← Back to Patent Explorer
US4730101A Expired / Lapsed US ⏱️ 0.0 years remaining

Apparatus and method for controlling the temperature of a furnace

Assignee: EDWARD ORTON JR CERAMIC FOUNDATION
•
Filing: 1986-04-22
•
Granted: 1988-03-08
•
Expires: 2006-04-22
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A microcomputer control system for a furnace is disclosed which provides accurate control of the temperature of the furnace such that the temperature can be quickly increased to a predetermined desired temperature without overshooting the desired temperature. The control system determines the tuning constants of the furnace as a function of the system's response to a predetermined input and, thereafter, uses the determined tuning constants to accurately control the temperature of the furnace. The control system employs a novel method for increasing the temperature of a furnace wherein full power is applied to the furnace heat source until the microcomputer makes the determination, based upon the furnace tuning constants, that power supplied to the furnace must be reduced to prevent the temperature of the furnace from overshooting the desired temperature. Upon making such a determination, the microcomputer controls the temperature of the furnace such that the furnace temperature exponentially achieves the desired temperature. The control system further includes apparatus adapted to cooperate with the microcomputer for preventing damage to the furnace and materials heated therein from malfunction of either the control system apparatus or the microcomputer software.

Inventors

  • 👤 Kenneth Mahon
  • 👤 Gary S. Sheffield
  • 👤 Gary L. Snider
  • 👤 Milan Vukovich, Jr.

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-28 21:22
CPC Classifications
F; F27; F27D; F27D19/00; G; G05; G05D; G05D23/00; G05D23/19; G05D23/1917; G05D23/20; G05D23/22; F27D2019/0006; F27D2019/0018; F27D2019/0028; F27D2019/0034; F27D2019/0037

Claims Analysis

Total Claims: 19
Claim 1
Independent Claim 168 words
A method for controlling the temperature of a furnace comprising the steps of: (a) supplying a predetermined quantum of energy for heating the furnace; (b) monitoring the heating rate at which the temperature of the furnace changes and the temperature of the furnace at each monitored heating rate until a maximum heating rate is observed and recording the maximum heating rate was well as the temperature at which the maximum heating rate is observed; (c) determining the heating characteristics of the furnace including at least the heat lag defined as the difference between the time required for the furnace to reach the temperature at which the maximum heating rate is observed and the time necessary for a linearly heated furnace, having a heating rate equal to the observed maximum rate, to reach this same temperature from the observed rate of temperature change; and (d) modulating the quantum of energy supplied to the furnace in response to the determined heating characteristics to thereby control the temperature of the furnace.
Claim 2
Independent Claim 168 words
A method for controlling the temperature of a furnace comprising the steps of: (a) supplying a predetermined quantum of energy for heating the furnace; (b) monitoring the heating rate at which the temperature of the furnace changes and the temperature of the furnace at each monitored heating rate until a maximum heating rate is observed and recording the maximum heating rate was well as the temperature at which the maximum heating rate is observed; (c) determining the heating characteristics of the furnace including at least the heat lag defined as the difference between the time required for the furnace to reach the temperature at which the maximum heating rate is observed and the time necessary for a linearly heated furnace, having a heating rate equal to the observed maximum rate, to reach this same temperature from the observed rate of temperature change; and (d) modulating the quantum of energy supplied to the furnace in response to the determined heating characteristics to thereby control the temperature of the furnace.
Claim 3
Dependent Claim 90 words
The method as recited in claim 1 wherein the step of monitoring the rate of temperature change of the furnace comprises the substeps of: (f) determining the temperature of the furnace prior to applying a predetermined quantum of power; and (g) determining the maximum heating rate (HRMAX) of the furnace while being supplied with the predetermined amount of power and, thereafter, recording the time (SGAMMA) elapsed since the predetermined amount power has been applied and recording the temperature of the furnace at which the maximum heating rate (HRMAX) was observed.
Claim 4
Dependent Claim 37 words
The method as recited in claim 2 wherein the step of determining the heat lag (L) of the furnace comprises the substep of: (h) determining the heat lag (L) in accordance with the following expression: L=[(HRMAX*SGAMMA)-(t.sub.m -t.sub.s)]/HRMAX.
Claim 5
Dependent Claim 144 words
The method as recited in claim 2 wherein the step of determining the maximum heating rate (HRMAX) comprises the substeps of: (i) initially setting the maximum heating rate (HRMAX) to zero and initializing an index value (IND) to a predetermined number; (j) determining the current heating rate (HRCUR) and performing step k; (k) comparing the current heating rate (HRCUR) with the maximum heating rate (HRMAX) to determine whether the current heating rate is greater than the maximum and, if not, performing step 1 and, if so, setting the maximum heating rate (HRMAX) equal to the current heating rate (HRCUR) and repeating step i; and (l) decrementing the index variable (IND) by one and determining whether it is less than or equal to zero and, if not, repeating step j and, if so, the value of (HRMAX) is determined to be the maximum heating rate.
Claim 6
Dependent Claim 141 words
The method as recited in claim 3 wherein the temperature of the furnace is to be increased to and maintained at a desired temperature (t d ), and wherein the step of modulating the temperature of the furnance further comprises the substeps of: (m) determining the initial heating rate (HRINT) of the furnace prior to applying the predetermined quantum of energy; (n) determining the temperature deviation (DEV) between the current temperature (t c ) and the desired temperature (t d ); (o) computing proportional, integral and derivative control constants, PC, IC and DC, respectively, as follows: PC=(a*PWR)/[(HRMAX-HRINT)*L] IC=(b.sub.1 /(L*b.sub.2), and DC=b.sub.1 *b.sub.2 *L wherein PWR represents the quantum of power which was supplied to the furnace when HRMAX was observed and a, b 1 and b 2 are chosen in accordance with the following expressions: 1.0≦a≦2.0 0.5≦b.sub.1 ≦1.0, and 40≦b.sub.2 ≦80.
Claim 7
Dependent Claim 154 words
Apparatus for controllably heating a furnace comprising: sensor means for providing a temperature signal indicative of the furnace temperature; heat source means responsive to a heat control signal for heating said furnace; and data processing means for providing the heat control signal, said data processing means being responsive to the temperature signal to determine the heating constants of the furnace from the heating characteristics of the furnace, the heating characteristics including at least the heat lag of the furnace defined as the difference between the time required for the furnace to reach the temperature at which a maximum heating rate is observed and the time necessary for a linearly heated furnace, having a heating rate equal to the observed maximum heating rate, to reach this same temperature, said data processing means being adapted to modulate the heat control signal in response to the determined heating constants to thereby control the temperature of the furnace.
Claim 8
Dependent Claim 154 words
Apparatus for controllably heating a furnace comprising: sensor means for providing a temperature signal indicative of the furnace temperature; heat source means responsive to a heat control signal for heating said furnace; and data processing means for providing the heat control signal, said data processing means being responsive to the temperature signal to determine the heating constants of the furnace from the heating characteristics of the furnace, the heating characteristics including at least the heat lag of the furnace defined as the difference between the time required for the furnace to reach the temperature at which a maximum heating rate is observed and the time necessary for a linearly heated furnace, having a heating rate equal to the observed maximum heating rate, to reach this same temperature, said data processing means being adapted to modulate the heat control signal in response to the determined heating constants to thereby control the temperature of the furnace.
Claim 9
Dependent Claim 133 words
Apparatus as recited in claim 6 wherein said heat source means comprises a power source, a first switch and a heating element, said apparatus further comprising: a second switch coupled to said power source and responsive to an override signal for transferring power received from said power source to said first switch, said first switch being responsive to the heat control signal for transferring power received from said second switch to said heating element; and power checker means for determining when said heating element is receiving power from said power source, said data processing means being responsive to said power checking means for determining whether said first switch has malfunctioned and, if so, interrupting the override signal to prevent said second switch from providing power from said power source to said first switch.
Claim 10
Dependent Claim 29 words
Apparatus as recited in claim 7 further comprising: means for providing a timed interrupt, said data processing means being responsive to the timed interrupt for providing the override signal.
Claim 11
Independent Claim 191 words
A method for increasing the temperature of a furnace to a predetermined desired temperature without overshooting the desired temperature, said method comprising the steps of: (a) determining the heat lag of the furnace as a function of the system's response to a predetermined quantum of power input by using the input power to heat the furnace and determining the heat lag of the furnace defined as the difference between the time necessary for the furnace to reach the temperature at which the maximum heating rate is observed and the time necessary for a linearly heated furnace, having a heating rate equal to the observed maximum rate to reach this same temperature; (b) supplying a first predetermined quantum of power for heating the furnace until the determination is made, based on the determined heat lag, that power must be reduced in order to effectively reduce the rate of temperature increase of the furnace such that the furnace does not overshoot the desired temperature; and (c) using the determined heat lag to control the temperature increase of the furnace such that the furnace temperature increases to the desired temperature in an exponential manner.
Claim 12
Independent Claim 191 words
A method for increasing the temperature of a furnace to a predetermined desired temperature without overshooting the desired temperature, said method comprising the steps of: (a) determining the heat lag of the furnace as a function of the system's response to a predetermined quantum of power input by using the input power to heat the furnace and determining the heat lag of the furnace defined as the difference between the time necessary for the furnace to reach the temperature at which the maximum heating rate is observed and the time necessary for a linearly heated furnace, having a heating rate equal to the observed maximum rate to reach this same temperature; (b) supplying a first predetermined quantum of power for heating the furnace until the determination is made, based on the determined heat lag, that power must be reduced in order to effectively reduce the rate of temperature increase of the furnace such that the furnace does not overshoot the desired temperature; and (c) using the determined heat lag to control the temperature increase of the furnace such that the furnace temperature increases to the desired temperature in an exponential manner.
Claim 13
Dependent Claim 107 words
The method as recited in claim 9 wherein the step of determining the heat lag of the furnace comprises the substeps of: (d) determining the temperature of the furnace and, thereafter, applying a second predetermined quantum of power to the furnace; (e) determining the maximum heating rate (HRMAX) of the furnace while being supplied with the second predetermined quantum of power and, thereafter, rrecording the time (SGAMMA) elapsed since the first predetermined quantum power has been applied and recording the temperature of the furnace at which the maximum heating rate (HRMAX) was observed; and (f) determining the heat lag (L) of the furnace as follows: L=[(HRMAX*SGAMMA)-(t.sub.m -t.sub.s)]/HRMAX.
Claim 14
Dependent Claim 54 words
The method as recited in claim 10 wherein the step of applying full power to the furnace until the determination is made that the power must be reduced comprises the substep of determining whether the following expression is true: t.sub.c ≧t.sub.d -L*HRMAX*RH4 and, if so, reducing the quantum of power supplied to the furnace.
Claim 15
Dependent Claim 121 words
The method as recited in claim 9 wherein the step of using the determined heat lag to control the temperature increase of the furnace comprises the substeps: (g) determining a set point temperature based on a polynomial curve fit as the temperature at which the furnace should be during a future predetermined time period; (h) determining the temperature deviation between the set point temperature and the current temperature; (i) modulating the quantum of power supplied to the furnace in response to the temperature deviation and the furnace tuning constants such that the temperature of the furnace is driven toward the set point temperature; and (j) repeating steps g-i until the current temperature is within a predetermined range of the desired temperature.
Claim 16
Dependent Claim 175 words
Apparatus for preventing the transfer of power from a furnace power source to a furnace heat source upon the malfunction of the furnace control system, said apparatus comprising: first switch means coupled to receive power from said power source; second switch means coupled to receive power from said first switch means and responsive to a heat control signal for transferring power received from said first switch means to said heat source; power checker means for indicating when power is being received by said heat source; and data processing means responsive to a timed interrupt for providing the override signal and the heat control signal, said data processing means being responsive to said power checker means for determining when a control system malfunction has occurred and, upon making such determination, for interrupting the override signal, said first switch means being responsive to the override signal for transfering power received from said power source to said second switch means such that, upon interruption of the override signal, power is no longer applied to said second switch means.
Claim 17
Dependent Claim 175 words
Apparatus for preventing the transfer of power from a furnace power source to a furnace heat source upon the malfunction of the furnace control system, said apparatus comprising: first switch means coupled to receive power from said power source; second switch means coupled to receive power from said first switch means and responsive to a heat control signal for transferring power received from said first switch means to said heat source; power checker means for indicating when power is being received by said heat source; and data processing means responsive to a timed interrupt for providing the override signal and the heat control signal, said data processing means being responsive to said power checker means for determining when a control system malfunction has occurred and, upon making such determination, for interrupting the override signal, said first switch means being responsive to the override signal for transfering power received from said power source to said second switch means such that, upon interruption of the override signal, power is no longer applied to said second switch means.
Claim 18
Dependent Claim 53 words
Apparatus as recited in claim 13 wherein said first switch means further comprises: watchdog switch means for receiving the override signal and providing in response thereto a power connect signal; and third switch means responsive to the power connect signal for transferring power received from said power source to said second switch means.
Claim 19
Dependent Claim 32 words
Apparatus as recited in claim 14 wherein said second switch means is further responsive to the power connect signal for transferring power received from said third switch means to said heat source.

References Cited (Backward Citations)

US4109134A Cited
US4277671A Cited
US4476373A Cited
US4367399A Cited
US4451726A Cited
US4506143A Cited
US4570054A Cited
US4461616A Cited
US4620083A Cited
US4614860A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1991-03-08 1991-09-07 1992-03-08 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1995-03-08 1995-09-07 1996-03-08 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1999-03-08 1999-09-07 2000-03-08 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag