US4718492A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Process for passing carbon dioxide through a cased, cemented and perforated well
Assignee: Shell USA Inc
•
Filing: 1987-06-16
•
Granted: 1988-01-12
•
Expires: 2007-06-16
Abstract
Abstract In a process for completing and operating a well, which process involves passing carbon dioxide through a case, cemented and perforated well, carbon dioxide-induced damage of the cement is avoided by coating the cement tunnel walls so that the carbon dioxide is passed through perforation tunnels which have been internally coated by epoxy resin.
Inventors
- 👤 Hermanus G. Van Laar
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-09 01:30
CPC Classifications
C; C09; C09K; C09K8/00; C09K8/60; C09K8/84; C09K8/86; C09K8/88; C09K8/885; C09K8/54; E; E21; E21B; E21B33/00; E21B33/10; E21B33/13; E21B41/00; E21B41/02; Y; Y10; Y10S; Y10S166/00; Y10S166/902
Claims Analysis
Total Claims: 10
Claim 1
Independent Claim
321 words
In a process for completing and operating a well for production of a liquid from a subterranean reservoir in which a casing string is cemented and perforated and a CO 2 -containing fluid is flowed through a plurality of casing perforations and cement tunnels into or out of the reservoir, an improved process for reducing CO 2 -induced damage of the cement, comprising: injecting a first aqueous liquid which is compatible with the liquid in the well and the reservoir into the casing string prior to the flowing of the CO 2 -containing fluid; flowing the first aqueous liquid into and out of contact with the casing perforations and the cement tunnels to displace debris from the casing perforations and the cement tunnels; injecting into the casing string a volume of an oleogenous liquid which contains a plurality of dissolved epoxy resin-forming components and epoxy resin-curing agents capable of subsequently forming and depositing a cured epoxy resin at the reservoir temperature and has a volume which is not significantly more than enough to fill the casing perforations and the cement tunnels; injecting a second aqueous liquid which is compatible with the liquid in the well and reservoir into the casing string; displacing the oleogenous liquid ahead of the second aqueous liquid so that the oleogenous liquid is driven to fill the casing perforations and the cement tunnels; maintaining the oleogenous liquid at least substantially stationary until a deposition of at least substantially cured epoxy resin has occurred substantially selectively within the casing perforations and the cement tunnels; injecting into the casing string a third aqueous liquid which is compatible with the liquid in the well and reservoir; flowing the third aqueous liquid into and out of contact with the casing perforations and the cement tunnels to displace the resin-forming components which are undeposited; and subsequently flowing the CO 2 -containing fluid through the resin coated casing perforations and the cement tunnels.
Claim 2
Dependent Claim
321 words
In a process for completing and operating a well for production of a liquid from a subterranean reservoir in which a casing string is cemented and perforated and a CO 2 -containing fluid is flowed through a plurality of casing perforations and cement tunnels into or out of the reservoir, an improved process for reducing CO 2 -induced damage of the cement, comprising: injecting a first aqueous liquid which is compatible with the liquid in the well and the reservoir into the casing string prior to the flowing of the CO 2 -containing fluid; flowing the first aqueous liquid into and out of contact with the casing perforations and the cement tunnels to displace debris from the casing perforations and the cement tunnels; injecting into the casing string a volume of an oleogenous liquid which contains a plurality of dissolved epoxy resin-forming components and epoxy resin-curing agents capable of subsequently forming and depositing a cured epoxy resin at the reservoir temperature and has a volume which is not significantly more than enough to fill the casing perforations and the cement tunnels; injecting a second aqueous liquid which is compatible with the liquid in the well and reservoir into the casing string; displacing the oleogenous liquid ahead of the second aqueous liquid so that the oleogenous liquid is driven to fill the casing perforations and the cement tunnels; maintaining the oleogenous liquid at least substantially stationary until a deposition of at least substantially cured epoxy resin has occurred substantially selectively within the casing perforations and the cement tunnels; injecting into the casing string a third aqueous liquid which is compatible with the liquid in the well and reservoir; flowing the third aqueous liquid into and out of contact with the casing perforations and the cement tunnels to displace the resin-forming components which are undeposited; and subsequently flowing the CO 2 -containing fluid through the resin coated casing perforations and the cement tunnels.
Claim 3
Dependent Claim
18 words
Process as claimed in claim 1 in which the epoxy resin is based on the glycidylether of bisphenol-A.
Claim 4
Dependent Claim
36 words
Process as claimed in claim 1 in which the perforation tunnels in the cement are coated by means of an oleogenous liquid coating fluid containing an epoxy resin, a polyamine and phenol in an organic solvent.
Claim 5
Dependent Claim
105 words
Process as claiemd in claim in which a retrievable packer with tail pipe is run on tubing and suspended above the highest perforation, the packer is set and brine is pumped down the tubing as the second aqueous liquid to chase the volume of the oleogenous liquid to fill the casing perforations and the cement tunnels, after the oleogenous liquid is maintained at least substantially stationary for 2 to 6 hours, the packer is released and brine is circulated as the third aqueous liquid to displace the resin-forming components which are undeposited, then the packer is pulled to the surface and the well further completed.
Claim 6
Dependent Claim
19 words
Process as claimed in claim 4, in which the retrievable packer is suspended 0.5-1.5 m above the highest perforation.
Claim 7
Dependent Claim
25 words
Process as claimed in claim 4 in which brine is circulated at a rate not exceeding 1 m 3 /min for at least two hours.
Claim 8
Dependent Claim
30 words
A process as claimed in claim 1 wherein the first, second and third aqueous liquids which are compatible with the liquid in the well and the reservoir are the same.
Claim 9
Independent Claim
216 words
A method for protecting a well completion having a cemented and perforated casing string from CO 2 degradation in which casing perforations and cement tunnels are coated after well completion by the method comprising: displacing debris from the casing perforations and the cement tunnels by flowing a well compatible aqueous liquid into and out of contact with the casing perforations and cement tunnels; suspending a retrievable packer with a tail pipe run on a tubing above the highest perforation in the casing; filling the casing perforations and the cement tunnels with an oleogenous liquid solution which includes an epoxy resin based on a glycidylether of bisphenol-A, a polyamine and phenol in an organic solvent and which is capable of subsequently forming and depositing a cured epoxy resin at the reservoir temperature, by chasing a volume of the oleogenous liquid solution, which is not significantly more than enough to fill the casing perforations and cement tunnels, with brine; maintaining the oleogenous liquid solution at least substantially stationary until a deposition of at least substantially cured epoxy resin has occurred substantially selectively within the casing perforations and the cement tunnels; releasing the packer and circulating brine into and out of contact with the casing perforations and the cement tunnels to displace undeposited epoxy resin; and removing the packer.
Claim 10
Independent Claim
216 words
A method for protecting a well completion having a cemented and perforated casing string from CO 2 degradation in which casing perforations and cement tunnels are coated after well completion by the method comprising: displacing debris from the casing perforations and the cement tunnels by flowing a well compatible aqueous liquid into and out of contact with the casing perforations and cement tunnels; suspending a retrievable packer with a tail pipe run on a tubing above the highest perforation in the casing; filling the casing perforations and the cement tunnels with an oleogenous liquid solution which includes an epoxy resin based on a glycidylether of bisphenol-A, a polyamine and phenol in an organic solvent and which is capable of subsequently forming and depositing a cured epoxy resin at the reservoir temperature, by chasing a volume of the oleogenous liquid solution, which is not significantly more than enough to fill the casing perforations and cement tunnels, with brine; maintaining the oleogenous liquid solution at least substantially stationary until a deposition of at least substantially cured epoxy resin has occurred substantially selectively within the casing perforations and the cement tunnels; releasing the packer and circulating brine into and out of contact with the casing perforations and the cement tunnels to displace undeposited epoxy resin; and removing the packer.
References Cited (Backward Citations)
US3123138A
Cited
US3172471A
Cited
US3339633A
Cited
US3455388A
Cited
US3437143A
Cited
US3552493A
Cited
US3747678A
Cited
US3743020A
Cited
US3709298A
Cited
US3820604A
Cited
US4189002A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1991-01-11 | 1991-07-13 | 1992-01-12 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1995-01-11 | 1995-07-13 | 1996-01-12 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1999-01-11 | 1999-07-13 | 2000-01-12 | $7700.00 | Window Closed / Lapsed |