Claims Analysis
Total Claims: 23
Claim 1
Independent Claim
175 words
A method for controlling soot blowers in a boiler which comprises: assigning the sootblowers into a plurality of groups, the sootblowers within a group being generally adjacent to each other and covering heat transfer surfaces having similar fouling deposit formation characteristics; assigning a weight factor to each individual sootblower in every group, said weight factors determining the frequency of operation of each sootblower as a percentage of all sootblowing cycles so that not all of the sootblowers are blown every sootblowing cycle; determining which sootblowers within a group are to be blown in any given sootblowing cycle using a spreading algorithm; and beginning every sootblowing cycle in the boiler with the most upstream sootblower group and proceeding progressively with sootblowing through all other groups in the direction of flow of combustion gases until reaching the most downstream sootblower group in order to sweep dislodged fouling deposits from the upstream heat transfer surfaces in the direction of flow of combustion gases, whereby the boiler is maintained at or near maximum efficiency with reduced sootblowing steam usage.
Claim 2
Independent Claim
175 words
A method for controlling soot blowers in a boiler which comprises: assigning the sootblowers into a plurality of groups, the sootblowers within a group being generally adjacent to each other and covering heat transfer surfaces having similar fouling deposit formation characteristics; assigning a weight factor to each individual sootblower in every group, said weight factors determining the frequency of operation of each sootblower as a percentage of all sootblowing cycles so that not all of the sootblowers are blown every sootblowing cycle; determining which sootblowers within a group are to be blown in any given sootblowing cycle using a spreading algorithm; and beginning every sootblowing cycle in the boiler with the most upstream sootblower group and proceeding progressively with sootblowing through all other groups in the direction of flow of combustion gases until reaching the most downstream sootblower group in order to sweep dislodged fouling deposits from the upstream heat transfer surfaces in the direction of flow of combustion gases, whereby the boiler is maintained at or near maximum efficiency with reduced sootblowing steam usage.
Claim 3
Dependent Claim
84 words
The method of claim 1 which further comprises: providing instrumentation indicating heat transfer characteristics of at least some of the heat transfer surfaces associated with the sootblower groups; noting any change in said heat transfer characteristics over time; entering said change in heat transfer characteristics into a biasing algorithm to provide a heat transfer biasing factor; and modifying the sootblower weight factors with the heat transfer biasing factor to provide on-line compensation for real time deviations from an expected rate of heat transfer change.
Claim 4
Dependent Claim
83 words
The method of claim 1 which further comprises: providing instrumentation indicating gas side pressure drop across at least some of the heat transfer surfaces associated with the sootblower groups; noting any change in said pressure drop over time; entering said change in pressure drop into a biasing algorithm to provide a pressure drop biasing factor; and modifying the sootblower weight factors with the pressure drop biasing factor to provide on-line compensation for real time deviations from an expected rate of pressure drop change.
Claim 5
Dependent Claim
104 words
The method of claim 1 which further comprises: providing instrumentation indicating heat transfer characteristics of, and gas side pressure drop across, at least some of the heat transfer surfaces associated with the sootblower groups; noting any change in said heat transfer characteristics and gas side pressure drop over time; entering said change in heat transfer characteristics or pressure drop into a biasing algorithm to provide a combined heat transfer and pressure drop biasing factor; and modifying the sootblower weight factors with the combined biasing factor to provide on-line compensation for real time deviations from the expected rate of heat transfer or pressure drop change.
Claim 6
Dependent Claim
36 words
The method of claim 2 which further includes averaging the change in measured heat transfer characteristics over a period of at least half of a nominal sootblowing cycle before entering said change into the biasing algorithms.
Claim 7
Dependent Claim
35 words
The method of claim 3 which further includes averaging the change in measured pressure drop over a period of at least half of a nominal sootblowing cycle before entering said change into the biasing algorithms.
Claim 8
Dependent Claim
39 words
The method of claim 4 which further includes averaging the change in measured heat transfer characteristics and pressure drop over a period of at least half of a nominal sootblowing cycle before entering said change into the biasing algorithms.
Claim 9
Dependent Claim
17 words
The method of claim 2 which includes using the heat transfer information in a feedback-type control system.
Claim 10
Dependent Claim
17 words
The method of claim 3 which includes using the pressure drop information in a feedback-type control system.
Claim 11
Dependent Claim
20 words
The method of claim 4 which includes using the heat transfer and pressure drop information in a feedback-type control system.
Claim 12
Dependent Claim
68 words
The method of claim 1 which further comprises: providing instrumentation generally relating to changes in boiler operating characteristics; noting any change in said operating characteristics over time; entering said change in operating characteristics into a biasing algorithm to provide an operating characteristic biasing factor; and using the operating condition biasing factor to modify the sootblower weight factors and provide on-line compensation for real time changes in boiler operation.
Claim 13
Dependent Claim
22 words
The method of claim 11 in which the information relating to boiler operating characteristics is used in a feed forward-type control system.
Claim 14
Dependent Claim
33 words
The method of claim 11 in which the information relating to boiler operating characteristics is combined with the information relating to heat transfer characteristics in a combined feedback and feed forward-type control system.
Claim 15
Dependent Claim
33 words
The method of claim 11 in which the information relating to boiler operating characteristics is combined with the information relating to pressure drop change in a combined feedback and feed forward-type control system.
Claim 16
Dependent Claim
37 words
The method of claim 11 in which the information relating to boiler operating characteristics is combined with the information relating to heat transfer characteristics and pressure drop change in a combined feedback and feed forward-type control system.
Claim 17
Dependent Claim
32 words
The method of claim 1 in which the spreading algorithm uses estimated present and next blowing cycle fouling load on the tubes within a sootblower group to determine which sootblowers are blown.
Claim 18
Dependent Claim
27 words
The method of claim 1 in which heat transfer changes in heat transfer surfaces associated with sootblower groups are used as an indicator of boiler tube fouling.
Claim 19
Dependent Claim
27 words
The method of claim 1 in which pressure drop changes across heat transfer surfaces associated with sootblower groups are used as an indicator of boiler tube fouling.
Claim 20
Dependent Claim
19 words
The method of claim 1 in which boiler operating characteristics are used as an estimator of boiler tube fouling.
Claim 21
Dependent Claim
45 words
The method of claim 1 in which the sootblowing cycle time is determined by selecting a sootblowing steam rate usage between 10 and 100% of available steam and entering said steam rate usage into a cycle time algorithm along with the unbiased sootblower weight factor.
Claim 22
Dependent Claim
24 words
The method of claim 20 in which the steam rate usage is selected within the limits of 40% to 100% of available sootblowing steam.
Claim 23
Dependent Claim
25 words
The method of claim 20 in which the steam rate usage selected determines whether sootblower pairs are blown simultaneously or sequentially during a sootblowing cycle.