US4736374A Expired / Lapsed US ⏱️ 0.0 years remaining

Automated test apparatus for use with multiple equipment

Assignee: Grumman Corp
•
Filing: 1986-05-14
•
Granted: 1988-04-05
•
Expires: 2006-05-14
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A number of standardized microprocessors are used as building blocks for gaining access and control to other standardized functional resource circuit units. One of the microprocessors is selected by a main processing unit to capture the different functional resource circuit units needed to perform functions of a discrete test instrument. To instruct the different resource circuit units to perform the needed functions, a program is downloaded from a mass memory by the microprocessor. After having performed the necessary functions, the microprocessor releases the different functional resource circuit units, which--along with the microprocessor--would return to idle and await the next selection.

Inventors

  • 👤 Donald Kump
  • 👤 Eddie T. Kovacs

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-24 19:41
CPC Classifications
G; G01; G01R; G01R31/00; G01R31/28; G01R31/317; G01R31/3181; G01R31/319; G01R31/31903; G01R31/31907

Claims Analysis

Total Claims: 14
Claim 1
Independent Claim 183 words
A system for testing different types of equipment under test, comprising: means for interfacing an equipment under test to the system; a plurality of functional resource sets; first bus means connecting the plurality of functional resource sets; a plurality of identical instrument controllers connected to the first bus means, each instrument controller capable of synthesizing from the plurality of functional resource sets different function instruments, each of the function instruments being adaptable to test a particular equipment under test; second bus means connecting the plurality of instrument controllers for effecting a communication link therebetween; and a central processing means connected to the second bus means for communicating with the instrument controllers, wherein, when an equipment under test is engaged to the system via the interfacing means, the processing means selects one instrument controller from the plurality of instrument controllers and instructs the selected controller of the particular equipment to be tested, the selected controller downloading instruments from a storage means for effecting the synthesizing of a function instrument from the functional resource sets, the function instrument being used for testing the particular equipment.
Claim 2
Independent Claim 183 words
A system for testing different types of equipment under test, comprising: means for interfacing an equipment under test to the system; a plurality of functional resource sets; first bus means connecting the plurality of functional resource sets; a plurality of identical instrument controllers connected to the first bus means, each instrument controller capable of synthesizing from the plurality of functional resource sets different function instruments, each of the function instruments being adaptable to test a particular equipment under test; second bus means connecting the plurality of instrument controllers for effecting a communication link therebetween; and a central processing means connected to the second bus means for communicating with the instrument controllers, wherein, when an equipment under test is engaged to the system via the interfacing means, the processing means selects one instrument controller from the plurality of instrument controllers and instructs the selected controller of the particular equipment to be tested, the selected controller downloading instruments from a storage means for effecting the synthesizing of a function instrument from the functional resource sets, the function instrument being used for testing the particular equipment.
Claim 3
Dependent Claim 40 words
A system according to claim 1, wherein the storage means is connected to the second bus means, the storage means including instructions to be utilized by the instrument controllers to synthesize different function instruments from the different functional resource sets.
Claim 4
Dependent Claim 27 words
A system according to claim 2, wherein the storage means further includes instructions to be utilized by the selected instrument controller to operate the synthesized function instrument.
Claim 5
Dependent Claim 28 words
A system according to claim 3, wherein the storage means further comprises an index table for indicating to the processing means the availability of the different instrument controllers.
Claim 6
Dependent Claim 13 words
A system according to claim 4, wherein the processing means comprises a microprocessor.
Claim 7
Dependent Claim 13 words
A system according to claim 4, wherein each instrument controller comprises a microprocessor.
Claim 8
Dependent Claim 20 words
A system according to claim 1, wherein each resource set comprises a multiple number of identical functional resource circuit units.
Claim 9
Dependent Claim 27 words
A system according to claim 7, wherein each functional instrument is made from a different combination of functional resource circuit units picked from different functional resource sets.
Claim 10
Independent Claim 158 words
A system for testing different types of equipment under test, comprising: a plurality of functional resource sets each having a multiple number of identical resource circuit units; first bus means connecting the resource circuit units; a plurality of identical instrument controllers connected to the first bus means, each instrument controller capable of synthesizing from the plurality of resource units different function instruments, each function instrument being adaptable to test a particular equipment under test; second bus means connecting the plurality of instrument controllers for effecting communication link therebetween; a memory means connected to the second bus means and in communication with the instrument controllers; a central processing means connected to the second bus means, the processing means selecting one instrument controller from the plurality of instrument controllers, the processing means further instructing the selected instrument controller to download from the memory means instructions for synthesizing a function instrument from the resource units and for operating the function instrument.
Claim 11
Independent Claim 158 words
A system for testing different types of equipment under test, comprising: a plurality of functional resource sets each having a multiple number of identical resource circuit units; first bus means connecting the resource circuit units; a plurality of identical instrument controllers connected to the first bus means, each instrument controller capable of synthesizing from the plurality of resource units different function instruments, each function instrument being adaptable to test a particular equipment under test; second bus means connecting the plurality of instrument controllers for effecting communication link therebetween; a memory means connected to the second bus means and in communication with the instrument controllers; a central processing means connected to the second bus means, the processing means selecting one instrument controller from the plurality of instrument controllers, the processing means further instructing the selected instrument controller to download from the memory means instructions for synthesizing a function instrument from the resource units and for operating the function instrument.
Claim 12
Dependent Claim 36 words
The method according to claim 9, further comprising: notifying the instrument controller that the function instrument is no longer required; and prompting the instrument controller to release the resource circuit units used for testing the equipment.
Claim 13
Dependent Claim 152 words
In a system for testing different equipment under test, the system including a plurality of function resource circuit units, a first bus connecting the resource circuit units to a plurality of instrument controllers, and a second bus connecting the instrument controllers to a central processing means and a memory means, a method of testing an equipment comprising: connecting an equipment under test to the system via an interfacing means; selecting from the plurality of instrument controllers an idle instrument controller; instructing the selected idle instrument controller to synthesize a function instrument to test the connected equipment; wherein the synthesizing of the function instrument by the instrument controller includes: downloading from the memory means respective programs for capturing the required resource units and performing test functions of the function instrument; capturing the resource units required by the function instrument; and executing the program for effecting the resource circuit units to test the equipment.
Claim 14
Dependent Claim 152 words
In a system for testing different equipment under test, the system including a plurality of function resource circuit units, a first bus connecting the resource circuit units to a plurality of instrument controllers, and a second bus connecting the instrument controllers to a central processing means and a memory means, a method of testing an equipment comprising: connecting an equipment under test to the system via an interfacing means; selecting from the plurality of instrument controllers an idle instrument controller; instructing the selected idle instrument controller to synthesize a function instrument to test the connected equipment; wherein the synthesizing of the function instrument by the instrument controller includes: downloading from the memory means respective programs for capturing the required resource units and performing test functions of the function instrument; capturing the resource units required by the function instrument; and executing the program for effecting the resource circuit units to test the equipment.

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1991-04-05 1991-10-05 1992-04-05 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1995-04-05 1995-10-05 1996-04-05 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1999-04-05 1999-10-05 2000-04-05 $7700.00 Window Closed / Lapsed