US4733732A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Submudline drivepipe whipstock method and apparatus
Assignee: Atlantic Richfield Co
•
Filing: 1987-07-13
•
Granted: 1988-03-29
•
Expires: 2007-07-13
Abstract
Abstract In order to salvage a slot path on an offshore platform wherein the original conductor pipe has become clogged or otherwise rendered unusable, the original conductor is cut off below mudline, thereby leaving a stub forming a base upon which a suitably oriented deflector trough is attached. A new or replacement conductor is installed along the same slot path until the deflector trough causes the new conductor to follow a deviated path so as to avoid the original conductor. The direction of the deflector trough is selected to avoid existing wells already driven from such structure.
Inventors
- 👤 Samuel C. Lynch
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-10-25 22:10
CPC Classifications
E; E21; E21B; E21B7/00; E21B7/04; E21B7/06; E21B7/061; E21B7/043; E21B7/12; E21B7/136
Claims Analysis
Total Claims: 13
Claim 1
Independent Claim
198 words
A method of installing a replacement well conductor from a fixed structure above a body of water to replace an abandoned well conductor previously installed from said structure along a predetermined path through said body of water so as to penetrate the substratum below the floor of said body of water comprising the steps of: (a) severing said abandoned conductor at a predetermined depth below the floor of said body of water, said depth being such that the upper end of said abandoned conductor will yield under lateral pressure; (b) retrieving the portion of said abandoned conductor extending above said depth; (c) positioning means in fixed engagement with the upper end of the remaining portion of said abandoned conductor for deflecting the path of said replacement conductor; and (d) directing said replacement conductor along said predetermined path through said body of water until interaction with said deflecting means causes said replacement conductor to advance into the substratum in the direction of said deflected path so as to bypass said abandoned conductor and also causes the application of lateral pressure to the end of said abandoned conductor sufficient to cause the end of said abandoned conductor to shift position.
Claim 2
Independent Claim
198 words
A method of installing a replacement well conductor from a fixed structure above a body of water to replace an abandoned well conductor previously installed from said structure along a predetermined path through said body of water so as to penetrate the substratum below the floor of said body of water comprising the steps of: (a) severing said abandoned conductor at a predetermined depth below the floor of said body of water, said depth being such that the upper end of said abandoned conductor will yield under lateral pressure; (b) retrieving the portion of said abandoned conductor extending above said depth; (c) positioning means in fixed engagement with the upper end of the remaining portion of said abandoned conductor for deflecting the path of said replacement conductor; and (d) directing said replacement conductor along said predetermined path through said body of water until interaction with said deflecting means causes said replacement conductor to advance into the substratum in the direction of said deflected path so as to bypass said abandoned conductor and also causes the application of lateral pressure to the end of said abandoned conductor sufficient to cause the end of said abandoned conductor to shift position.
Claim 3
Dependent Claim
31 words
The method of claim 1 wherein said deflecting means comprises a downwardly sloping deflector trough disposed above and externally of the upper end of said remaining portion of said abandoned conductor.
Claim 4
Dependent Claim
54 words
The method of claim 2 wherein the said abandoned and replacement conductor is passed through a plurality of spaced apart guide sleeves carried on said fixed structure, whereby said replacement conductor is substantially unconstrained against lateral bending between the bottom most of said guide sleeves and the lower most portion of said deflector trough.
Claim 5
Dependent Claim
37 words
The method of claim 3 wherein the depth of the upper end of said remaining portion of said abandoned conductor is selected such that said lateral bending of said replacement conductor does not exceed a predetermined maximum.
Claim 6
Dependent Claim
16 words
The method of claim 4 wherein said lateral bending does not exceed 2° per 100 feet.
Claim 7
Dependent Claim
11 words
The method of claim 1 wherein said predetermined path is vertical.
Claim 8
Independent Claim
158 words
A method of installing a new driven conductor on a fixed structure above a body of water as a replacement for a prior driven old conductor installed along a given slot path through said body of water comprising the steps of: (a) retrieving the old conductor to a selected depth below the mudline, said depth being such that the upper end of said abandoned conductor will yield under lateral pressure; (b) positioning a deflector trough in fixed engagement with the remaining portion of said old conductor for deflecting the path of said new conductor; and (c) directing said new conductor along said slot path through said body of water until interaction with said deflector trough causes said new conductor to advance into the substratum in the direction of said deflecting path and also causes the application of lateral pressure to the end of said abandoned conductor sufficient to cause the end of said abandoned conductor to shift position.
Claim 9
Independent Claim
158 words
A method of installing a new driven conductor on a fixed structure above a body of water as a replacement for a prior driven old conductor installed along a given slot path through said body of water comprising the steps of: (a) retrieving the old conductor to a selected depth below the mudline, said depth being such that the upper end of said abandoned conductor will yield under lateral pressure; (b) positioning a deflector trough in fixed engagement with the remaining portion of said old conductor for deflecting the path of said new conductor; and (c) directing said new conductor along said slot path through said body of water until interaction with said deflector trough causes said new conductor to advance into the substratum in the direction of said deflecting path and also causes the application of lateral pressure to the end of said abandoned conductor sufficient to cause the end of said abandoned conductor to shift position.
Claim 10
Dependent Claim
23 words
The method of claim 7 including the step of carrying said deflector trough to the old conductor by means of the new conductor.
Claim 11
Dependent Claim
39 words
The method of claim 8 including the step of continuing to lower said new conductor after engagement of said deflector with said old conductor so as to disengage said new conductor from said deflector trough by a shearing force.
Claim 12
Dependent Claim
17 words
The method of claim 8 wherein said deflector trough is adapted to slidably engage said original conductor.
Claim 13
Dependent Claim
21 words
The method of claim 7 wherein said deflector trough is carried into position by means of a section of drill pipe.
References Cited (Backward Citations)
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1991-03-29 | 1991-09-28 | 1992-03-29 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1995-03-29 | 1995-09-28 | 1996-03-29 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1999-03-29 | 1999-09-28 | 2000-03-29 | $7700.00 | Window Closed / Lapsed |