Blasting signal transmission tube delay unit
Abstract
Abstract A transmission tube signal delay assembly comprising a delay element containing a shaped delay composition having a preselected combustion time from a first side of the delay element to a second side of the delay element; a first transition element adjacent to the delay element at the first side for transferring a transmission tube signal to the delay element; and a second transition element adjacent to the delay element at the second side for transferring a signal from the delay element to a transmission tube, each of the transition elements comprising a shaped transition composition. Also, a method for delaying a transmission tube signal delay unit having a housing with a plurality of openings for receiving portions of signal transmission tube having interior-exposing opening means for securing the signal transmission tubes in the housing openings; and the signal delay assembly mounted in the housing with each of the transition elements positioned between the delay element and one of the housing openings for transferring a signal between the delay element and each of the signal transmission tubes.
Inventors
- 👤 Stephen W. Bartholomew
- 👤 Daniel C. Rontey
- 👤 William J. Necker
- 👤 Craig F. Adams
Bibliographic Details
Claims Analysis
Total Claims: 7References Cited (Backward Citations)
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1991-05-10 | 1991-11-09 | 1992-05-10 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1995-05-10 | 1995-11-09 | 1996-05-10 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1999-05-10 | 1999-11-09 | 2000-05-10 | $7700.00 | Window Closed / Lapsed |