US4686853A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Method for the prediction and detection of condenser fouling
Assignee: Public Service Electric and Gas Co
•
Filing: 1985-06-17
•
Granted: 1987-08-18
•
Expires: 2005-06-17
Abstract
Abstract A method for the detection of waterside fouling conditions in plant condensers and the differentiation between types of fouling conditions is described. The operating conditions of a pilot scale condenser are continuously matched to the dynamic operating conditions of a plant condenser and performance features (such as OHTR and pressure drop) are monitored and compared, thereby indicating to the plant operator whether fouling is occuring and, if so, whether there is macrofouling or microfouling.
Inventors
- 👤 Richard J. Sugam
- 👤 Herbert S. Arnold
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-05 02:29
CPC Classifications
G; G01; G01N; G01N17/00; G01N17/008
Claims Analysis
Total Claims: 11
Claim 1
Independent Claim
207 words
A method for the prediction and detection of fouling of condenser tubes during the operation of a condenser comprising: measuring the drop in pressure across the condenser tubes of a substantially clean, unfouled main condenser unit to establish a baseline cooling water pressure drop for the main condenser unit; and measuring the drop in pressure across the condenser tubes of a substantially clean, unfouled pilot-scale condenser unit which is operated so as to approximate the environment on the cooling water side of the plant condenser to establish a baseline cooling water pressure drop for the pilot-scale condenser unit; and operating said main condenser unit and said pilot-scale condenser unit while continuously measuring the pressure drop across each unit such that an approximately simultaneous and proportional increase in pressure drop across both the main condenser and the pilot-scale condenser indicates that the condenser tubes are becoming microfouled and that an increase in pressure drop across only one unit indicates that only the unit demonstrating the increased pressure drop is subject to macrofouling and an approximately simultaneous but significantly disproportionate pressure drop in both units indicates that (1) both units are becoming microfouled and (2) the unit with the greater increase in pressure drop is also subject to macrofouling.
Claim 2
Independent Claim
207 words
A method for the prediction and detection of fouling of condenser tubes during the operation of a condenser comprising: measuring the drop in pressure across the condenser tubes of a substantially clean, unfouled main condenser unit to establish a baseline cooling water pressure drop for the main condenser unit; and measuring the drop in pressure across the condenser tubes of a substantially clean, unfouled pilot-scale condenser unit which is operated so as to approximate the environment on the cooling water side of the plant condenser to establish a baseline cooling water pressure drop for the pilot-scale condenser unit; and operating said main condenser unit and said pilot-scale condenser unit while continuously measuring the pressure drop across each unit such that an approximately simultaneous and proportional increase in pressure drop across both the main condenser and the pilot-scale condenser indicates that the condenser tubes are becoming microfouled and that an increase in pressure drop across only one unit indicates that only the unit demonstrating the increased pressure drop is subject to macrofouling and an approximately simultaneous but significantly disproportionate pressure drop in both units indicates that (1) both units are becoming microfouled and (2) the unit with the greater increase in pressure drop is also subject to macrofouling.
Claim 3
Dependent Claim
34 words
The method of claim 1 wherein said pilot-scale condenser unit draws cooling water from the cooling water inlet of said main condenser and discharges its cooling water into the outlet of the main condenser.
Claim 4
Dependent Claim
47 words
The method of claim 1 wherein the operating conditions of the pilot-scale condenser are continuously adjusted so as to conform to the operating conditions of the main condenser and wherein the condenser tubes of both condensers are subjected to the same cleaning treatments to remove microfouling materials.
Claim 5
Dependent Claim
42 words
The method of claim 3 wherein the operating conditions are selected from the group consisting of: the condenser cooling water outlet temperature, concentration of microfouling control agents in the cooling water and the type of microfouling control agents in the cooling water.
Claim 6
Dependent Claim
46 words
The method of claim 1 comprising the further steps of: straining the cooling water entering said pilot-scale condenser and; removing promptly all material strained out of the water entering the pilot-scale condenser such that no macrofouling material is permitted to accumulate in the pilot condenser unit.
Claim 7
Dependent Claim
62 words
The method of claim 1 comprising the further steps of: calculating the OHTR of the substantially clean, unfouled pilot-scale condenser to establish a baseline OHTR for the pilot-scale condenser and; continuously calculating the OHTR of the pilot-scale condenser during its operation such that any change in the OHTR of the pilot condenser indicates a change in the fouling condition of the condenser.
Claim 8
Dependent Claim
47 words
The method of claim 2 when the operating conditions of the pilot-scale condenser are continuously adjusted so as to conform to the operating conditions of the main condenser and wherein the condenser tubes of both condensers are subjected to the same cleaning treatments to remove microfouling materials.
Claim 9
Dependent Claim
43 words
The method of claim 7 wherein said operating conditions are selected from the group consisting of: the condenser cooling water outlet temperature, the concentration of microfouling control agents in the cooling water and the type of microfouling control agent in the cooling water.
Claim 10
Dependent Claim
45 words
The method of claim 7 comprising the further steps of: straining the cooling water entering said pilot-scale condenser and; removing promptly all material strained out of the water entering the pilot-scale condenser such that no microfouling is permitted to accumulate in the pilot condenser unit.
Claim 11
Dependent Claim
61 words
The method of claim 7 comprising the further steps of: calculating the OHTR of the substantially clean, unfouled pilot-scale condenser to establish a baseline OHTR for the pilot-scale condenser; continuously calculating the OHTR of the pilot-scale condenser during its operation such that any change in the OHTR of the pilot condenser indicates a change in the fouling condition of the condenser.
References Cited (Backward Citations)
US3552189A
Cited
US4044605A
Cited
US4176544A
Cited
GB2068540A
Cited
US4339945A
Cited
US4346587A
Cited
US4521864A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1990-08-17 | 1991-02-16 | 1991-08-18 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1994-08-17 | 1995-02-16 | 1995-08-18 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1998-08-17 | 1999-02-16 | 1999-08-18 | $7700.00 | Window Closed / Lapsed |