Method of automatically determining drilling fluid lag time while drilling a well
Assignee: PRECISION WELL LOGGING Inc A TX CORP
•
Filing: 1987-01-14
•
Granted: 1988-04-26
•
Expires: 2007-01-14
Abstract
Abstract A continuously adjusted calculated annulus drilling fluid lag time while drilling oil and gas wells and analyzing the drilling mud at the well surface for formation gas, fluids and rock in order to accurately index the release of the formation gas, fluids and rock released by the drill bit with the depth at which they were released. The method obtains such analyses by using a computer and pumping pressure to accurately track the drilling mud time lag and automatically adjusts for variations in the annulus flow rate to correlate the recorded data with its originating depth.
Inventors
- 👤 Carl T. Greer
- 👤 Clarence F. Ryan
- 👤 Mark H. Blankenship
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-09 09:38
CPC Classifications
E; E21; E21B; E21B21/00; E21B21/08; E21B47/00; E21B47/04; E21B47/053; E21B49/00; E21B49/005
Claims Analysis
Total Claims: 6
Claim 1
Independent Claim
149 words
The method of automatically determining the lag time for drilling fluid to move through a well annulus while drilling a well in which drilling fluid is pumped down a drill pipe, out of a drill bit and up the annulus comprising, measuring the lag time, by inserting a marker in the drill pipe, and deriving a relationship between measured pump strokes, pump pressure and fluid velocity in the annulus, determining a relationship between pump pressure and lag time over a range of pump pressures, thereafter continuously measuring pump pressure while drilling and calculating lag time from the relationship previously determined, measuring the depth of the drill bit using the change in the depth measurement for adjusting the calculated lag time, measuring at least one parameter of the drilling fluid flowing out of the annulus, and correlating the measured mud parameter with the calculated lag time and thus to depth.
Claim 2
Independent Claim
149 words
The method of automatically determining the lag time for drilling fluid to move through a well annulus while drilling a well in which drilling fluid is pumped down a drill pipe, out of a drill bit and up the annulus comprising, measuring the lag time, by inserting a marker in the drill pipe, and deriving a relationship between measured pump strokes, pump pressure and fluid velocity in the annulus, determining a relationship between pump pressure and lag time over a range of pump pressures, thereafter continuously measuring pump pressure while drilling and calculating lag time from the relationship previously determined, measuring the depth of the drill bit using the change in the depth measurement for adjusting the calculated lag time, measuring at least one parameter of the drilling fluid flowing out of the annulus, and correlating the measured mud parameter with the calculated lag time and thus to depth.
Claim 3
Dependent Claim
36 words
The method of claim 1 including, repeating the steps of claim 1 to determine a new relationship between pump pressure and lag time each time well drilling conditions change sufficiently to obsolete the earlier determined relationship.
Claim 4
Dependent Claim
30 words
The method of claim 1 wherein measuring a parameter of the drilling fluid includes measuring the amount of formation gas, rock cuttings and other formation fluids in the drilling fluid.
Claim 5
Dependent Claim
48 words
The method of claim 1 wherein a base lag time is determined for one point of lag time measurements and the other lag time measurments for different values of pump pressures are converted to a factor of the base lag time for providing an input to a computer.
Claim 6
Dependent Claim
46 words
The method of claim 1 wherein the relationship between pump pressure and lag time over a range of pump pressures is determined by measuring the pump strokes and pump pressure at a plurality of different pump strokes and calculating the lag times at the measured values.
References Cited (Backward Citations)
US2414246A
Cited
US2658725A
Cited
US2659046A
Cited
US2806372A
Cited
US2925251A
Cited
US3155176A
Cited
US3324717A
Cited
US3462761A
Cited
US3386286A
Cited
US3512164A
Cited
US3750766A
Cited
US3982432A
Cited
US4295366A
Cited
US4326411A
Cited
US4401169A
Cited
US4507735A
Cited
US4535851A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1991-04-26 | 1991-10-26 | 1992-04-26 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1995-04-26 | 1995-10-26 | 1996-04-26 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1999-04-26 | 1999-10-26 | 2000-04-26 | $7700.00 | Window Closed / Lapsed |