Procedure for permanently storing radioactive material

Assignee: Individual
•
Filing: 1982-06-09
•
Granted: 1987-10-20
•
Expires: 2002-06-09
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract The invention provides for a procedure for permanently storing radioactive material in a rock chamber, comprising an enclosed construction (4) completely separated from the walls, floor and ceiling of the rock, made of permanent material impervious to water, in which materials in encapsulated (9) form are stored, and the outer spacing between the walls, ceiling and floor of the rock and the construction is completely filled with material not impervious to water (5). In the invention, the encapsulated material is placed inside the construction by means of a robot (10) on both sides of a track provided for the robot. When the construction is totally or partially filled with material, the construction or part of it containing material is sealed with bentonite or similar, leaving a passage (13) for the robot in the construction, which passage is filled with water-displacing material that is easy to dig. When the construction is completely filled, it is sealed up and the robot (10) is lifted up through a lift-shaft (3) connecting the construction with ground-level. The lift-shaft is sealed at least at the level of the construction and at ground-level.

Inventors

  • 👤 John Canevall

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-28 17:54
CPC Classifications
G; G21; G21F; G21F5/00; G21F5/005; G21F9/00; G21F9/28; G21F9/34

Claims Analysis

Total Claims: 7
Claim 1
Independent Claim 220 words
A method of storing radioactive material in a hollow construction having an access opening, the construction being located below the surface of the ground within a rock chamber, said chamber having walls, a floor, and a ceiling; said construction being completely spaced from the walls, floor, and ceiling of the rock chamber to form an outer spacing, and said construction being made of material impervious to water, the construction comprising a capsule storage area and a capsule handling passageway adjacent thereto having a track and being connected to a lift-shaft running to the surface, the method including the steps of: completely filling the outer spacing between the walls, ceiling, and floor of the rock chamber and the construction with material not impervious to water; placing capsules containing the radioactive waste in encapsulated form into the capsule storage area; filling the storage area around the loaded capsule with a sealing material to enclose the capsules; repeating the placing and filling steps until the storage area has been completely filled in with the capsules and sealing material; loading the passageway adjacent the storage area with a removable material different than the sealing material; closing the construction and sealing the lift-shaft at least at the construction level and at ground level; and providing means for collecting any water penetrating into the outer spacing.
Claim 2
Independent Claim 220 words
A method of storing radioactive material in a hollow construction having an access opening, the construction being located below the surface of the ground within a rock chamber, said chamber having walls, a floor, and a ceiling; said construction being completely spaced from the walls, floor, and ceiling of the rock chamber to form an outer spacing, and said construction being made of material impervious to water, the construction comprising a capsule storage area and a capsule handling passageway adjacent thereto having a track and being connected to a lift-shaft running to the surface, the method including the steps of: completely filling the outer spacing between the walls, ceiling, and floor of the rock chamber and the construction with material not impervious to water; placing capsules containing the radioactive waste in encapsulated form into the capsule storage area; filling the storage area around the loaded capsule with a sealing material to enclose the capsules; repeating the placing and filling steps until the storage area has been completely filled in with the capsules and sealing material; loading the passageway adjacent the storage area with a removable material different than the sealing material; closing the construction and sealing the lift-shaft at least at the construction level and at ground level; and providing means for collecting any water penetrating into the outer spacing.
Claim 3
Dependent Claim 34 words
A method as in claim 1 wherein handling of the encapsulated radioactive material is carried out with the help of a robot, which is lifted up through the lift-shaft when the construction is filled.
Claim 4
Dependent Claim 25 words
A method as in claim 1 or 2, wherein the encapsulated material is placed in one or more rows along each side of the track.
Claim 5
Dependent Claim 106 words
A method as in claim 2 wherein when a fault in a material capsule is indicated, with undersired radioactive leakage as a consequence, the robot is lowered through the lift shaft and made to break its way into the construction and dig its way through the passage up to the faulty capsule, where the filling material is removed by the robot up to the capsule which is then transported by the robot to a place selected for any further treatment that may be required, and that the construction and the tunnel are filled up again and resealed when the leakage is considered to have been rectified.
Claim 6
Dependent Claim 42 words
A method as in claim 1 or 2 wherein an initial barrier is placed under the material capsule in the form of a checking vessel, in which any leakage from the capsule is collected, such leakage being indicated by a measuring device.
Claim 7
Dependent Claim 43 words
A method as in claim 1 or 2 wherein means is provided for checking the degree of purity of the water that has penetrated into the non-impervious material between the construction and the rock chamber as necessary by measuring instruments at ground level.

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1990-10-19 1991-04-20 1991-10-20 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1994-10-19 1995-04-20 1995-10-20 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1998-10-19 1999-04-20 1999-10-20 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag