Claims Analysis
Total Claims: 17
Claim 1
Independent Claim
205 words
A method of controlling supercharge pressure for a turbocharger which comprises the steps of: (a) seeking basic control amounts of BASE1 and BASE2 from a look-up table in accordance with an intake air flow rate Qa; (b) calculating the deviation ΔP=P set-P2 between a preset supercharge pressure P set and the actual supercharge pressure P2 detected and obtaining each of proportional values PROP1=KΔP and PROP2=K2. ΔP, where K1 and K2 indicate a first and a second constant, respectively, from the deviation ΔP thus obtained; (c) determining if the actual supercharge pressure P2 is larger than a predetermined value of the supercharge pressure; (d) determining if the actual air flow rate Qa is larger than a predetermined value of Qa2, from the result of said first mentioned determination; (e) selectively calculating each of intergral values INT1=K3.ΣΔP and INT2=K4.ΣΔP, where K3 and K4 indicate a third and forth constant, respectively; (f) further selectively calculating each of duty values OUT1=BASE1+PROP1+INT1 and OUT2=BASE2+PROP2+INT2 in accordance with the result of said first and second mentioned determinations; and (g) selectively controlling first and second electromagnetic valves for a capacity changing means and an exhaust bypass valve means in accordance with first and second control signals having the duty values thus calculated.
Claim 2
Independent Claim
205 words
A method of controlling supercharge pressure for a turbocharger which comprises the steps of: (a) seeking basic control amounts of BASE1 and BASE2 from a look-up table in accordance with an intake air flow rate Qa; (b) calculating the deviation ΔP=P set-P2 between a preset supercharge pressure P set and the actual supercharge pressure P2 detected and obtaining each of proportional values PROP1=KΔP and PROP2=K2. ΔP, where K1 and K2 indicate a first and a second constant, respectively, from the deviation ΔP thus obtained; (c) determining if the actual supercharge pressure P2 is larger than a predetermined value of the supercharge pressure; (d) determining if the actual air flow rate Qa is larger than a predetermined value of Qa2, from the result of said first mentioned determination; (e) selectively calculating each of intergral values INT1=K3.ΣΔP and INT2=K4.ΣΔP, where K3 and K4 indicate a third and forth constant, respectively; (f) further selectively calculating each of duty values OUT1=BASE1+PROP1+INT1 and OUT2=BASE2+PROP2+INT2 in accordance with the result of said first and second mentioned determinations; and (g) selectively controlling first and second electromagnetic valves for a capacity changing means and an exhaust bypass valve means in accordance with first and second control signals having the duty values thus calculated.
Claim 3
Dependent Claim
29 words
The method as set forth in claim 1 wherein the method further comprises the step of limiting the integral control amounts INT1 and INT2 within a predetermined values, respectively.
Claim 4
Dependent Claim
19 words
The method as set forth in claim 1 wherein said predetermined value of the supercharge pressure is 320 mmHg.
Claim 5
Dependent Claim
18 words
The method as set forth in claim 1 wherein said preset supercharge pressure P set is 375 mmHg.
Claim 6
Independent Claim
235 words
A method of controlling supercharge pressure for a turbocharger of an engine which comprises the steps of: (a) setting up a first predetermined value of supercharge pressure close to but below a preset supercharge pressure (P set); (b) independently performing a proportional control of a capacity changing means for controlling exhaust gas flow to a turbine of a turbocharger and a proportional control of an exhaust bypass valve for bypassing exhaust gas flow around said turbine in a first control zone beginning from a time point (T1) at which an accelerator is operated until an actual supercharge pressure reaches said first predetermined value in accordance with first and second control signals having duty values of OUT1 OUT2; (c) performing a proportional plus integral control of only said capacity changing means for the turbine in a second control zone beginning from the first predetermined value until an actual air flow rate to said engine reaches a first predetermined air flow rate in accordance with the first control signal, with the proportional control being maintained at the exhaust bypass valve in response to the second signal; and (d) performing the proportional plus integral control of only said exhaust bypass valve in a third control zone after reaching said predetermined air flow rate in accordance with the second control signal, with the proportional control being maintained for the capacity changing means in response to the first control signal.
Claim 7
Independent Claim
235 words
A method of controlling supercharge pressure for a turbocharger of an engine which comprises the steps of: (a) setting up a first predetermined value of supercharge pressure close to but below a preset supercharge pressure (P set); (b) independently performing a proportional control of a capacity changing means for controlling exhaust gas flow to a turbine of a turbocharger and a proportional control of an exhaust bypass valve for bypassing exhaust gas flow around said turbine in a first control zone beginning from a time point (T1) at which an accelerator is operated until an actual supercharge pressure reaches said first predetermined value in accordance with first and second control signals having duty values of OUT1 OUT2; (c) performing a proportional plus integral control of only said capacity changing means for the turbine in a second control zone beginning from the first predetermined value until an actual air flow rate to said engine reaches a first predetermined air flow rate in accordance with the first control signal, with the proportional control being maintained at the exhaust bypass valve in response to the second signal; and (d) performing the proportional plus integral control of only said exhaust bypass valve in a third control zone after reaching said predetermined air flow rate in accordance with the second control signal, with the proportional control being maintained for the capacity changing means in response to the first control signal.
Claim 8
Dependent Claim
24 words
The method as set forth in claim 5 wherein said first predetermined value is 320 mmHg and said preset supercharge pressure is 375 mmHg.
Claim 9
Dependent Claim
200 words
A supercharge pressure control apparatus for a turbocharger which comprises: (a) a plurality of detecting means for detecting a plurality of operating conditions of the engine including crank angle, air flow rate, supercharge pressure, and throttle valve opening; (b) capacity changing means provided at a guide path of an exhaust pipe and having a shaft member coupled through arm and rod means to a first actuator; (c) an exhaust bypass valve provided at an exhaust manifold and having linkage means coupled to a second actuator; (d) a first electromagnetic valve provided at a first liaison pipe for controlling said first actuator in accordance with a first control signal having a duty value of OUT1; (e) a second electromagnetic valve provided at a second liaison pipe for controlling said second actuator in accordance with a second control signal having a duty value of OUT2; and (f) an electronic control unit having a microprocessor including a CPU, a ROM, a RAM, an A/D converter, and an input/output interface for producing said first and second control signals and for selectively controlling said first and second electromagnetic values in accordance with the operating conditions of the engine detected by said plurality of detecting means.
Claim 10
Dependent Claim
200 words
A supercharge pressure control apparatus for a turbocharger which comprises: (a) a plurality of detecting means for detecting a plurality of operating conditions of the engine including crank angle, air flow rate, supercharge pressure, and throttle valve opening; (b) capacity changing means provided at a guide path of an exhaust pipe and having a shaft member coupled through arm and rod means to a first actuator; (c) an exhaust bypass valve provided at an exhaust manifold and having linkage means coupled to a second actuator; (d) a first electromagnetic valve provided at a first liaison pipe for controlling said first actuator in accordance with a first control signal having a duty value of OUT1; (e) a second electromagnetic valve provided at a second liaison pipe for controlling said second actuator in accordance with a second control signal having a duty value of OUT2; and (f) an electronic control unit having a microprocessor including a CPU, a ROM, a RAM, an A/D converter, and an input/output interface for producing said first and second control signals and for selectively controlling said first and second electromagnetic values in accordance with the operating conditions of the engine detected by said plurality of detecting means.
Claim 11
Dependent Claim
24 words
The supercharge pressure control apparatus as set forth in claim 7 wherein various numerical data are stored in the ROM as a control program.
Claim 12
Dependent Claim
31 words
The supercharge pressure control apparatus as set forth in claim 7 wherein a look-up table relating to basic control amounts to the intake air flow rate is stored in the ROM.
Claim 13
Dependent Claim
142 words
A supercharge pressure control apparatus for a turbocharger of an engine which comprises: (a) means for detecting operating conditions of the engine; (b) supercharge detecting means for detecting supercharge pressure; (c) deviation calculating means for calculating the deviation between the actual supercharge pressure detected and a preset supercharge pressure; (d) first and second control amount operational means for calculating each of the control amounts for a capacity changing means and for an exhaust bypass valve means in accordance with parameters including the deviation and the operating conditions of the engine; and (e) operation zone determining means for determining a particular operation zone in which a feedback control is performed, so as to selectively calculate the control amount in either one of said first and said second control amount operational means in accordance with the deviation, based on the result of the determination.
Claim 14
Dependent Claim
142 words
A supercharge pressure control apparatus for a turbocharger of an engine which comprises: (a) means for detecting operating conditions of the engine; (b) supercharge detecting means for detecting supercharge pressure; (c) deviation calculating means for calculating the deviation between the actual supercharge pressure detected and a preset supercharge pressure; (d) first and second control amount operational means for calculating each of the control amounts for a capacity changing means and for an exhaust bypass valve means in accordance with parameters including the deviation and the operating conditions of the engine; and (e) operation zone determining means for determining a particular operation zone in which a feedback control is performed, so as to selectively calculate the control amount in either one of said first and said second control amount operational means in accordance with the deviation, based on the result of the determination.
Claim 15
Dependent Claim
70 words
The supercharge pressure control apparatus as set forth in claim 10 wherein among calculations of the control amounts corresponding to the deviation, only the calculation of an integral portion proportional to the integral value of the deviation is selectively performed either in said first control amount operational means or in said second control amount operational means in accordance with the result of the determination in said operation zone determining means.
Claim 16
Dependent Claim
162 words
A supercharge pressure control apparatus for a turbocharger as claimed in claim 10 wherein said operating condition detecting means comprises a plurality of detecting devices for detecting operating conditions of the engine including engine speed, air flow rate and throttle valve opening, said capacity changing means being provided in an exhaust pipe of the engine and having a shaft member coupled to a first actuator for actuating the shaft member to control the supercharge pressure, said exhaust bypass valve means being provided in an exhaust manifold of the engine and coupled to a second actuator for actuating the exhaust bypass valve means to control the supercharge pressure, said supercharge pressure control apparatus further comprising a first electromagnetic valve for controlling said first actuator, a second electromagnetic valve for controlling said second actuator, and an electronic control unit for selectively controlling said first and second electromagnetic valves in accordance with the operating conditions of the engine detected by said plurality of detecting devices.
Claim 17
Dependent Claim
32 words
The supercharge pressure control apparatus as set forth in claim 12, wherein a look-up table relating the basic control amounts to the intake air flow rate is stored in the control unit.