves and a traveling block having a plurality of sheaves, a wire line extending between the sheaves of the upper block and the sheaves of the traveling block, with one end of the wire line forming a deadline which extends from a fixed anchor over a dead sheave of the upper block, the steps comprising: (a) measuring the entire amount of elastic stretch in the deadline between the fixed anchor and the dead sheave; and (b) multiplying the total length of the wire line by the ratio of the amount of elastic stretch in the deadline divided by the length of the deadline to provide a measurement of the elastic stretch of the wire line.
Claim 8
Dependent Claim 139 words
In a method of measuring the stretch of a wire line used in well drilling operations having an upper block with a plurality of sheaves and a traveling block having a plurality of sheaves, a wire line extending between the sheaves of the upper block and the sheaves of the traveling block, with one end of the wire line forming a deadline which extends from a fixed anchor over a dead sheave of the upper block, the steps comprising: (a) measuring the entire amount of elastic stretch in the deadline between the fixed anchor and the dead sheave; and (b) multiplying the total length of the wire line by the ratio of the amount of elastic stretch in the deadline divided by the length of the deadline to provide a measurement of the elastic stretch of the wire line.
Claim 9
Dependent Claim 47 words
The method of claim 5 further including multiplying said ratio by the cross-sectional area of the deadline times the Modulus of Elasticity for the wire line times the number of lines used to support the traveling block to provide measurement of the hookload on the traveling block.
Claim 10
Dependent Claim 170 words
In a method for measuring equipment depth in well drilling operations having an upper block with a plurality of sheaves and a traveling block having a plurality of sheaves, a wire line extending between the sheaves of the upper block and the sheaves of the traveling block, with one end of the wire line forming a deadline which extends from a fixed anchor over a dead sheave of the upper block comprising: (a) measuring the movement of the wire line in a direction along its longitudinal axis to determine the length of the wire which passes a referenced point; (b) measuring the entire amount of elastic stretch in the deadline between the fixed anchor and the dead sheave; (c) multiplying the total length of the wire line by the ratio of the amount of elastic stretch in the deadline divided by the length of the deadline; and (d) adding the measurements of steps (a) and (c) to show a corrected distance that the wireline has traveled from the referenced point.
Claim 11
Dependent Claim 170 words
In a method for measuring equipment depth in well drilling operations having an upper block with a plurality of sheaves and a traveling block having a plurality of sheaves, a wire line extending between the sheaves of the upper block and the sheaves of the traveling block, with one end of the wire line forming a deadline which extends from a fixed anchor over a dead sheave of the upper block comprising: (a) measuring the movement of the wire line in a direction along its longitudinal axis to determine the length of the wire which passes a referenced point; (b) measuring the entire amount of elastic stretch in the deadline between the fixed anchor and the dead sheave; (c) multiplying the total length of the wire line by the ratio of the amount of elastic stretch in the deadline divided by the length of the deadline; and (d) adding the measurements of steps (a) and (c) to show a corrected distance that the wireline has traveled from the referenced point.
Claim 12
Dependent Claim 61 words
The method of claim 7 in which the traveling block is a split block, and further includes deriving a signal representing the difference between the rig position due to wave or tide action and the split block separation, and applying said signal to that produced by step (d) to provide a correction for any errors introduced by the split block separation.

References Cited (Backward Citations)

US2061863A Cited
US3115036A Cited
US3552025A Cited
US3643504A Cited
US3753294A Cited
US3777560A Cited
US3891038A Cited
US3931735A Cited
US4338565A Cited
US4434971A Cited
US4562743A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1991-07-12 1992-01-11 1992-07-12 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1995-07-12 1996-01-11 1996-07-12 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1999-07-12 2000-01-11 2000-07-12 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag