← Back to Patent Explorer
US4698590A Expired / Lapsed US ⏱️ 0.0 years remaining

Method and apparatus for measuring velocity of ferromagnetic tubing

Assignee: Varco LP
•
Filing: 1986-03-24
•
Granted: 1987-10-06
•
Expires: 2006-03-24
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A tubing trip tool for use in determining the extent of defects in tubular elements comprising a continuous string used in a subterranean oil or gas well during removal of the string from the well is disclosed. Local defects and axially extending defects, as well as the average wall thickness of the tubular elements, are measured. The position of the defects is determined by measuring the variable velocity of the tubular elements as they are removed from the well. A noncontact velocity detector comprises detector elements generating a first signal dependent upon an applied magnetic field and the velocity of the tubular elements. The first signal is compared to a signal dependent only upon the magnetic field generated in a second element. A pickup coil and Hall effect probes can be used.

Inventors

  • 👤 Gordon L. Moake
  • 👤 Marvin Milewits

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-07 11:13
CPC Classifications
E; E21; E21B; E21B19/00; E21B19/20; E21B17/00; E21B17/006; E21B47/00; E21B47/006; E21B47/08; E21B47/085; G; G01; G01N; G01N27/00; G01N27/72

Claims Analysis

Total Claims: 14
Claim 1
Independent Claim 156 words
A method of measuring the axial velocity of a relatively moving ferromagnetic element, comprising: applying a uniform magnetic field to a portion of the element; producing a first signal dependent upon the axial velocity of the element relative to the uniform magnetic field and upon magnetic leakage field emanating from the element as a result of axial changes in the magnetic properties of the element; producing a second signal dependent upon the magnetic leakage fields emanating from the element as a result of axial changes in the magnetic properties of the element and at least substantially insensitive to the axial velocity of the element relative to the uniform magnetic field; substantially simultaneoulsy producing the first and second signals by a plurality of sensors each providing a voltage output functionally related to magnetic flux leakage density of the magnetic leakage fields; and comparing the first and second signals to measure the axial velocity of the tubular element.
Claim 2
Independent Claim 156 words
A method of measuring the axial velocity of a relatively moving ferromagnetic element, comprising: applying a uniform magnetic field to a portion of the element; producing a first signal dependent upon the axial velocity of the element relative to the uniform magnetic field and upon magnetic leakage field emanating from the element as a result of axial changes in the magnetic properties of the element; producing a second signal dependent upon the magnetic leakage fields emanating from the element as a result of axial changes in the magnetic properties of the element and at least substantially insensitive to the axial velocity of the element relative to the uniform magnetic field; substantially simultaneoulsy producing the first and second signals by a plurality of sensors each providing a voltage output functionally related to magnetic flux leakage density of the magnetic leakage fields; and comparing the first and second signals to measure the axial velocity of the tubular element.
Claim 3
Dependent Claim 18 words
The method of claim 1 wherein the voltage output of the second signal is generated by Hall effect.
Claim 4
Independent Claim 193 words
A method of measuring the axial velocity of tubing sections, comprising a continuous tubing string used in a subterranean well bore, at the well head as the tubing string travels into and out of the well bore, comprising the steps of: applying a uniform magnetic field to the tubing sections at the well head as the tubing string is moved into or out of the well bore; producing a first signal dependent upon the axial velocity of each tubing section relative to the well head and upon magnetic leakage fields emanating from each tubing section as a result of axial changes in the magnetic properties of each tubing section; producing a second electrical signal dependent upon the changing magnetic leakage fields emanating from each tubing section as a result of axial changes in the magnetic properties of each tubing section and at least substantially insensitive to the axial velocity of the tubular element relative to the uniform magnetic field, the voltage output of the second electrical signal being generated by Hall effect; and comparing the first and second signals to measure the axial velocity of each tubular section relative to the well head.
Claim 5
Independent Claim 193 words
A method of measuring the axial velocity of tubing sections, comprising a continuous tubing string used in a subterranean well bore, at the well head as the tubing string travels into and out of the well bore, comprising the steps of: applying a uniform magnetic field to the tubing sections at the well head as the tubing string is moved into or out of the well bore; producing a first signal dependent upon the axial velocity of each tubing section relative to the well head and upon magnetic leakage fields emanating from each tubing section as a result of axial changes in the magnetic properties of each tubing section; producing a second electrical signal dependent upon the changing magnetic leakage fields emanating from each tubing section as a result of axial changes in the magnetic properties of each tubing section and at least substantially insensitive to the axial velocity of the tubular element relative to the uniform magnetic field, the voltage output of the second electrical signal being generated by Hall effect; and comparing the first and second signals to measure the axial velocity of each tubular section relative to the well head.
Claim 6
Dependent Claim 48 words
The method of claim 3, further comprising the steps of: magnetically saturating a portion of the tubular element to detect axial thickness variations; detecting magnetic flux leakage changes to measure the depth of localized defects; and applying an additional magnetic field to detect axially-extending defects in the element.
Claim 7
Dependent Claim 37 words
The method of claim 3, wherein the first and second signals are produced substantially simultaneously by a plurality of sensors each providing a voltage output functionally related to magnetic flux leakage density of the magnetic leakage fields.
Claim 8
Dependent Claim 31 words
The method of claim 4, further comprising the step of: determining the axial location of measured defects by detecting the ends of each tubular section and integrating the axial velocity measurement.
Claim 9
Dependent Claim 183 words
A tubing trip tool for measuring the velocity of tubing sections, comprising a continuous tubing string used in a subterranean well bore, at the well head as the tubing string travels into and out of the well bore, comprising: electric coil means traversely spaced from the tubing sections of the well head and encircling the tubing sections for applying a uniform magnetic field during axial movement thereof relative to the well head; means for providing a first signal dependent upon the velocity of the tubing section relative to the uniform magnetic field and upon the changing magnetic leakage fields emanating from the tubing section as a result of axial changes in the magnetic properties of the tubing section; means for producing a second signal dependent upon the magnetic leakage fields emanating ferom the element as a result of axial changes in the magnetic properties of the element and at least substantially insensitive to the axial velocity of the tubular element relative to the uniform magnetic field; and means for comparing the first and second signals to measure the velocity of the tubing section.
Claim 10
Dependent Claim 183 words
A tubing trip tool for measuring the velocity of tubing sections, comprising a continuous tubing string used in a subterranean well bore, at the well head as the tubing string travels into and out of the well bore, comprising: electric coil means traversely spaced from the tubing sections of the well head and encircling the tubing sections for applying a uniform magnetic field during axial movement thereof relative to the well head; means for providing a first signal dependent upon the velocity of the tubing section relative to the uniform magnetic field and upon the changing magnetic leakage fields emanating from the tubing section as a result of axial changes in the magnetic properties of the tubing section; means for producing a second signal dependent upon the magnetic leakage fields emanating ferom the element as a result of axial changes in the magnetic properties of the element and at least substantially insensitive to the axial velocity of the tubular element relative to the uniform magnetic field; and means for comparing the first and second signals to measure the velocity of the tubing section.
Claim 11
Dependent Claim 31 words
The tool of claim 7 wherein the means for producing the first signal comprises means for detecting magnetic flux leakage density of the magnetic leakage fields induced in each tubing section.
Claim 12
Dependent Claim 33 words
The tool of claim 7, wherein the means for applying a uniform magnetic field comprises electric coil means traversely spaced from the tubing sections at the well head and encircling the tubing section.
Claim 13
Dependent Claim 60 words
The tool of claim 7, further comprising: means for magnetically saturating a portion of the tubular element to detect axial thickness variations in the tubing sections; means for detecting magnetic flux leakage changes to measure the depth of localized defects in the tubing sections; and means for applying an additional magnetic field to detect axially-extending defects in the tubing sections.
Claim 14
Dependent Claim 30 words
The tool of claim 10 further comprising: means for determining the axial location of measured defects by detecting the ends of each tubular section and integrating the axial velocity measurement.

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1990-10-05 1991-04-06 1991-10-06 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1994-10-05 1995-04-06 1995-10-06 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1998-10-05 1999-04-06 1999-10-06 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag