US4669542A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Simultaneous recovery of crude from multiple zones in a reservoir
Assignee: Mobil Oil AS
•
Filing: 1984-11-21
•
Granted: 1987-06-02
•
Expires: 2004-11-21
Abstract
Abstract A method for simultaneous recovery of crude oil from multiple zones in a reservoir is disclosed wherein multiple wells, each in fluid communication with at least two hydrocarbon zones separated by an impermeable barrier, are used to produce oil in an enhanced recovery process. The end product from recovery in one zone is used to augment the recovery process in another zone.
Inventors
- 👤 Valad Venkatesan
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-10-31 17:34
CPC Classifications
E; E21; E21B; E21B43/00; E21B43/34; E21B43/40; E21B43/14; E21B43/16; E21B43/162; E21B43/24; E21B43/2401
Claims Analysis
Total Claims: 6
Claim 1
Independent Claim
167 words
A method for simultaneously recovering hydrocarbonaceous fluids from a formation or reservoir containing same having multiple permeability zones separated by a shaley layer comprising: (a) injecting via a first injection means provided in a well an oxygen containing fluid into a first hydrocarbonaceous zone fluidly communicating with a first a production means provided in a well where said first zone is vertically diplaced from a second hydrocarbonaceous zone and separated by said shaley layer; (b) combusting in-situ said first zone and producing hydrocarbonaceous fluids containing carbon dioxide therein as a conbustion by-product from said production means provided in a well; (c) separating carbon dioxide from said hydrocarbonaceous fluids; (d) injecting carbon dioxide into said second zone via a second injection means provided in a well which is fluidly connected to a second production means provided in a well in said second zone while simultaneously producing fluids from said first zone; and (e) producing hydrocarbonaceous fluids containing carbon dioxide from said second zone via said second production means.
Claim 2
Independent Claim
167 words
A method for simultaneously recovering hydrocarbonaceous fluids from a formation or reservoir containing same having multiple permeability zones separated by a shaley layer comprising: (a) injecting via a first injection means provided in a well an oxygen containing fluid into a first hydrocarbonaceous zone fluidly communicating with a first a production means provided in a well where said first zone is vertically diplaced from a second hydrocarbonaceous zone and separated by said shaley layer; (b) combusting in-situ said first zone and producing hydrocarbonaceous fluids containing carbon dioxide therein as a conbustion by-product from said production means provided in a well; (c) separating carbon dioxide from said hydrocarbonaceous fluids; (d) injecting carbon dioxide into said second zone via a second injection means provided in a well which is fluidly connected to a second production means provided in a well in said second zone while simultaneously producing fluids from said first zone; and (e) producing hydrocarbonaceous fluids containing carbon dioxide from said second zone via said second production means.
Claim 3
Dependent Claim
28 words
The method as recited in claim 1 where in step (d) said second injection means is contained within the well containing said first injection means of step (a).
Claim 4
Dependent Claim
28 words
The method as recited in claim 1 where in step (d) said second production means is contained within the well containing said first production means of step (b).
Claim 5
Dependent Claim
27 words
The method as recited in claim 1 where in step (d) said second injection means is contained within the well containing the production means of step (b).
Claim 6
Dependent Claim
27 words
The method as recited in claim 1 where in step (d) said second production means is contained within the well containing the injection means of step (a).
References Cited (Backward Citations)
US2584605A
Cited
US3174543A
Cited
US3580336A
Cited
US3675715A
Cited
US4261420A
Cited
US4344486A
Cited
US4552216A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1990-06-01 | 1990-12-01 | 1991-06-02 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1994-06-01 | 1994-12-01 | 1995-06-02 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1998-06-01 | 1998-12-01 | 1999-06-02 | $7700.00 | Window Closed / Lapsed |