Method of operating a combined cycle electric power plant

Assignee: ACEC POWER SYSTEMS Ltd
•
Filing: 1986-08-25
•
Granted: 1987-09-15
•
Expires: 2006-08-25
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A method of operating a combined cycle electric power plant at a measuring and regulating station of a gas transmission line is disclosed where gas at high pressure is being delivered from the transmission line to a lower pressure line, such as a gas distribution system, comprising the steps of supplying a portion of the gas to the combustion chamber of a gas turbine to drive a first electrical generator and produce electricity, using the hot gases in the exhaust of the gas turbine to heat water in a boiler and produce steam, supplying the steam to a steam turbine to drive a second electrical generator and produce electricity, reducing the pressure of the gas being delivered to the pressure of the lower pressure line, and using the heat of condensation of the exhaust steam from the steam turbine to keep the temperature of the gas at or above a selected minimum as the pressure of the gas is reduced from that of the high pressure line to the pressure of the lower pressure line. In one embodiment of the method, the pressure of the delivered gas is reduced by passing the gas through a turboexpander and using the output energy of the turboexpander to drive a third electrical generator and produce electricity.

Inventors

  • 👤 George S. McLean
  • 👤 Paul J. Grimes
  • 👤 Albert van Gucht

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-30 14:09
CPC Classifications
F; F02; F02C; F02C1/00; F01; F01K; F01K23/00; F01K23/02; F01K23/06; F01K23/10; F01K9/00; F01K9/003; Y; Y02; Y02E; Y02E20/00; Y02E20/16

Claims Analysis

Total Claims: 8
Claim 1
Independent Claim 157 words
A method of generating electricity where gas from a high pressure gas transmission line is being delivered to a lower pressure line, such as a gas distribution system, comprising the steps of supplying a portion of the gas to the combustion chamber of a gas turbine to drive a first electrical generator and produce electricity, using the hot gases in the exhaust of the gas turbine to heat water in a boiler and produce steam, supplying the steam to a steam turbine to drive a second electrical generator and produce electricity, reducing the pressure of the gas being delivered to the pressure of the low pressure line, and using the heat of condensation of the exhaust steam from the steam turbine to keep the temperature of the gas at or above a selected minimum as the pressure of the gas is reduced from that of the high pressure line to the pressure of the lower pressure line.
Claim 2
Independent Claim 157 words
A method of generating electricity where gas from a high pressure gas transmission line is being delivered to a lower pressure line, such as a gas distribution system, comprising the steps of supplying a portion of the gas to the combustion chamber of a gas turbine to drive a first electrical generator and produce electricity, using the hot gases in the exhaust of the gas turbine to heat water in a boiler and produce steam, supplying the steam to a steam turbine to drive a second electrical generator and produce electricity, reducing the pressure of the gas being delivered to the pressure of the low pressure line, and using the heat of condensation of the exhaust steam from the steam turbine to keep the temperature of the gas at or above a selected minimum as the pressure of the gas is reduced from that of the high pressure line to the pressure of the lower pressure line.
Claim 3
Dependent Claim 33 words
The method of claim 1 in which the pressure of the delivered gas is reduced by passing the gas through a turboexpander and the turboexpander drives a third electrical generator and produces electricity.
Claim 4
Dependent Claim 23 words
The method of claim 1 in which the pressure of the delivered gas is reduced by passing the gas through a throttling valve.
Claim 5
Independent Claim 27 words
The method of claims 2 or 3 in which the gas is heated by the heat of condensation of the exhaust steam before its pressure is reduced.
Claim 6
Independent Claim 19 words
The method of claims 2 or 3 in which the gas is heated after the pressure has been reduced.
Claim 7
Dependent Claim 31 words
The method of claim 2 in which the turboexpander has a plurality of stages and the gas is heated by the heat of condensation of the exhaust steam before each stage.
Claim 8
Dependent Claim 31 words
The method of claim 6 in which the gas is also heated by the heat of condensation of the exhaust steam after it passes through the last stage of the turboexpander.

References Cited (Backward Citations)

US3525218A Cited
US3704587A Cited
US4058974A Cited
US4418530A Cited
US4321790A Cited
US4273508A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1990-09-14 1991-03-16 1991-09-15 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1994-09-14 1995-03-16 1995-09-15 $3760.00 Window Closed / Lapsed